Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.3 CrAdmitted-Finance 1804 SECTOR 2 ROHTAK 124001 | ROHTAK | HARYANA | 124001 | ₹7.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹7.6 CrAdmitted-Finance 28 29 GALI NO 05 MAHABIR PARK 124507 | BAHADURGARH | JHAJJAR | HARYANA | 124507 | ₹7.6 Cr | L2 | Admitted-Finance |
| 3 | L3₹7.8 CrAdmitted-Finance 858 SECTOR 23 127021 | BHIWANI | HARYANA | 127021 | ₹7.8 Cr | L3 | Admitted-Finance |
| 4 | L4₹7.9 CrAdmitted-Finance 14 CHAHAR CONSTRUCTION CO ADARSH NAGAR NEAR ROHILLA COMMUNICATION 124103 | JHAJJAR | HARYANA | 124103 | ₹7.9 Cr | L4 | Admitted-Finance |
| 5 | L5₹8.2 CrAdmitted-Finance VPO BERLA TEHSIL AND DISTT CHARKHI DADRI HARYANA | CHARKI DADRI | HARYANA | 127022 | ₹8.2 Cr | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S SHREE BALAJI BUILDERS L3 | Narender Singh Contractor L1 | OM PARKASH CONT L5 | Chahar Construction Co L4 | Suresh Kumar L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Supplying erection, testing of fully automatic electric control panel board for Pump Chamber consisting of MS sheet of thickness 14 gauge duly painted box type floor mounted made of angle Frame containing 1 no. fully automatic air brake starter suitable for Motor of the
following capacity, Min switch of suitable range with HRC fuse, 1 no. volt meter (0 to 500 volts), 1 No. Amp.Meter of O to 100 amp. 3 sets of indicating lamp capacitor of suitable capacity and 1 no. single phase preventers with the timer switch including wiring in panel board and
suitable electric energy meter wiring in Electric Control Panel Board complete in all respect as per specification given in Schedule No. II, Including MCB, suitable,Capacitor, Wooden Box etc as per site requirement complete in fal respect.
Make:- LandT, SIEMENS, BCH, SCHNEIDER.
75 HP Motor control panel | 16 | Each | 1,15,000 ₹18.4 L | 1,42,000 ₹22.7 L | 1,41,000 ₹22.6 L | 1,05,000 ₹16.8 L | 90,000 ₹14.4 L |
| 2.00 | Cleaning of underground tank i.e dewatering silt clearance, scrubbing the surface, Air jetting Vacuum sucking, applying chemical waste at surface of the tank. UGT Tank | 1,65,00,000 | Litre | 0.5 ₹82.5 L | 0.06 ₹9.9 L | 0.08 ₹13.2 L | 0.1 ₹16.5 L | 0.1 ₹16.5 L |
| 3.00 | Repair and maintenance of Pumping machinery at boosting and tubewells including provision of making standby arrangement and replacing the machinery in 24 hours complete in all respect | 24 | Per Month | 55,000 ₹13.2 L | 72,000 ₹17.3 L | 64,000 ₹15.4 L | 79,900 ₹19.2 L | 64,000 ₹15.4 L |
| 4.00 | Supplying of drinking water tanker of 5000 litre capacity complete in all respect | 4,800 | Each | 950 ₹45.6 L | 690 ₹33.1 L | 500 ₹24 L | 990 ₹47.5 L | 800 ₹38.4 L |
| 5.00 | Engagement of pump/ tubewell operators-cum-keyman at boosting station and tubewells for smooth running of water supply services.. | 1,056 | Per Month | 22,664 ₹2.4 Cr | 15,000 ₹1.6 Cr | 18,000 ₹1.9 Cr | 21,383 ₹2.3 Cr | 17,500 ₹1.8 Cr |
| 6.00 | Repair and maintenance of Pumping machinery at boosting and tubewells including provision of making standby arrangement and replacing the
machinery in 24 hours complete in all respect | 24 | Per Month | 65,000 ₹15.6 L | 39,000 ₹9.4 L | 88,000 ₹21.1 L | 79,900 ₹19.2 L | 64,000 ₹15.4 L |
| 7.00 | Repair and maintenance of Pumping machinery at boosting and tubewells including provision of making standby arrangement and replacing the machinery in 24 hours complete in all respect... | 24 | Per Month | 85,000 ₹20.4 L | 57,000 ₹13.7 L | 1,01,000 ₹24.2 L | 79,900 ₹19.2 L | 64,000 ₹15.4 L |
| 8.00 | Repair and maintenance of Pumping machinery at boosting and tubewells including provision of making standby arrangement and replacing the machinery in 24 hours complete in all respect.... | 48 | Per Month | 50,000 ₹24 L | 72,000 ₹34.6 L | 1,10,000 ₹52.8 L | 79,900 ₹38.4 L | 64,000 ₹30.7 L |
| 9.00 | Maintenance of water supply network line from dia 4` to 16` (including repair/replacement of leakage in pipeline, repair/replacement of sluice valves, NRVs, Inspection and rectifying contaminated water problem and any other network related issues) Complete in all respect
(For one Maintenance Team Covering Complete Jurisdiction of each Ward Area) | 96 | Per Month | 55,000 ₹52.8 L | 1,02,000 ₹97.9 L | 1,60,000 ₹1.5 Cr | 69,000 ₹66.2 L | 1,55,555 ₹1.5 Cr |
Tender Value
₹9.3 Cr
EMD Value
₹18.7 L
Closing Date
20 Apr 2026, 12:00 pmClosed
Pradeep Kumar
Municipal Corporation Gurugram
Operation and Maintenance of Water Supply Networkincluding Running, Repair and Maintenance of Boosting Stations, Tubewells, Rising Mains, Distribution Pipelines and Allied Water Supply Works in Ward Nos. 11, 14, 15 and 18, Division-1B, Zone-1, MCG.2
2026_HRY_512936_1
20264B19C4E3 BB11 40AA 8E28 8976BDE9FE9D285ULB
Open Tender
Civil Works
760 days
Gurugram
2 documents required · 2 mandatory
₹20,000
₹18.7 L
Yes
15 Jun 2026
4 Apr 2026
20 Apr 2026
4 Apr 2026
20 Apr 2026
4 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying erection, testing of fully automatic electric control panel board for Pump Chamber consisting of MS sheet of thickness 14 gauge duly painted box type floor mounted made of angle Frame containing 1 no. fully automatic air brake starter suitable for Motor of the
following capacity, Min switch of suitable range with HRC fuse, 1 no. volt meter (0 to 500 volts), 1 No. Amp.Meter of O to 100 amp. 3 sets of indicating lamp capacitor of suitable capacity and 1 no. single phase preventers with the timer switch including wiring in panel board and
suitable electric energy meter wiring in Electric Control Panel Board complete in all respect as per specification given in Schedule No. II, Including MCB, suitable,Capacitor, Wooden Box etc as per site requirement complete in fal respect.
Make:- LandT, SIEMENS, BCH, SCHNEIDER.
75 HP Motor control panel | - | Each | - | - |
| 2 | Cleaning of underground tank i.e dewatering silt clearance, scrubbing the surface, Air jetting Vacuum sucking, applying chemical waste at surface of the tank. UGT Tank | - | Litre | - | - |
| 3 | Repair and maintenance of Pumping machinery at boosting and tubewells including provision of making standby arrangement and replacing the machinery in 24 hours complete in all respect | - | Per Month | - | - |
| 4 | Supplying of drinking water tanker of 5000 litre capacity complete in all respect | - | Each | - | - |
| 5 | Engagement of pump/ tubewell operators-cum-keyman at boosting station and tubewells for smooth running of water supply services.. | - | Per Month | - | - |
| 6 | Repair and maintenance of Pumping machinery at boosting and tubewells including provision of making standby arrangement and replacing the
machinery in 24 hours complete in all respect | - | Per Month | - | - |
| 7 | Repair and maintenance of Pumping machinery at boosting and tubewells including provision of making standby arrangement and replacing the machinery in 24 hours complete in all respect... | - | Per Month | - | - |
| 8 | Repair and maintenance of Pumping machinery at boosting and tubewells including provision of making standby arrangement and replacing the machinery in 24 hours complete in all respect.... | - | Per Month | - | - |
| 9 | Maintenance of water supply network line from dia 4` to 16` (including repair/replacement of leakage in pipeline, repair/replacement of sluice valves, NRVs, Inspection and rectifying contaminated water problem and any other network related issues) Complete in all respect
(For one Maintenance Team Covering Complete Jurisdiction of each Ward Area) | - | Per Month | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
BOQ_591753.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid