| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 LAccepted-AOC | ₹6.6 L | L1 | Accepted-AOC work order issued |
| 2 | L2₹6.6 L+₹3,138 (0.48%)Rejected-Finance | ₹6.6 L+₹3,138 (0.48%) | L2 | Rejected-Finance rejected |
| 3 | L3₹6.7 L+₹10,038 (1.52%)Rejected-Finance | ₹6.7 L+₹10,038 (1.52%) | L3 | Rejected-Finance rejected |
| 4 | L4₹6.8 L+₹16,673 (2.53%)Rejected-Finance | ₹6.8 L+₹16,673 (2.53%) | L4 | Rejected-Finance rejected |
| Sl No | Description | Qty | Unit | SRI THIRUMURUGA CONSTRUCTION L1 | SK Global L2 | M/S. THAMIZH CONSTRUCTIONS L4 | D UDAYAKUMAR L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earthwork excavation for foundation in all soils and sub soils in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and to full depth as may be directed,except in hard rock,requiring blasting including shoring and shuttering and bailing out of water wherever necessary,refilling the sides of foundation with excavated earth or sand in layer of not more than 15cm thick.well rammed and consolidated and depositing on bank with initial lead and lift of 10m & initial lift of 2m and depositing the surplusr earth within the compound in places shown by the departmental officers with iniital lead and lifts,clearing and levelling the site etc., complete as per SS20B and as directed by departmental Engineers(TNBP No.20B). | 69 | M3 | 275 ₹18,975 | 276 ₹19,044 | 224 ₹15,456 Lowest | 277.66 ₹19,158.54 |
| 2.00 | Plain Cement Concrete 1:4:8 mix (One Part Cement, Four Part Fine Aggregate and Eight Part Coarse Aggregate) Using 40mm ISS HBG metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28). | 4 | M3 | 6,060 ₹24,240 | 6,129 ₹24,516 | 5,748 ₹22,992 Lowest | 6,161.77 ₹24,647.08 |
| 3.00 | Supplying and erecting centering for sides and soffits including supports and strutting uptp 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90cmx60cm and 10 gauge stiffened, welded with mild steel angles of size 25mmx25x3mm for boarding laid over silver oak (country wood) joist of size 10cmx6.5cm dia spaced about 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre tocentre etc.complete complying with standard specification and as directed by the departmental engineers. TNBP No.30 | 191 | m2 | 730 ₹1,39,430 | 733 ₹1,40,003 | 690 ₹1,31,790 Lowest | 737.3 ₹1,40,824.3 |
| 4.00 | Reinforced Cement concrete 1:1 1/2:3 (One Part cement, one and half Part M-sand and Three Part aggregate) using machine crushed 20mm gauge hard broken stone jelly for all RCC items of work excluding centering strutting, and reinforcement grills placed in position but including mixing concrete, laying and vibrations charges, curing, etc complete and including providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary etc. complete complying with standard specification( TNBP No:30) | 26 | M3 | 8,900 ₹2,31,400 | 9,004 ₹2,34,104 | 7,914 ₹2,05,764 Lowest | 9,052.34 ₹2,35,360.84 |
| 5.00 | Supplying, fabricating and placing in position mild steel or ribbed tor steel for all reinforced cement concrete works as per design given including cost of steel and binding wire with all conveyance and lead charges in all floors etc.complete complying with standard specifications and as directed by the deparmental engineers. TNBP No:30 | 2,080 | Kgs | 95.3 ₹1,98,224 | 95 ₹1,97,600 | 93 ₹1,93,440 Lowest | 97.05 ₹2,01,864 |
| 6.00 | pvc 110m m 6kg pipe | 70 | mtr | 675 ₹47,250 Lowest | 677 ₹47,390 | 1,525 ₹1,06,750 | 681.4 ₹47,698 |
Tender Value
₹8.4 L
EMD Value
₹8,400
Closing Date
12 Aug 2026, 3:00 pmClosed
executive officer naravarikuppam town panchayat
executive officer naravarikuppam town panchayat
Construction of septic tank at bus stand toilet in Naravarikuppam TP
2026_DTP_692399_1
161/2026/A1
Open Tender
Civil Works
Works
180 days
Construction of septic tank at bus stand toilet in
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹8,400
12 Sept 2026
7 Aug 2026
12 Aug 2026
7 Aug 2026
12 Aug 2026
7 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavation for foundation in all soils and sub soils in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders and to full depth as may be directed,except in hard rock,requiring blasting including shoring and shuttering and bailing out of water wherever necessary,refilling the sides of foundation with excavated earth or sand in layer of not more than 15cm thick.well rammed and consolidated and depositing on bank with initial lead and lift of 10m & initial lift of 2m and depositing the surplusr earth within the compound in places shown by the departmental officers with iniital lead and lifts,clearing and levelling the site etc., complete as per SS20B and as directed by departmental Engineers(TNBP No.20B). | 69 | M3 | 1 | ₹69 |
| 2 | Plain Cement Concrete 1:4:8 mix (One Part Cement, Four Part Fine Aggregate and Eight Part Coarse Aggregate) Using 40mm ISS HBG metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28). | 4 | M3 | 2 | ₹8 |
| 3 | Supplying and erecting centering for sides and soffits including supports and strutting uptp 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90cmx60cm and 10 gauge stiffened, welded with mild steel angles of size 25mmx25x3mm for boarding laid over silver oak (country wood) joist of size 10cmx6.5cm dia spaced about 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre tocentre etc.complete complying with standard specification and as directed by the departmental engineers. TNBP No.30 | 191 | m2 | 3 | ₹573 |
| 4 | Reinforced Cement concrete 1:1 1/2:3 (One Part cement, one and half Part M-sand and Three Part aggregate) using machine crushed 20mm gauge hard broken stone jelly for all RCC items of work excluding centering strutting, and reinforcement grills placed in position but including mixing concrete, laying and vibrations charges, curing, etc complete and including providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary etc. complete complying with standard specification( TNBP No:30) | 26 | M3 | 5 | ₹130 |
| 5 | Supplying, fabricating and placing in position mild steel or ribbed tor steel for all reinforced cement concrete works as per design given including cost of steel and binding wire with all conveyance and lead charges in all floors etc.complete complying with standard specifications and as directed by the deparmental engineers. TNBP No:30 | 2,080 | Kgs | 6 | ₹12,480 |
| 6 | pvc 110m m 6kg pipe | 70 | mtr | 7 | ₹490 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_832511.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
BOQ_832511.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .