Loading…
Loading…
Tender Value
₹1.4 Cr
EMD Value
₹2.9 L
Closing Date
10 Aug 2026, 12:00 pm
OHE modification work in connection with "Provision of one shunting neck and two stabling lines at Lalitgram (LLP)".
EL-TRD-ET-04-2026-27
EL-TRD-ET-04-2026-27
Open
Works - General
12 Months
Unknown (Unspecified Location)
₹0
₹2.9 L
15 Jul 2026
15 Jul 2026
27 Jul 2026
Preparation of drawing & design for OHE.
Preparation of SWR diagram board along with caption diagram.
Supply for construction of retaining/baffel wall with reinforcement cement concrete (Grade M-20)
Erection for construction of retaining/baffel wall with reinforcement cement concrete (Grade M-20)
Earth work in excavation and filling including compaction (i) in normal soil erection.
Supply of reinforcement for RCC including cutting, straightening, bending, erection and placing and in position including all lead and lift and including cost of binding wire materials.
Foundation (1:3:6) with core filling.
Supply of galvanised fabricated steel structure for Traction Mast/Portal/ TTC/ Dwarf Mast.
Erection of galvanised fabricated steel structure for Traction Mast/Portal/ TTC/ Dwarf Mast.
Supply of fabricated steel work other than OHE Mast.
Erection of fabricated steel work other than OHE Mast.
Supply of cantilever assembly for OHE without insulator.
Erection of cantilever assembly for OHE without insulator.
Supply of Stay insulator.
Erection of Stay insulator.
Supply of Bracket insulator.
Erection of Bracket insulator.
Supply of 9 tone insulator.
Erection of 9 tone insulator.
Erection of 107 sqmm HDGC Copper Contact wire as per RDSO Spec No. ETI/OHE/76 (6/97) with A&C Slip No. 1, 3 & 4.
Erection of 65 sqmm (19/2.10 mm) Cadmium copper Catenary wire as per RDSO Spec No. ETI/OHE/50(6/97).
Supply of span dropper wire.
Erection of span dropper wire.
Supply of copper jumper and feeder jumper 160sqmm. (5 mtr length each).
Erection of copper jumper and feeder jumper 160sqmm (5 mtr length each).
Supply of small copper jumper (50sqmm).
Erection of small copper jumper (50sqmm).
Supply of Modified 3-Pulley with counter weight assembly complete in all respect.
Erection of Modified 3-Pulley with counter weight assembly complete in all respect.
Supply of Guy rod assembly with all accessories.
Erection of Guy rod assembly with all accessories.
Supply of 25 kV Single pole (1600 Amp) isolator but without earth contact.
Erection of 25 kV Single pole (1600 Amp) isolator but without earth contact.
Supply of 25 kV double pole (1600 Amp) isolator but without earth contact.
Erection of 25 kV double pole (1600 Amp) isolator but without earth contact.
Extra for supply of earth contact assembly for isolator.
Extra for erection of earth contact assembly for isolator.
Supply of 25kV Post/Pedestal insulator.
Erection of 25kV Post/Pedestal insulator.
Supply of double termination assembly.
Erection of double termination assembly
Supply of Fixed termination arrangement.
Erection of Fixed termination arrangement.
Erection of anticreep with cadmium copper catenary wire (65 sq.mm) suitable for OHE regulated.
Supply of Contact wire dropper clip.
Supply of Contact swivel clip with pin.
Supply of Catenary ending clamp.
Erection of Catenary ending clamp.
Supply of Contact ending clamp.
Erection of Contact ending clamp.
Supply of Catenary wire splice.
Erection of Catenary wire splice.
Supply of Contact wire splice.
Erection of Contact wire splice.
Supply & Erection of PG clamp (1030-3).
Supply & Erection of PG clamp (1040).
Supply & Erection of PG clamp 1050-3.
Supply of G.I nut bolts (16 x 360x 57mm)
Supply of G.I nut bolts (16 x 260x 57mm)
Supply of G.I nut bolts (20 x 550x 57mm)
Supply of S.S nut bolts (10 x 35x 30mm)
Supply of S.S nut bolts (12 x 35x 30mm)
Supply of S.S nut bolts (16 x 50x 38mm)
Supply of S.S nut bolts (12 x 55x 30mm)
Supply of G.I nut bolts (16 x 50x 38mm)
Supply of section insulator assembly complete in all respect.
Erection of section insulator assembly complete in all respect.
Supply of bimetallic parallel clamp (10/20).
Erection of bimetallic parallel clamp (10/20).
Supply of feeder suspension clamp.
Erection of feeder suspension clamp.
Supply of feeder ending clamp.
Erection of feeder ending clamp.
Supply of feeder suspension clevis.
Erection of feeder suspension clevis.
Supply of earth electrode with earthing station.
Erection of earth electrode with earthing station.
Supply of Structure Bonds (4.75 mtr) including all fittings
Erection of Structure Bonds (4.75 mtr) including all fittings.
Supply of longitudinal/Rail bond.
Erection of longitudinal/Rail bond.
Supply of Z- bond/ Transverse bond.
Erection of Z- bond/ Transverse bond.
Supply of caution board/engine stop board/sigma board/DJ ON/OFF board.
Erection of Caution board.
Supply of Retro reflective type structure Number Plate conforming to RDSO specification.
Erection of Retro reflective type structure Number Plate conforming to RDSO specification.
Drilling of hole for bond.
Dismantling charges for OHE shifting/slewing & cutting/removal of old Mast under power block.
Dismantling & removal of cantilever assembly.
Dismantling & removal of OHE.
Dismantling of ATD (Regulating equipment) with counterweight.
Dismantling of Guy rod with termination.
Transportation charges of railway supply materials from railway depots to work site or transportation of released material from work site to Railway Depot at SRGR.
Transfer of OHE equipment from one mast or support to another.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Tenderpaper_1.pdf
ATTACHMENT
ExpNote_1.pdf
ATTACHMENT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27_04_221.pdf
ATTACHMENT
Correctionslip01to11ofGCC2022.pdf
ATTACHMENT
Similarworkdefinition27_10_2021.pdf
ATTACHMENT
annualturnoverformatCAVIB.pdf
ATTACHMENT
MandateForm.pdf
ATTACHMENT
ANX-VVA.pdf
ATTACHMENT
Declaration
ATTACHMENT
PDFundertaking.pdf
ATTACHMENT
DECLARATIONREGARDINGASSOCIATIONWITHGAZETTEDRAILWAYOFFICERENGINEER-1.pdf
ATTACHMENT
Download all tender documents and submit your bid