| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
12 Jul 2021, 11:00 amClosed
Superintending Engineer
As Per Tender Docoment
installation of 11 KV outgoing VCB at power substation Teliaghat
2021_PVVNL_601603_1
33/21-22
Open Tender
Electrical Works
Item Rate
Superintending Engineer
installation of 11 KV outgoing VCB at power substation Teliaghat
3 documents required · 3 mandatory
₹1,180
Superintending Engineer EDC I Bulandshahr
₹2,000
Yes
14 Jul 2021
6 Jul 2021
12 Jul 2021
6 Jul 2021
12 Jul 2021
6 Jul 2021
Amount
fo|qr forj.k [k.M&[kqtkZ vUrZxr 11dsoh ohlhch LFkkfir djus o 11 dsoh fj&xzqfiax laca/kh dk;ZA
Carriage of fallowings from ESC. BSR to JE Store on kachcha pacaa road including loading and unloading chagres at both ends, rcquricd for proper completion of work, distance about to 60 Kms.
PCC Pole 8.5 mtr Long.
Carriage of All line Material from store center BSR to j.e store Sub station as ACSR Weasel conductor, ABC conductor GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator etc.
Carriage of fallowings from JE Store to pit site on kachcha pacaa road including loading and unloading chagres at both ends, rcquricd for proper completion of work, distance about to 20 Kms.
PCC Pole 8.5 mtr Long.
Erection of Single pole support including complete 1 IT fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Grouting of Single support shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, birck ballast/stone ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Carriage of All line Material from J.E store Sub station to Pit Site ACSR Weasel conductor, ABC conductor GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator etc.
Cutting /drilling /Welding of MS Angle iron for making guarding angle size 65x65x6/50x50x6 mm including the work of fixing the bracket on PCC/ST pole for construction of the line.
Laying, sagging. Stringing and binding and jumpering of ACSR Weisal , rabbit, dog newly erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T&P, carrier etc. requried for proper completion of work.
ACSR weisal conductor
Fixing of Earthing rod
Fixing of pin insulator
Fixing disc insulator
Fixing of V type xarm.
The folloing material is required to be supplied by the contractor.
Holding clamp.
F Clamp
Earth clamp
Installation of 11 KV outgoing VCB at power substation Teliaghat.
Carriage of 11 KV VCB O/G CTR 200/100/5 A from ESC. BSR to pit site on kachcha pacaa road including loading and unloading chagres at both ends, rcquricd for proper completion of work, distance about to 60 Kms.
Unloading 11 KV outgoing VCB to power substation Teliaghat.
Installation of 11 KV outgoing VCB at power substation Teliaghat.
Bolt & nut off size.
Vivek Electricals
M/S TUSHAR CONSTRUCTION
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .