| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.8 LAccepted-AOC VEER SAVAKAR SARANI BANKURA | L1 | Accepted-AOC Accepted | |
| 2 | L2₹30.0 L+₹18,774.15 (0.63%)Rejected-Finance | L2 | Rejected-Finance Rejected | |
| 3 | L3₹30.2 L+₹40,659.77 (1.36%)Rejected-Finance RADHAKRISHNA MORE | L3 | Rejected-Finance Rejected | |
| 4 | L4₹30.3 L+₹52,565.25 (1.76%)Rejected-Finance RAMPUR HAZRA LANE BANKURA W B | BANKURA | BANKURA | WEST BENGAL | L4 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | SUMIT KUMAR CHAKRABORTY L2 | ABHIJIT MUKHERJEE L4 | PROGRESSIVE ENGINEERS CO OPERATIVE SOCIETY LIMITED L3 | GOENKA ENTERPRISE L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Site Preparation, Temporary Latrine, Placement & levelling of Rig Machine,Mast hoisting andCasing drilling (Upto 6 mtr.)Placement of Casing with all allied works necessary to commence drilling woks and wind up of all machineries after completion of Drilling. | 1 | L.S | 64,250 ₹64,250 | 65,000 ₹65,000 | 64,500 ₹64,500 | 64,145 ₹64,145 Lowest |
| 2.00Drilling by Direct Rotary method of drilling using 9 7/8” dia.bit for pilot bore follwed by subsequently reaming using 12 1/4” dia. ,15 " dia. and 17.5" dia. Rock Roller Bits/Drag Bits in consolidated, semi consolidated and soft formation up to required depth including casing boring and casing lowering as required including cost of fuels and lubricants etc. as required for drilling. | |||||||
| 3.00Note: | |||||||
| 4.001)Rate only for pilot drilling will be @ 50%. of item rate. 2)Rate for reaming by 12 1/4 " dia. bit will be @ 14% of item rate. 3)Rate for reaming by 15 " dia. bit will be @ 16% of item rate. 4)Rate for reaming by 17.5 " dia. bit will be @ 20% of item rate. | |||||||
| 4.10 | a) From 6 Mtr. to 60 Mtr. | 54 | /mtr. | 885 ₹47,790 | 890 ₹48,060 | 886 ₹47,844 | 884 ₹47,736 Lowest |
| 4.20 | b) From 60 Mtr. to 90 Mtr. | 30 | /mtr. | 975 ₹29,250 | 980 ₹29,400 | 978 ₹29,340 | 973 ₹29,190 Lowest |
| 4.30 | c) From 90 Mtr. to 120 Mtr | 30 | /mtr. | 1,080 ₹32,400 | 1,088 ₹32,640 | 1,085 ₹32,550 | 1,070 ₹32,100 Lowest |
| 4.50 | d) From 120 Mtr. to 150 Mtr | 30 | /mtr. | 1,178 ₹35,340 | 1,182 ₹35,460 | 1,180 ₹35,400 | 1,177 ₹35,310 Lowest |
| 4.60 | e) From 150 Mtr. to 180 Mtr. | 15 | /mtr. | 1,297 ₹19,455 | 1,300 ₹19,500 | 1,298 ₹19,470 | 1,295 ₹19,425 Lowest |
| 5.00 | Lowering the tube well assembly (UPVC Casing pipe ,well pipe, strainer along with UPVC accessories) vertically in a position with proper lowering arrangement by applying necessary jointing compound including labour cost for subsequent gravel packing and machine operation cost etc. | 1 | L.S | 26,600 ₹26,600 | 26,700 ₹26,700 | 26,650 ₹26,650 | 26,570 ₹26,570 Lowest |
Tender Value
Refer Docs
EMD Value
₹60,000
Closing Date
5 Jun 2026, 6:00 pmClosed
Executive Engineer, BMD, PHED
Office of the Executive Engineer. Bankura Mechanical Division. P.H.E. Dte. Ailakundi, PO Kenduadihi, Bankura 722102.
Construction of Big Dia Rig Bored Tube well and installation of Pumping machinery at Bishnupur District Hospital under Bankura Mechanical Division P.H.E Dte
2026_PHED_1024011_12
WBPHED/EE/BMD/NIeT-1 OF 2026-2027
Open Tender
MECHANICAL
Item Rate
45 days
Bankura
Please refer Tender documents.
5 documents required · 5 mandatory
₹60,000
Yes
20 Jul 2026
20 May 2026
8 Jun 2026
20 May 2026
5 Jun 2026
20 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site Preparation, Temporary Latrine, Placement & levelling of Rig Machine,Mast hoisting andCasing drilling (Upto 6 mtr.)Placement of Casing with all allied works necessary to commence drilling woks and wind up of all machineries after completion of Drilling. | 1 | L.S | - | - |
| 2Drilling by Direct Rotary method of drilling using 9 7/8” dia.bit for pilot bore follwed by subsequently reaming using 12 1/4” dia. ,15 " dia. and 17.5" dia. Rock Roller Bits/Drag Bits in consolidated, semi consolidated and soft formation up to required depth including casing boring and casing lowering as required including cost of fuels and lubricants etc. as required for drilling. | |||||
| 41)Rate only for pilot drilling will be @ 50%. of item rate. 2)Rate for reaming by 12 1/4 " dia. bit will be @ 14% of item rate. 3)Rate for reaming by 15 " dia. bit will be @ 16% of item rate. 4)Rate for reaming by 17.5 " dia. bit will be @ 20% of item rate. | |||||
| 4.1 | a) From 6 Mtr. to 60 Mtr. | 54 | /mtr. | 4 | ₹216 |
| 4.2 | b) From 60 Mtr. to 90 Mtr. | 30 | /mtr. | 5 | ₹150 |
| 4.3 | c) From 90 Mtr. to 120 Mtr | 30 | /mtr. | 6 | ₹180 |
| 4.5 | d) From 120 Mtr. to 150 Mtr | 30 | /mtr. | 7 | ₹210 |
| 4.6 | e) From 150 Mtr. to 180 Mtr. | 15 | /mtr. | 8 | ₹120 |
| 5 | Lowering the tube well assembly (UPVC Casing pipe ,well pipe, strainer along with UPVC accessories) vertically in a position with proper lowering arrangement by applying necessary jointing compound including labour cost for subsequent gravel packing and machine operation cost etc. | 1 | L.S | 9 | ₹9 |
| 6 | Cost of Consumables for drilling rigs and machineries. | 1 | L.S | 10 | ₹10 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.35 MB
Tendernotice_2.pdf
PDF • 1.11 MB
BOQ_2517682.xls
BOQ • 0.41 MB
datecorrigendum.pdf
PDF • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .