Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 LAdmitted-Fee/PreQual/Technical/Finance | ₹7.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹7.3 LAdmitted-Fee/PreQual/Technical/Finance | ₹7.3 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹7.4 LAdmitted-Fee/PreQual/Technical/Finance | ₹7.4 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹7.6 LAdmitted-Fee/PreQual/Technical/Finance | ₹7.6 L | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹7.7 LAdmitted-Fee/PreQual/Technical/Finance | ₹7.7 L | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | R5SYSTEMS L9 | J.Sangeetha L11 | KM Enterprises L8 | TECWIN INDUSTRIES L6 | N R GOVINDARAJ L10 | KANDY AQUA TECH PRIVATE LIMITED L14 | AR Constructions L2 | GMR ENTERPRISES L1 | RS ENTERPRISES L4 | SAGO SHAM & CO L7 | SELLAPPA PANNEER SELVAM L15 | S.A.MANI RAJ L13 | S ARUMUGAM L5 | M/S. MUTHU ENTERPRISES L3 | KANDY AQUA TECH PRIVATE LIMITED L12 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.001. INSTALLATION OF RO PLANT IN DEVAMPATTU VILLAGE @ AGARAM PANCHAYAT IN MINJUR PANCHAYAT UNION @ TIRUVALLUR DISTRICT UNDER CER - INDIAN OIL LNG PRIVATE LIMITED /2025 - 2026/ RD/TVLR/MJR07 | ||||||||||||||||||
| 2.00 | Earthwork Excavation for Foundation in all soils such as red earth, hard stiff clay soil, stiff black,cotton soil, hard red earth, shales, murrams, gravel, hard rock not required blasting etc complete | 5.94 | CUM | 246.5 ₹1,464.21 | 263 ₹1,562.22 | 220 ₹1,306.8 | 220 ₹1,306.8 | 224 ₹1,330.56 | 6,456 ₹38,348.64 | 195 ₹1,158.3 | 210 ₹1,247.4 | 203 ₹1,205.82 | 150 ₹891 Lowest | 262 ₹1,556.28 | 219 ₹1,300.86 | 206 ₹1,223.64 | 198.1 ₹1,176.71 | 205.36 ₹1,219.84 |
| 3.00 | Supplying and filling in foundation and basement with good sand in layers not more 15cm thick including ramming , watering and compacting etc., completed | 2.5 | CUM | 2,076.5 ₹5,191.25 | 2,059 ₹5,147.5 | 2,000 ₹5,000 | 2,200 ₹5,500 | 1,974 ₹4,935 | 65 ₹162.5 Lowest | 1,717 ₹4,292.5 | 2,100 ₹5,250 | 1,786 ₹4,465 | 2,000 ₹5,000 | 2,319 ₹5,797.5 | 1,812 ₹4,530 | 1,810 ₹4,525 | 1,742.43 ₹4,356.08 | 1,806.24 ₹4,515.6 |
| 4.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, etc | 2.5 | CUM | 5,846.5 ₹14,616.25 | 5,796 ₹14,490 | 5,300 ₹13,250 | 6,500 ₹16,250 | 5,329 ₹13,322.5 | 56 ₹140 Lowest | 4,634 ₹11,585 | 6,000 ₹15,000 | 4,822 ₹12,055 | 5,000 ₹12,500 | 6,261 ₹15,652.5 | 5,151 ₹12,877.5 | 4,885 ₹12,212.5 | 4,703.11 ₹11,757.78 | 4,874.37 ₹12,185.93 |
| 5.00 | Brick work in CM 1:5 mix using country bricks ground moulded of size 23 x 11 x 7 Cm for the following including curing etc., complete complying with standard specifications.(BELOW Basement) | 4.71 | CUM | 6,175 ₹29,084.25 | 6,228 ₹29,333.88 | 5,400 ₹25,434 | 6,450 ₹30,379.5 | 5,407 ₹25,466.97 | 456 ₹2,147.76 Lowest | 4,702 ₹22,146.42 | 6,000 ₹28,260 | 4,893 ₹23,046.03 | 7,000 ₹32,970 | 6,352 ₹29,917.92 | 5,473 ₹25,777.83 | 4,956 ₹23,342.76 | 4,771.91 ₹22,475.7 | 4,946.68 ₹23,298.86 |
| 6.00 | Brick work in CM 1:5 mix using country bricks ground moulded of size 23 x 11 x 7 Cm for the following including curing etc., complete complying with standard specifications.(ABOVE Basement) | 9.49 | CUM | 6,262 ₹59,426.38 | 6,320 ₹59,976.8 | 5,400 ₹51,246 | 6,050 ₹57,414.5 | 5,486 ₹52,062.14 | 56 ₹531.44 Lowest | 4,771 ₹45,276.79 | 6,050 ₹57,414.5 | 4,964 ₹47,108.36 | 7,000 ₹66,430 | 6,445 ₹61,163.05 | 5,550 ₹52,669.5 | 5,028 ₹47,715.72 | 4,841.65 ₹45,947.26 | 5,018.98 ₹47,630.12 |
| 7.00 | Supplying, Fabricating, Erecting structural steel work for roofing welding or bolted type using Square tube and Circular Pipe | 129 | KGS | 105 ₹13,545 | 91.96 ₹11,862.84 | 75 ₹9,675 | 95 ₹12,255 | 92 ₹11,868 | 0.1 ₹12.9 Lowest | 80 ₹10,320 | 95 ₹12,255 | 83 ₹10,707 | 150 ₹19,350 | 106 ₹13,674 | 94 ₹12,126 | 84 ₹10,836 | 80.97 ₹10,445.13 | 83.94 ₹10,828.26 |
| 8.00 | Supplying and fixing colour galvalume sheet roof of 0.47mm thickand steel tubular box section of 100x50x3mm of 1meter interval including priming coat fixing in position with all necessary accessories complete complying with standard specification and as directed by the departmental officers. | 12.15 | SQ.M | 1,041 ₹12,648.15 | 1,087 ₹13,207.05 | 900 ₹10,935 | 950 ₹11,542.5 | 919 ₹11,165.85 | 545 ₹6,621.75 | 799 ₹9,707.85 | 950 ₹11,542.5 | 832 ₹10,108.8 | 300 ₹3,645 Lowest | 1,079 ₹13,109.85 | 927 ₹11,263.05 | 843 ₹10,242.45 | 811.25 ₹9,856.69 | 840.96 ₹10,217.66 |
| 9.00 | Supply and Fixing of UPVC pipe 32mm | 45 | RM | 148 ₹6,660 | 144 ₹6,480 | 125 ₹5,625 | 130 ₹5,850 | 126 ₹5,670 | 45 ₹2,025 Lowest | 110 ₹4,950 | 130 ₹5,850 | 114 ₹5,130 | 200 ₹9,000 | 147 ₹6,615 | 132 ₹5,940 | 116 ₹5,220 | 111.23 ₹5,005.35 | 115.3 ₹5,188.5 |
| 10.00 | Supply and Fixing of 32mm Elbow | 3 | NOS | 43.5 ₹130.5 | 32 ₹96 Lowest | 40 ₹120 | 40 ₹120 | 37 ₹111 | 34 ₹102 | 32 ₹96 Lowest | 40 ₹120 | 34 ₹102 | 100 ₹300 | 42 ₹126 | 39 ₹117 | 34 ₹102 | 32.89 ₹98.67 | 34.1 ₹102.3 |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
13 Aug 2026, 3:00 pmClosed
MINJUR BDO OFFICE
MINJUR BDO OFFICE
INSTALLATION OF RO PLANT IN DEVAMPATTU VILLAGE AT AGARAM PANCHAYAT IN MINJUR
2026_RDTN_688442_7
3249/2022/A2
Open Tender
Civil Works
Item Rate
180 days
MINJUR
CLASS V AND ABOVE
4 documents required · 4 mandatory
₹0
₹10,000
Yes
14 Aug 2026
24 Jul 2026
13 Aug 2026
24 Jul 2026
13 Aug 2026
24 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1. INSTALLATION OF RO PLANT IN DEVAMPATTU VILLAGE @ AGARAM PANCHAYAT IN MINJUR PANCHAYAT UNION @ TIRUVALLUR DISTRICT UNDER CER - INDIAN OIL LNG PRIVATE LIMITED /2025 - 2026/ RD/TVLR/MJR07 | - | - | - | - |
| 2 | Earthwork Excavation for Foundation in all soils such as red earth, hard stiff clay soil, stiff black,cotton soil, hard red earth, shales, murrams, gravel, hard rock not required blasting etc complete | 5.94 | CUM | 263.78 | ₹1,566.85 |
| 3 | Supplying and filling in foundation and basement with good sand in layers not more 15cm thick including ramming , watering and compacting etc., completed | 2.5 | CUM | 2,320.09 | ₹5,800.23 |
| 4 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, etc | 2.5 | CUM | 6,262.32 | ₹15,655.8 |
| 5 | Brick work in CM 1:5 mix using country bricks ground moulded of size 23 x 11 x 7 Cm for the following including curing etc., complete complying with standard specifications.(BELOW Basement) | 4.71 | CUM | 6,353.92 | ₹29,926.96 |
| 6 | Brick work in CM 1:5 mix using country bricks ground moulded of size 23 x 11 x 7 Cm for the following including curing etc., complete complying with standard specifications.(ABOVE Basement) | 9.49 | CUM | 6,446.79 | ₹61,180.04 |
| 7 | Supplying, Fabricating, Erecting structural steel work for roofing welding or bolted type using Square tube and Circular Pipe | 129 | KGS | 107.81 | ₹13,907.49 |
| 8 | Supplying and fixing colour galvalume sheet roof of 0.47mm thickand steel tubular box section of 100x50x3mm of 1meter interval including priming coat fixing in position with all necessary accessories complete complying with standard specification and as directed by the departmental officers. | 12.15 | SQ.M | 1,080.2 | ₹13,124.43 |
| 9 | Supply and Fixing of UPVC pipe 32mm | 45 | RM | 148.1 | ₹6,664.5 |
| 10 | Supply and Fixing of 32mm Elbow | 3 | NOS | 43.8 | ₹131.4 |
stage.html
html • 0.04 MB
finance_827624.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
TenderDocumentMJR07.pdf
Tender Documents • 0.17 MB
BOQ_827624.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].