Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.0 LAccepted-AOC 4 DALURBANDH PANDAVESWAR PANDAVESWAR BARDHAMAN WEST BENGAL 713346 UDYAM WB 03 0006114 | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | 1 | Accepted-AOC Eligible L-1 bidder | |
| 2 | 2₹4.0 L+₹436.22 (0.11%)Rejected-Finance VILL PO CHINCHURIA BARDHAMAN 713378 WEST BENGAL | CHINCHURIA | BURDWAN | WEST BENGAL | 713378 | 2 | Rejected-Finance Quoted more than L-1 bidder | |
| 3 | 3₹4.0 L+₹1,480.33 (0.37%)Rejected-Finance 0 SHANKERPURI COLONY SAHARANPUR BEHAT ROAD NEAR DEHAT KOTWALI SAHARANPUR UTTAR PRADESH 247001 | SAHARANPUR | UTTAR PRADESH | 247001 | 3 | Rejected-Finance Quoted more than L-1 bidder |
Tender Value
₹3.7 L
EMD Value
₹4,600
Closing Date
11 Feb 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AE EnM
ECL Sonepur Bazari Area
Diversion/Erection/Dismantling of F-14 for CMAT extension under Sonepur Bazari Project.
2023_ECL_269265_1
GM/SBA/EnM/e-tender/2022-23/ 705
Open Tender
Electrical and Maintenance Works
Item Rate
15 days
ECL Sonepur Bazari Area
please refer tender documents
6 documents required · 6 mandatory
₹4,600
24 Mar 2023
31 Jan 2023
13 Feb 2023
1 Feb 2023
11 Feb 2023
1 Feb 2023
1 Feb 2023 - 4 Feb 2023
Amount
Item Description/ Heading
Material Cost
Material cost for erection 13/16 mtrs long steel tubular pole with cement concrete
Material cost for fabrication, hoisting, erection of phase and earth bracket and painting with red oxide primer
Meterial cost for supply and erection of nuts,bolts,flats and erection of clamps
Material cost for supply, fixing and erection of HT stay set complete with stay plate, stay insulator, and stay wire for required dimensions and specification
Material cost for Supply and fixing of 7/14 SWG GI wire for earth continiuity and 6/8 SWG for making and erection of cradle guard
Material cost for erection of earth pit with supply of all required materials
Labour Cost:-
Labour cost for erection 13/16 mtrs long steel tubular pole with cement concrete
Labour cost for fabrication, hoisting, erection of phase and earth bracket and painting with red oxide primer
Labour cost for erection of nuts &bolts,flats for febrication, hoisting and erection of clamps
Labour cost for installation of 11kV disc insulator and hardware
Labour cost for installation of 11 kv pin insulator and hardware.
Labour cost for erection of HT stay set complete with stay plate, stay insulator, and stay wire for required dimensions and specification
Labour cost for fixing of 7/14 SWG GI wire for earth continiuity and 6/8 SWG for making and erection of cradle guard
Labour cost for stringing of ACSR DOG/WOLF conductor
Labour cost for erection of earth pit with supply of all required materials
Labour cost for dismantling of 16 mtrs long steel tublar pole
Labour cost for dismantling of channels, angles for phase & earth bracket & cradle guard.
Labour cost for dismentling of 11 KV disc/pin insulator and headware material
Labour cost for dismentling of ACSR dog/WOLF conductor
P. F. amount for labour cost
Total impact of GST for the purpose of CTC
JAY MAA DAL DALI KALI
ELECTRO TRADING CO.
stage.html
html • 0.04 MB
techsummary_278562.pdf
PDF • 1.09 MB
finsummary_278562.pdf
PDF • 1.09 MB
wo705.pdf
PDF • 2.47 MB
finance_278562.pdf
PDF • 0.25 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .