Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.5 LAccepted-AOC NEAR PLOT NO 55 INDUSTRIAL AREA KHARMORA KORBA KORBA KORBA CHHATTISGARH 495677 | KORBA | CHHATTISGARH | 495677 | 1 | Accepted-AOC Eligible bidder as per Nit. |
Tender Value
₹4.7 L
EMD Value
₹5,900
Closing Date
10 Jul 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SO ENM AHQ GEVRA AREA
ENM AHQ GEVRA AREA
Work of complete repairing / rewinding of 02 Nos. Motors of 600 KW, 6.6 KV, 1485 RPM of Marathan Make HT Induction Motor of Gevra project.
2023_SECL_282031_1
SECL/GA/ENM/23-24/E-TENDER/35 Date-20-06-2023
Open Tender
Electrical and Maintenance Works
Item Rate
60 days
Gevra Project
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,900
11 Aug 2023
23 Jun 2023
12 Jul 2023
23 Jun 2023
10 Jul 2023
24 Jun 2023
23 Jun 2023 - 1 Jul 2023
Amount
Work of complete repairing, rewinding and testing of 02 Nos, 600 KW, 6.6 KV, 1485 RPM, of Marathan Make HT Induction Motor S.N-3F660566/7 and S.N-3F660566/2 along with test report. SCOPE OF WORK A) Complete replacement of winding with new 99.96% grade( F - Class insulation copper conductor) as per design. Total no. of Coil-60 Nos and Strip Size- 3 x 7 mm. B) Rate is inclusive of Labour charges and contractor profit. C) All old materials including copper will be retained by repairer. D) Bidders are requested to thoroughly inspect the job lying at our site before participating in tender. E) All materials shall be routed through Regional stores. F) To and fro transportation shall be borne by bidder. G) Cleaning, checking, brazing of connection, heating, repairing of bearing seat of Rotor, painting and testing etc. NOTE- Weight of Copper for 02 Motors= 2 X 219 = 438 Kg.
Cost of insulating materials changing of complete with new insulation.
Replacement of New Ball Bearing (NU324).
Replacement of New Rollar Bearing (6324).
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
techsummary_292020.pdf
PDF • 0.11 MB
finsummary_292020.pdf
PDF • 0.11 MB
LOA-35-282031.pdf
PDF • 2.11 MB
finance_292020.pdf
PDF • 0.02 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .