| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.1 LAccepted-AOC | L1 | Accepted-AOC Agreement with L1 | |
| 2 | L2₹27.0 L+₹91,754 (3.52%)Rejected-AOC | L2 | Rejected-AOC Agreement with L1 | |
| 3 | L3₹29.6 L+₹3.6 L (13.7%)Rejected-AOC | L3 | Rejected-AOC Agreement with L1 |
| Sl No | Description | Qty | Unit | Swarnik Construction L3 | M/S VASUDEV CONSTRUCTION L2 | DALMENDRA SINGH L1 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling brick work or cement concrete in cement mortar including stacking of material with in distance of 60M as per direction of Engineer-in-charge | 33.15 | Cum | 450 ₹14,917.5 | 400 ₹13,260 Lowest | 400 ₹13,260 Lowest |
| 2.00 | Dismantling reinforced cement concrete including stacking of material with in distance of 60M as per direction of Engineer-in-charge | 16.7 | Cum | 550 ₹9,185 | 500 ₹8,350 Lowest | 500 ₹8,350 Lowest |
| 3.00 | Earth work in foundation in all type of soil with all lift and lead including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the Engineer-incharge. | 393 | Cum | 55 ₹21,615 Lowest | 80 ₹31,440 | 60 ₹23,580 |
| 4.00 | Earth work in Making Diversion/Bundha by transported earth with a lead 200 m to 1.00 km i/c excavation, loading, unloading, manual compaction, dressing & all lift complete. | 1,035 | Cum | 150 ₹1,55,250 | 100 ₹1,03,500 | 50 ₹51,750 Lowest |
| 5.00 | Laying Plain Cement Concrete A40 M-10 (1 cement :3 coarse sand :6 graded Stone aggregate) in foundation including all cost of material, labour, T&P etc required for proper completion of work. | 12.25 | Cum | 4,200 ₹51,450 Lowest | 4,500 ₹55,125 | 4,200 ₹51,450 Lowest |
| 6.00 | Laying Plain Cement Concrete A20 M-15 (1 cement :2 coarse sand :4 graded Stone aggregate) in foundation including all cost of material, labour, T&P etc required for proper completion of work. | 81 | Cum | 5,100 ₹4,13,100 | 5,000 ₹4,05,000 | 4,800 ₹3,88,800 Lowest |
| 7.00 | Laying R.C.C. A20 M-25 (1 cement :1 coarse sand :2 graded Stone aggregate) with including all cost of material, labour, T&P etc required for proper completion of work. | 114.5 | Cum | 7,200 ₹8,24,400 | 7,500 ₹8,58,750 | 6,600 ₹7,55,700 Lowest |
| 8.00 | Centering and shuttering for R.C.C. Work including all cost of material, labour, T&P etc required for proper completion of work. | 404.8 | Sqm | 500 ₹2,02,400 Lowest | 700 ₹2,83,360 | 600 ₹2,42,880 |
| 9.00 | Providing & Fixing Steel Reinforcement (TMT Fe-550) with cost of bending, binding, cutting and placing of reinforcement i/c all cost of binding wire, material, labour, T&P etc required for proper completion of work. | 9.3 | MT | 81,000 ₹7,53,300 | 63,000 ₹5,85,900 Lowest | 70,000 ₹6,51,000 |
| 10.00 | Laying Brick on edge soling by using 10 % old Bricks with local sand filling in joints i/c cost of labour, material and T&P etc required for proper completion of work. | 60 | Sqm | 200 ₹12,000 Lowest | 420 ₹25,200 | 380 ₹22,800 |
Tender Value
₹33.6 L
EMD Value
₹67,120
Closing Date
3 Oct 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
OFFICE OF THE EXECUTIVE ENGINEER MEERUT DIVISION G
EE MDGC MEERUT NEAR MAWANA BUS STAND MEERUT
TN-01/EE/2025-26 Reconstruction work of damaged bridge at Km 10.200 of Rajwaha Right Bhola.(Lot-1)
2025_UPIDC_1073001_10
01/EE/2025-26
Open Tender
Civil Works - Canal
Piece-work
90 days
Meerut
As Per Tender Document
2 documents required · 2 mandatory
₹944
₹67,120
1 Dec 2025
28 Sept 2025
3 Oct 2025
28 Sept 2025
3 Oct 2025
28 Sept 2025
Amount
Dismantling brick work or cement concrete in cement mortar including stacking of material with in distance of 60M as per direction of Engineer-in-charge
Dismantling reinforced cement concrete including stacking of material with in distance of 60M as per direction of Engineer-in-charge
Earth work in foundation in all type of soil with all lift and lead including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the Engineer-incharge.
Earth work in Making Diversion/Bundha by transported earth with a lead 200 m to 1.00 km i/c excavation, loading, unloading, manual compaction, dressing & all lift complete.
Laying Plain Cement Concrete A40 M-10 (1 cement :3 coarse sand :6 graded Stone aggregate) in foundation including all cost of material, labour, T&P etc required for proper completion of work.
Laying Plain Cement Concrete A20 M-15 (1 cement :2 coarse sand :4 graded Stone aggregate) in foundation including all cost of material, labour, T&P etc required for proper completion of work.
Laying R.C.C. A20 M-25 (1 cement :1 coarse sand :2 graded Stone aggregate) with including all cost of material, labour, T&P etc required for proper completion of work.
Centering and shuttering for R.C.C. Work including all cost of material, labour, T&P etc required for proper completion of work.
Providing & Fixing Steel Reinforcement (TMT Fe-550) with cost of bending, binding, cutting and placing of reinforcement i/c all cost of binding wire, material, labour, T&P etc required for proper completion of work.
Laying Brick on edge soling by using 10 % old Bricks with local sand filling in joints i/c cost of labour, material and T&P etc required for proper completion of work.
Providing & Fixing PVC Drainage Pipe 75 mm dia i/c all cost of material, labour and T&P etc. Complete.
Providing & Fixing Tar felt ISI Marked at the junction below approach slab with necessary overlap givin a coat of approved mastic paint below the Tar felt i/c all cost of material, labour, T&P etc. Complete.
Earth Work in removing Diversion/Bundha by hydraulic excavator/JCB/equivalent capacity with lift upto 1.5 M & lead upto 90 M including cost of driver/assistant driver, POL, maintenance of mabhine, contractor profit, T&P etc required for proper completion of work.
Finishing wall with wether coat paint of approved make and quality on new work with two coat to give an even shade including supply of all materials, labour, T&P etc. complete.
Painting letters including all cost of materials, labour, T&P etc. complete.
Providing and filling EC bag with local earth, hand sewing with suja & sutli, placing in position including cost of all material, labour, T&P etc. Complete.
Providing and fixing of (30x90 cm left/right object Hazard) retro-reflectorised cautionary, mandatory and informatory sign including all cost of materials, T&P, labour etc. complete.
Brick work in 1:4 CM for laid flat bricks over 12 mm thick cement mortar i/c all cost of material, labour, T&P etc required for proper completion of work.
Cement Pointing Struk Deep on brick masonry in 1:2 cement mortar i/c all cost of material, labour, T&P etc required for proper completion of work.
Laying Brick Ballast (From Dismantaled Brick work) in 1:3:6 (1 cement :3 coarse sand :6 Brick ballast of size 20mm to 40mm) in 100 mm thick i/c all cost of material, labour, T&P etc required for proper completion of work.
Brick work with first class(M-150) bricks in 1 : 4 C.M. i/c cost of all material, labour, T&P etc. Complete.
Providing and fixing marble white stone 25 mm thick of size 0.55mx0.35m with letter digging i/c cost of all material, labour, T&P etc. Complete
M/S VASUDEV CONSTRUCTION (BID ID -5578432)
Swarnik Construction (BID ID -5578425)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .