Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.0 LAdmitted-Finance | ₹34.0 L | L1 | Admitted-Finance |
| 2 | L2₹35.0 L+₹1.0 L (2.96%)Admitted-Finance | ₹35.0 L+₹1.0 L (2.96%) | L2 | Admitted-Finance |
| 3 | L3₹35.6 L+₹1.6 L (4.71%)Admitted-Finance | ₹35.6 L+₹1.6 L (4.71%) | L3 | Admitted-Finance |
| 4 | L4₹35.9 L+₹1.9 L (5.51%)Admitted-Finance | ₹35.9 L+₹1.9 L (5.51%) | L4 | Admitted-Finance |
| 5 | L5₹36.5 L+₹2.5 L (7.40%)Admitted-Finance 15 BOH ROAD DEFENCE ENCLAVE AMBALA CANTT 133001 HR | AMBALA | HARYANA | 133001 | ₹36.5 L+₹2.5 L (7.40%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SINGH CONST CO L9 | VIRINDER SINGH L10 | s l sharma and sons L2 | MAHADEV ENTERPRISES L5 | m/s shanti trading company L7 | M/S Ashok Kumar Jaswal L6 | M/s LAL DAYAL CONSTRUCTION CO L3 | MODI CONSTRCUTION COMPANY L8 | khajuria builders L4 | vijay constrction co L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Taking down cement or cement lime plaster of any description on brick or stone walls and concrete surface etc including raking out joints hacking for key scrubbing down with water etc complete all as specified and directed by Engr-in-charge. | 33 | Sqm | 10 ₹330 | 2 ₹66 Lowest | 2 ₹66 Lowest | 10 ₹330 | 10 ₹330 | 6 ₹198 | 7 ₹231 | 5 ₹165 | 10 ₹330 | 10 ₹330 |
| 2.00 | M & L for dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises complete all as specified and directed by Engr-in-charge. | 43 | Sqm | 20 ₹860 | 2 ₹86 Lowest | 5 ₹215 | 10 ₹430 | 10 ₹430 | 3 ₹129 | 7 ₹301 | 50 ₹2,150 | 10 ₹430 | 13 ₹559 |
| 3.00 | Demolition and breaking up drain pipes 150mm dia (Salt glazed ware, AC or Reinforced concrete) set in cement mortar complete all as specified and directed by Engr-in-charge | 48 | RM | 200 ₹9,600 | 10 ₹480 | 2 ₹96 Lowest | 10 ₹480 | 10 ₹480 | 8 ₹384 | 7 ₹336 | 30 ₹1,440 | 5 ₹240 | 9 ₹432 |
| 4.00 | Demolition of brick/stone masonry built in CM.incl all quoins ,arches,pillars , but excluding ashlar facings, dressed stone work and precasr concrete articles complete all as specified and directed by Engr-in-charge | 3.5 | Cum | 200 ₹700 | 50 ₹175 | 20 ₹70 Lowest | 200 ₹700 | 80 ₹280 | 95 ₹332.5 | 150 ₹525 | 100 ₹350 | 100 ₹350 | 160 ₹560 |
| 5.00 | Demolition of cement concrete (unreinforced) in ground floors and pavings n exc 15 cm thickness (below or above ground level) | 6.94 | Cum | 200 ₹1,387.5 | 100 ₹693.75 | 20 ₹138.75 Lowest | 200 ₹1,387.5 | 82 ₹568.88 | 105 ₹728.44 | 150 ₹1,040.62 | 100 ₹693.75 | 100 ₹693.75 | 210 ₹1,456.88 |
| 6.00 | Surface excavation in soft/loose soil, not exceeding 30cm deep and averaging 15cm deep and getting out of soft/loose soil complete all as specified and directed by Engr-in-charge. | 592 | Sqm | 20 ₹11,840 | 1 ₹592 Lowest | 10 ₹5,920 | 20 ₹11,840 | 30 ₹17,760 | 6 ₹3,552 | 13 ₹7,696 | 90 ₹53,280 | 10 ₹5,920 | 24 ₹14,208 |
| 7.00 | Excavating in trenches n.exc 1.5m wide and n.exc 1.5m in depth in any type of soil/strata for foundation, etc, or for shafts, wells, drain pipes and getting out complete all as specified and directed by Engr-in-charge | 20.47 | Cum | 120 ₹2,456.44 | 150 ₹3,070.55 | 150 ₹3,070.55 | 160 ₹3,275.26 | 150 ₹3,070.55 | 195 ₹3,991.72 | 150 ₹3,070.55 | 160 ₹3,275.26 | 80 ₹1,637.63 Lowest | 135 ₹2,763.5 |
| 8.00 | Excavation in trenches and exceeding 1.5m wide and not exc 1.5m in depth in hard/dense soil and getting out all as specified and directed by Engr-in-charge | 44.06 | Cum | 150 ₹6,609.6 | 150 ₹6,609.6 | 150 ₹6,609.6 | 150 ₹6,609.6 | 150 ₹6,609.6 | 270 ₹11,897.28 | 150 ₹6,609.6 | 160 ₹7,050.24 | 100 ₹4,406.4 Lowest | 190 ₹8,372.16 |
| 9.00 | Excavation in trenches in soft/loose soil not exceeding 1.5 M wide and not exceeding 1.5 Mtr deep and getting out including filling bottom surface to required level or slope for laying of pipes/ cables complete all as specified and directed by Engr-in-charge | 11.23 | Cum | 180 ₹2,021.4 | 150 ₹1,684.5 | 150 ₹1,684.5 | 150 ₹1,684.5 | 150 ₹1,684.5 | 195 ₹2,189.85 | 150 ₹1,684.5 | 160 ₹1,796.8 | 100 ₹1,123 Lowest | 210 ₹2,358.3 |
| 10.00 | Excavating in post holes ( or similar holes ) each n.exc 0.5 cum in soft /loose soil getting out ,returning filling in and ramming around in layers not exceeding 25 cm complete all as specified and directed by Engr-in-charge. | 68 | Each | 80 ₹5,440 | 150 ₹10,200 | 100 ₹6,800 | 90 ₹6,120 | 150 ₹10,200 | 95 ₹6,460 | 100 ₹6,800 | 270 ₹18,360 | 70 ₹4,760 Lowest | 80 ₹5,440 |
Tender Value
₹49.0 L
EMD Value
₹98,000
Closing Date
22 Aug 2026, 6:00 pmClosed
GE SOUTH UDHAMPUR
GE SOUTH UDHAMPUR
SPL REPAIR REPLACEMENT OF ELECTRICAL WIRING AND ADDN ALTN TO TEA ROOM OF BLDG NO NP05 OF RR DTE AND OTHER SANCTION WORK UNDER GE SOUTH UDHAMPUR
2026_MES_780699_1
GE/S(U)-87/2026-27
Open Tender
Civil Works
Works
180 days
GE SOUTH UDHAMPUR
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
GE SOUTH UDHAMPUR
₹98,000
25 Aug 2026
24 Jul 2026
24 Aug 2026
24 Jul 2026
22 Aug 2026
7 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking down cement or cement lime plaster of any description on brick or stone walls and concrete surface etc including raking out joints hacking for key scrubbing down with water etc complete all as specified and directed by Engr-in-charge. | 33 | Sqm | - | - |
| 2 | M & L for dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises complete all as specified and directed by Engr-in-charge. | 43 | Sqm | - | - |
| 3 | Demolition and breaking up drain pipes 150mm dia (Salt glazed ware, AC or Reinforced concrete) set in cement mortar complete all as specified and directed by Engr-in-charge | 48 | RM | - | - |
| 4 | Demolition of brick/stone masonry built in CM.incl all quoins ,arches,pillars , but excluding ashlar facings, dressed stone work and precasr concrete articles complete all as specified and directed by Engr-in-charge | 3.5 | Cum | - | - |
| 5 | Demolition of cement concrete (unreinforced) in ground floors and pavings n exc 15 cm thickness (below or above ground level) | 6.94 | Cum | - | - |
| 6 | Surface excavation in soft/loose soil, not exceeding 30cm deep and averaging 15cm deep and getting out of soft/loose soil complete all as specified and directed by Engr-in-charge. | 592 | Sqm | - | - |
| 7 | Excavating in trenches n.exc 1.5m wide and n.exc 1.5m in depth in any type of soil/strata for foundation, etc, or for shafts, wells, drain pipes and getting out complete all as specified and directed by Engr-in-charge | 20.47 | Cum | - | - |
| 8 | Excavation in trenches and exceeding 1.5m wide and not exc 1.5m in depth in hard/dense soil and getting out all as specified and directed by Engr-in-charge | 44.06 | Cum | - | - |
| 9 | Excavation in trenches in soft/loose soil not exceeding 1.5 M wide and not exceeding 1.5 Mtr deep and getting out including filling bottom surface to required level or slope for laying of pipes/ cables complete all as specified and directed by Engr-in-charge | 11.23 | Cum | - | - |
| 10 | Excavating in post holes ( or similar holes ) each n.exc 0.5 cum in soft /loose soil getting out ,returning filling in and ramming around in layers not exceeding 25 cm complete all as specified and directed by Engr-in-charge. | 68 | Each | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
TENDER87.pdf
Tender Documents • 1.05 MB
BOQ_874537.xls
BOQ • 0.33 MB
AMEND2.pdf
PDF • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .