| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.7 CrAccepted-AOC H NO 30 SECTOR 13 PART 2 HISAR 125001 | HISAR | HARYANA | 125001 | L1 | Accepted-AOC Rate on lower side | |
| 2 | Rejected-Technical | - | Rejected-Technical Technical bid found non responsive. | |
| 3 | Rejected-Technical SEWA NAGAR COLONY NEAR JOGIO KI DHARAMSHALA BHIWANI 127021 | BHIWANI | BHIWANI | HARYANA | 127021 | - | Rejected-Technical Technical bid found non responsive. |
| Sl No | Description | Qty | Unit | Punia Construction Company L1 |
|---|---|---|---|---|
| 1.00 | FOUNDATION - PILES & PILE CAPS
Bored cast-in-situ M35 grade with minimum cement content 350 kg per cum, RCC piles of 1200 mm diameter in all kinds of soil (including hard & boulders) with Hydraulic Rig excluding cost of steel reinforcement but including the cost of Shoe and the length of pile to be embedded in the pile cap etc, (Length of pile for payment shall be measured from top of shoe to the bottom of the pile cap). All complete as per drawing and conforming to section 1100 and 1700 of MORTH specifications of latest edition and clause 709 of IRC: 78-2000/latest edition including cost of bentonite slurry, initial vertical and lateral load tests, routine load tests and removal of excavated earth with all lifts and lead etc. complete in all respect. (i) 1200 dia piles (A) The scope of work in the above items include: (1) The cost of all initial layout of piles and setting out, initial excavation, if any (2 a) The cost of boring through all types of soils/existing road/ pavement, removal of all obstruction like boulders, old foundation concrete or rock to be paid in relevant item above by chiseling or any other method as approved by the Engineer-in-charge. If a bore is abandoned for any reason no payment shall be made for such incomplete boring and shifting of the equipments (2 b) The cost of filling up of the empty bore, if required (3) The cost of preparation, circulation and handling of bentonite slurry. (4) The cost of disposal of all spoil, bentonite waste to keep the work area neat. (5) The cost of providing temporary liner and its withdrawal, if required below adjoining ground level (irrespective of the R.L of the adjoining ground level) for vertical piles) (6) The cost of providing and mixing all ingredients of cement concrete (except reinforcement steel) including admixtures, with batching plant, transporation, placement of concrete by tremie pipe for the required lengths of pile including providing cover blocks, stiffeners, handling bars etc. for safe handling of reinforcement cage. (7) The cost of breaking of pile head not earlier than 3 days after concreting and to remove spoil concrete to bring the pile head to the socketing level including cleaning and arranging the extended reinforcement bars as per drawings. (8) The cost of working for all leads, lifts, pumping / bailing out of water, labour, material and equipment etc. 9) The cost of mobilizing to site, installation at different locations transferring / dismantling, shifting, reinstalling and removal from site of the piling rigs and / or other equipments and all accessories including working plateforms) (10) The cost of identification, protection and maintenance of existing services, if any, which in the opinion of Engineer-in-charge are likely to be affected by piling operation incl. temporary shifting of such services to facilitate piling job shall also have to be done, if so required by the Engineer-in-charge and the cost for the same as assessed by the engineer-in-charge shall be reimbursable. (11) The cost of barricading and all traffic safety requirements as specified in the tender document. (12) The cost of all incidentals, labour, material, equipment and works required to execute the job. The item also includes any other incidental expenditures for completing the job as per the direction of the engineer-in-charge (13) The item includes the cost of testing of all the materials involved in the execution of the item as per QAP. 14) Initial vertical load testing, horizontal load testing, routine load testing required as per IS: 2911 part(iv) and as per MORTH Specifications. Minimum 2 no. of tests shall be carried out for each of Initial- Vertical load test, Initial- Lateral Load test, Routine-Vertical and Routine lateral Load test.Initial Pile load test shall be carried upto failure, as per requirements of deflection as per IRC 78:2014 (with latest amendments) Routine Load test shall be carried upto 1.5 times the pile capacity. B) Mode of Measurement : (1) Length of pile shall be measured from cut off level to the tip of the pile correct to a cm in case where the pile is terminated. The rock level shall be determined as per criteria mentioned elsewhere in the tender document for payment of boring through rock (2) Reinforcement steel shall be measured & paid separately. | 1,800 | Mtr. (Per Running Mtr.) | 11,500 ₹2,07,00,000 Lowest |
| 2.00 | Integrity testing of pile using Low Strain/Sonic Integrity test/Sonic Echo Test method in accordance with IS 14893 including surface preparation of pile top by removing soil, mud, dust and chipping lean concrete lumps etc. and use of computerised equipment and high skill trained personnel for conducting the test and submission of results, all complete as per direction of Engineer in charge. Note:- The inclusion of above item in the schedule of work shall be judiciously decided by the technical sanctioning authority, keeping in view the quality control, type of soil strata and importance of the project | 45 | Per Test | 1,000 ₹45,000 Lowest |
| 3.00 | Earth work in excavation for Pile caps (Abutment, Piers) in all type of soils, weathered rock, existing footings, removal of boulders, concrete, ballast, stone etc including protecting the excavated sides, if required, till concreting, bailing out water to keep the area clean and dry during placement of reinforcement and concrete till the concrete sets finally. The item includes the cost of disposal of all spoils, dismantled materials, surplus earth for all leads and lifts as per clause No. 304 of MoRT&H Specifications 5th revision 2013 and to keep the work area neat and tidy during the work and thereafter. Payment shall be made based on approved plan dimensions for PCC below pile cap. The cost of backfilling around the pile cap and restoration of road, if required shall be included (MORT&H 304). | 2,245.32 | Cum (Per Cubic Mtr.) | 60 ₹1,34,719.2 Lowest |
| 4.00 | Providing and laying plain cement concrete M-15 (aggregate 20 mm nominal size) in open foundation, etc with minimum cement content 240 kg per cum, using Ordinary Portland Cement of grade 43, appropriate sand, aggregate, water, admixtures in suitable proportions as per approved mix design, as per approved drawings supplied by the Engineer-in-charge, including all types of shuttering, staging, centering scaffolding, necessary tools, plants, machinery, and all related operations as required to complete the work with all leads, lifts and depths true to line, level and position all complete (excluding the cost of reinforcement steel). The rate shall include the cost of all labour, material etc complete job including bailing out water to keep the area dry as per instruction of Engineer-in-Charge.. Payment shall be made based on approved plan dimensions for PCC as per clause No. 1500, 1700 & 2100 of MoRT&H Specifications 5th revision 2013. | 333.72 | Cum (Per Cubic Mtr.) | 4,000 ₹13,34,880 Lowest |
| 5.00 | Providing and laying reinforced cement concrete in pile cap M-35 grade with minimum cement content 350 kg per cum,for construction Foundation, concrete using Ordinary Portland Cement of grade 43 appropriate sand, aggregate, water, admixtures in suitable proportions as per approved mix design, as per approved drawings supplied by the Engineer-in-charge, including all types of shuttering, centering, necessary tools, plants, machinery, and all related operations as required to complete the work with all leads, lifts and depths true to line, level and position all complete (excluding the cost of reinforcement steel, complete as per clause No. 1000, 1500,1700 & 2100 of MoRT&H Specifications 5th revision 2013.) | 1,197.99 | Cum (Per Cubic Mtr.) | 6,500 ₹77,86,935 Lowest |
| 6.00 | Steel Reinforcement: Supply, cutting, bending with all leads, lifts and depths, fixing in position reinforcement of any diameter, TMT Fe- 500 EQR/Fe 500 D grade or more for RCC work as per relevant BIS specification and drawing in RCC works in Foundations, Sub structure , Super structure and any other work in the BOQ .The rate shall include cost of all material including galvanizing / epoxy coating tying wire, binding wire, cover block, provision of stools, chairs, spacer bars, overlaps, support bars, labour, transportation, storing and all other incidental charges, tools & plants etc complete. as per clause No. 1600 &2200 of MORT&H specification 2013 / Latest edition for road and bridges works. | 803.53 | (M.T. (Per Metric Tonne) | 80,000 ₹6,42,82,400 Lowest |
| 7.00 | SUBSTRUCTURE- Piers, Abutments and Bearings
Providing and laying reinforced cement concrete M-35 grade with minimum cement content 350 kg per cum in Sub structure. Concrete using Ordinary Portland Cement of grade 43 appropriate sand, aggregate, water, admixtures in suitable proportions as per approved mix design, as per approved drawings supplied by the Engineer-in-charge, including all types of shuttering, centering, necessary tools, plants, machinery, and all related operations as required to complete the work with all leads, lifts and depths true to line, level and position all complete (excluding the cost of reinforcement steel, complete as per clause No. 1000, 1500,1700 & 2200 of MoRT&H Specifications 5th revision 2013.)
Height upto 5 met. | 110.66 | Cum (Per Cubic Mtr.) | 6,800 ₹7,52,488 Lowest |
| 8.00 | Providing and laying reinforced cement concrete M-35 grade with minimum cement content 350 kg per cum in Sub structure. Concrete using Ordinary Portland Cement of grade 43 appropriate sand, aggregate, water, admixtures in suitable proportions as per approved mix design, as per approved drawings supplied by the Engineer-in-charge, including all types of shuttering, centering, necessary tools, plants, machinery, and all related operations as required to complete the work with all leads, lifts and depths true to line, level and position all complete (excluding the cost of reinforcement steel, complete as per clause No. 1000, 1500,1700 & 2300 of MoRT&H Specifications 5th revision 2013.)
Height 5 to 10 met. | 319.53 | Cum (Per Cubic Mtr.) | 7,000 ₹22,36,710 Lowest |
| 9.00 | Providing and laying reinforced cement concrete M-40 grade with minimum cement content 360 kg per cum in pedestals, seismic stoppers etc. using Ordinary Portland Cement of grade 43, appropriate sand, aggregate, water, admixtures in suitable proportions as per approved mix design, as per approved drawings supplied by the Engineer-in-charge, including all types of shuttering, staging, centering scaffolding, necessary tools, plants, machinery, and all related operations as required to complete the work with all leads, lifts and depths true to line, level and position all complete (excluding the cost of reinforcement steel). As per MORT&H specification for road and bridges works (5th revision) / latest edition as per clause No. 1000, 1500, 1700, 2200 of MoRT&H Specifications - 2013 | 65.6 | Cum (Per Cubic Mtr.) | 7,500 ₹4,92,000 Lowest |
| 10.00 | Supplying, fitting and fixing in position true to line and level POT-PTFE bearing (Metco, Sanfield,Mageba and M/s Steel auto industries make) consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainless stell mating surface, complete assembly to be of cast steel/fabricated structural steel, metal and elastomer elements to be as per IRC:83 parts I&II respectively and other parts conforming to BS:5400, sections 9.1 & 9.2 and clause 2006 of MoRT&H specifications complete as per drawing and approved technical specification (MoRT&H no. 13.16)
a) Metallic Guided bearing @ 246.30 MT | 14,778 | (M.T. (Per Metric Tonne) | 350 ₹51,72,300 Lowest |
Tender Value
₹13.9 Cr
EMD Value
₹27.8 L
Closing Date
19 Feb 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer/Executive Engineer
PWD B and R office Bhiwani
Construction of approaches for 2 lane ROB on Rewari Bhatinda Railway line at LC -52C at Railway Km. 81/9-82/0 in Bhiwani District. (Re-Inviting)
2021_HRY_157832_1
PWD/Bhiwani/Rs.1392.31lacs/ROB LC-52C (Re-inviting
Open Tender
Civil Works - Bridges
Works
540 days
Bhiwani
Please refer tender documents
3 documents required · 3 mandatory
₹20,000
₹27.8 L
Yes
27 Apr 2021
28 Jan 2021
22 Feb 2021
28 Jan 2021
19 Feb 2021
28 Jan 2021
120 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | FOUNDATION - PILES & PILE CAPS
Bored cast-in-situ M35 grade with minimum cement content 350 kg per cum, RCC piles of 1200 mm diameter in all kinds of soil (including hard & boulders) with Hydraulic Rig excluding cost of steel reinforcement but including the cost of Shoe and the length of pile to be embedded in the pile cap etc, (Length of pile for payment shall be measured from top of shoe to the bottom of the pile cap). All complete as per drawing and conforming to section 1100 and 1700 of MORTH specifications of latest edition and clause 709 of IRC: 78-2000/latest edition including cost of bentonite slurry, initial vertical and lateral load tests, routine load tests and removal of excavated earth with all lifts and lead etc. complete in all respect. (i) 1200 dia piles (A) The scope of work in the above items include: (1) The cost of all initial layout of piles and setting out, initial excavation, if any (2 a) The cost of boring through all types of soils/existing road/ pavement, removal of all obstruction like boulders, old foundation concrete or rock to be paid in relevant item above by chiseling or any other method as approved by the Engineer-in-charge. If a bore is abandoned for any reason no payment shall be made for such incomplete boring and shifting of the equipments (2 b) The cost of filling up of the empty bore, if required (3) The cost of preparation, circulation and handling of bentonite slurry. (4) The cost of disposal of all spoil, bentonite waste to keep the work area neat. (5) The cost of providing temporary liner and its withdrawal, if required below adjoining ground level (irrespective of the R.L of the adjoining ground level) for vertical piles) (6) The cost of providing and mixing all ingredients of cement concrete (except reinforcement steel) including admixtures, with batching plant, transporation, placement of concrete by tremie pipe for the required lengths of pile including providing cover blocks, stiffeners, handling bars etc. for safe handling of reinforcement cage. (7) The cost of breaking of pile head not earlier than 3 days after concreting and to remove spoil concrete to bring the pile head to the socketing level including cleaning and arranging the extended reinforcement bars as per drawings. (8) The cost of working for all leads, lifts, pumping / bailing out of water, labour, material and equipment etc. 9) The cost of mobilizing to site, installation at different locations transferring / dismantling, shifting, reinstalling and removal from site of the piling rigs and / or other equipments and all accessories including working plateforms) (10) The cost of identification, protection and maintenance of existing services, if any, which in the opinion of Engineer-in-charge are likely to be affected by piling operation incl. temporary shifting of such services to facilitate piling job shall also have to be done, if so required by the Engineer-in-charge and the cost for the same as assessed by the engineer-in-charge shall be reimbursable. (11) The cost of barricading and all traffic safety requirements as specified in the tender document. (12) The cost of all incidentals, labour, material, equipment and works required to execute the job. The item also includes any other incidental expenditures for completing the job as per the direction of the engineer-in-charge (13) The item includes the cost of testing of all the materials involved in the execution of the item as per QAP. 14) Initial vertical load testing, horizontal load testing, routine load testing required as per IS: 2911 part(iv) and as per MORTH Specifications. Minimum 2 no. of tests shall be carried out for each of Initial- Vertical load test, Initial- Lateral Load test, Routine-Vertical and Routine lateral Load test.Initial Pile load test shall be carried upto failure, as per requirements of deflection as per IRC 78:2014 (with latest amendments) Routine Load test shall be carried upto 1.5 times the pile capacity. B) Mode of Measurement : (1) Length of pile shall be measured from cut off level to the tip of the pile correct to a cm in case where the pile is terminated. The rock level shall be determined as per criteria mentioned elsewhere in the tender document for payment of boring through rock (2) Reinforcement steel shall be measured & paid separately. | 1,800 | Mtr. (Per Running Mtr.) | - | - |
| 2 | Integrity testing of pile using Low Strain/Sonic Integrity test/Sonic Echo Test method in accordance with IS 14893 including surface preparation of pile top by removing soil, mud, dust and chipping lean concrete lumps etc. and use of computerised equipment and high skill trained personnel for conducting the test and submission of results, all complete as per direction of Engineer in charge. Note:- The inclusion of above item in the schedule of work shall be judiciously decided by the technical sanctioning authority, keeping in view the quality control, type of soil strata and importance of the project | 45 | Per Test | - | - |
| 3 | Earth work in excavation for Pile caps (Abutment, Piers) in all type of soils, weathered rock, existing footings, removal of boulders, concrete, ballast, stone etc including protecting the excavated sides, if required, till concreting, bailing out water to keep the area clean and dry during placement of reinforcement and concrete till the concrete sets finally. The item includes the cost of disposal of all spoils, dismantled materials, surplus earth for all leads and lifts as per clause No. 304 of MoRT&H Specifications 5th revision 2013 and to keep the work area neat and tidy during the work and thereafter. Payment shall be made based on approved plan dimensions for PCC below pile cap. The cost of backfilling around the pile cap and restoration of road, if required shall be included (MORT&H 304). | 2,245.32 | Cum (Per Cubic Mtr.) | - | - |
| 4 | Providing and laying plain cement concrete M-15 (aggregate 20 mm nominal size) in open foundation, etc with minimum cement content 240 kg per cum, using Ordinary Portland Cement of grade 43, appropriate sand, aggregate, water, admixtures in suitable proportions as per approved mix design, as per approved drawings supplied by the Engineer-in-charge, including all types of shuttering, staging, centering scaffolding, necessary tools, plants, machinery, and all related operations as required to complete the work with all leads, lifts and depths true to line, level and position all complete (excluding the cost of reinforcement steel). The rate shall include the cost of all labour, material etc complete job including bailing out water to keep the area dry as per instruction of Engineer-in-Charge.. Payment shall be made based on approved plan dimensions for PCC as per clause No. 1500, 1700 & 2100 of MoRT&H Specifications 5th revision 2013. | 333.72 | Cum (Per Cubic Mtr.) | - | - |
| 5 | Providing and laying reinforced cement concrete in pile cap M-35 grade with minimum cement content 350 kg per cum,for construction Foundation, concrete using Ordinary Portland Cement of grade 43 appropriate sand, aggregate, water, admixtures in suitable proportions as per approved mix design, as per approved drawings supplied by the Engineer-in-charge, including all types of shuttering, centering, necessary tools, plants, machinery, and all related operations as required to complete the work with all leads, lifts and depths true to line, level and position all complete (excluding the cost of reinforcement steel, complete as per clause No. 1000, 1500,1700 & 2100 of MoRT&H Specifications 5th revision 2013.) | 1,197.99 | Cum (Per Cubic Mtr.) | - | - |
| 6 | Steel Reinforcement: Supply, cutting, bending with all leads, lifts and depths, fixing in position reinforcement of any diameter, TMT Fe- 500 EQR/Fe 500 D grade or more for RCC work as per relevant BIS specification and drawing in RCC works in Foundations, Sub structure , Super structure and any other work in the BOQ .The rate shall include cost of all material including galvanizing / epoxy coating tying wire, binding wire, cover block, provision of stools, chairs, spacer bars, overlaps, support bars, labour, transportation, storing and all other incidental charges, tools & plants etc complete. as per clause No. 1600 &2200 of MORT&H specification 2013 / Latest edition for road and bridges works. | 803.53 | (M.T. (Per Metric Tonne) | - | - |
| 7 | SUBSTRUCTURE- Piers, Abutments and Bearings
Providing and laying reinforced cement concrete M-35 grade with minimum cement content 350 kg per cum in Sub structure. Concrete using Ordinary Portland Cement of grade 43 appropriate sand, aggregate, water, admixtures in suitable proportions as per approved mix design, as per approved drawings supplied by the Engineer-in-charge, including all types of shuttering, centering, necessary tools, plants, machinery, and all related operations as required to complete the work with all leads, lifts and depths true to line, level and position all complete (excluding the cost of reinforcement steel, complete as per clause No. 1000, 1500,1700 & 2200 of MoRT&H Specifications 5th revision 2013.)
Height upto 5 met. | 110.66 | Cum (Per Cubic Mtr.) | - | - |
| 8 | Providing and laying reinforced cement concrete M-35 grade with minimum cement content 350 kg per cum in Sub structure. Concrete using Ordinary Portland Cement of grade 43 appropriate sand, aggregate, water, admixtures in suitable proportions as per approved mix design, as per approved drawings supplied by the Engineer-in-charge, including all types of shuttering, centering, necessary tools, plants, machinery, and all related operations as required to complete the work with all leads, lifts and depths true to line, level and position all complete (excluding the cost of reinforcement steel, complete as per clause No. 1000, 1500,1700 & 2300 of MoRT&H Specifications 5th revision 2013.)
Height 5 to 10 met. | 319.53 | Cum (Per Cubic Mtr.) | - | - |
| 9 | Providing and laying reinforced cement concrete M-40 grade with minimum cement content 360 kg per cum in pedestals, seismic stoppers etc. using Ordinary Portland Cement of grade 43, appropriate sand, aggregate, water, admixtures in suitable proportions as per approved mix design, as per approved drawings supplied by the Engineer-in-charge, including all types of shuttering, staging, centering scaffolding, necessary tools, plants, machinery, and all related operations as required to complete the work with all leads, lifts and depths true to line, level and position all complete (excluding the cost of reinforcement steel). As per MORT&H specification for road and bridges works (5th revision) / latest edition as per clause No. 1000, 1500, 1700, 2200 of MoRT&H Specifications - 2013 | 65.6 | Cum (Per Cubic Mtr.) | - | - |
| 10 | Supplying, fitting and fixing in position true to line and level POT-PTFE bearing (Metco, Sanfield,Mageba and M/s Steel auto industries make) consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainless stell mating surface, complete assembly to be of cast steel/fabricated structural steel, metal and elastomer elements to be as per IRC:83 parts I&II respectively and other parts conforming to BS:5400, sections 9.1 & 9.2 and clause 2006 of MoRT&H specifications complete as per drawing and approved technical specification (MoRT&H no. 13.16)
a) Metallic Guided bearing @ 246.30 MT | 14,778 | (M.T. (Per Metric Tonne) | - | - |
stage.html
html • 0.04 MB
technical_211055.pdf
PDF • 0.44 MB
techsummary_211055.pdf
PDF • 0.44 MB
BOQ Comparative Chart
xlsx • 0.02 MB
finsummary_211055.pdf
PDF • 0.44 MB
1392.31.PDF
PDF • 2.72 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
DNIT_Rs.1392.31lacs.pdf
Tender Notice • 0.72 MB
BOQ_211055.xls
BOQ Document • 0.46 MB
72387087.pdf
Tender Document • 0.72 MB
72387089.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .