| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAccepted-AOC 00 KALU KUWAN BANDA BANDA UTTAR PRADESH 210001 UDYAM UP 13 0015641 09EHAPS9028H1ZX R G | BANDA | UTTAR PRADESH | 210001 | ₹1.2 L Quoted ₹97,788 | L1 | Accepted-AOC As per TCR |
| 2 | Rejected-Technical BANSI POST BINA SONBHADRA UP PIN 231220 | BINA | SONBHADRA | UTTAR PRADESH | 231220 | - | - | Rejected-Technical As per TCR |
| 3 | Rejected-Technical | - | - | Rejected-Technical As per TCR |
| 4 | Rejected-Technical | - | - | Rejected-Technical As per TCR |
| 5 | Rejected-Technical | - | - | Rejected-Technical As per TCR |
| Sl No | Description | Qty | Unit | SHAH APEX GROUP SERVICES PRIVATE LIMITED L6 | SHREE SWASTIK CONSTRUCTION COMPANY L5 | MISHRA ENTERPRISES L3 | M/S. SHANKAR KUMAR SINGH L4 | M/s PIPIRANT ENTERPRISES L2 | MAA BHAGWATI ENTERPRISES L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and remaining of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within lead of 50 m. (all kind of soil) [Code: 2.6.1 of analysed DSR-2023] ( for each job 0.072 Cum @ INR 152.50 = INR 10.958) | 300 | Job | 10 ₹3,000 | 8 ₹2,400 | 8 ₹2,400 | 9 ₹2,700 | 8 ₹2,400 | 10.96 ₹3,288 |
| 2.00 | U PVC pipes 75 mm dia [Code: 7188 of DSR-2023] ( For each job 2.00 meter @ inr 70 = INR 140.00) | 300 | Job | 139 ₹41,700 | 126 ₹37,800 | 100 ₹30,000 | 120 ₹36,000 | 100 ₹30,000 | 80 ₹24,000 |
| 3.00 | Providing and fixing of (Red & White) fluorescent strips in four bands -1.56 Sqft. (i.e. 0.145 Sq.Mtr.) [Code: 8690 of DSR-2023] ( For each job 0.132 Sqm @ INR 1345.00 = INR 177.540) | 300 | Job | 172 ₹51,600 | 160 ₹48,000 | 125 ₹37,500 | 152 ₹45,600 | 100 ₹30,000 | 120 ₹36,000 |
| 4.00 | Painting with synthetic enamel paint of approved brand and manufacture to given an even shade: Two or more coats on new work. [Code: 13.61.1 of analyzed DSR-2023] (For each jon 0.628 Sqm @ INR 95.70 = INR 60.099) | 300 | Job | 58 ₹17,400 | 54 ₹16,200 | 50 ₹15,000 | 52 ₹15,600 | 47 ₹14,100 | 35 ₹10,500 |
| 5.00 | Labour charge (loading, unloading, handling)1/10 Nos. x 1 shift x 1 days | 300 | Job | 54 ₹16,200 | 49 ₹14,700 | 45 ₹13,500 | 47 ₹14,100 | 40 ₹12,000 | 30 ₹9,000 |
| 6.00 | Transportation charges in the mine area | 300 | Job | 63 ₹18,900 | 58 ₹17,400 | 45 ₹13,500 | 56 ₹16,800 | 50 ₹15,000 | 50 ₹15,000 |
| 7.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - | - | - | - |
Updated dates
Tender Value
₹1.8 L
EMD Value
₹2,300
Closing Date
14 Mar 2026, 10:00 amClosed
P P Gupta
O/o AGM Bina Project, NCL Anapara Sonebhadra UP Pincode 231220
Fabrication, transportation, and installation of 300 Nos. of Indicator Post wrapped with fluorescent tape, along sides and divider of haul road at Bina Project.
2026_NCL_352558_1
Bina/SO(Min)/Tender/25-26/01 dt. 26.02.2026
Open Tender
Miscellaneous Works
30 days
Bina Project, NCL
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,300
12 May 2026
26 Feb 2026
16 Mar 2026
27 Feb 2026
14 Mar 2026
27 Feb 2026
27 Feb 2026 - 7 Mar 2026
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and remaining of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within lead of 50 m. (all kind of soil) [Code: 2.6.1 of analysed DSR-2023] ( for each job 0.072 Cum @ INR 152.50 = INR 10.958)
U PVC pipes 75 mm dia [Code: 7188 of DSR-2023] ( For each job 2.00 meter @ inr 70 = INR 140.00)
Providing and fixing of (Red & White) fluorescent strips in four bands -1.56 Sqft. (i.e. 0.145 Sq.Mtr.) [Code: 8690 of DSR-2023] ( For each job 0.132 Sqm @ INR 1345.00 = INR 177.540)
Painting with synthetic enamel paint of approved brand and manufacture to given an even shade: Two or more coats on new work. [Code: 13.61.1 of analyzed DSR-2023] (For each jon 0.628 Sqm @ INR 95.70 = INR 60.099)
Labour charge (loading, unloading, handling)1/10 Nos. x 1 shift x 1 days
Transportation charges in the mine area
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_367484.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.21 MB
BOQ_367484.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid