Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹59,881
Closing Date
25 Sept 2026, 12:00 pm2d left
EO NPP SULTANPUR
EO NPP SULTANPUR
1-Ward Civil Line Mein Leelavati pal ke Makan se Gandhi Park Ke Samne Tak Nala Nirman Karya
2026_DOLBU_1187722_1
578/N.P.P.SUL/2026-27 DT. 05-09-2026
Open Tender
Civil Works
Percentage
90 days
NPP SULTANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,422
EO NPP SULTANPUR
₹59,881
19 Sept 2026
19 Sept 2026
25 Sept 2026
19 Sept 2026
25 Sept 2026
19 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of brick work work or stone work in Ime or cement and including stacking of material as rected by the Engineetan-chargo with in a distance ot 60 metres(200f1) As per SOR Chap-15,item 692.00 | 99.16 | Cum | 442 | ₹43,828.72 |
| 2 | E/W excavation in foundation in ordinary soil Ete complete as per sor 2.1 | 268 | Cum | 125 | ₹33,500 |
| 3 | Disposal of soil upto 5 km distance same as per dismantling brick work quanaty same as per olw excavation quantity | 367.16 | Cum | 183.5 | ₹67,373.86 |
| 4 | Eartnwork filing | 187.94 | Cum | 266.4 | ₹50,067.22 |
| 5 | Supply of RCC hume pipe NP-3 including Collars/spigot jointed with stiff mixture of cement in the proportion of 1:2 (1 Cement 2 Sand) including testing of jonts 1000 MM SOR ch-1 item no.30[v) | 10 | Cum | 6,336.5 | ₹63,365 |
| 6 | Supply and filing of local river sand @.034cum'bag SOR CH-15 Item no.16 | 44.22 | Cum | 650 | ₹28,743 |
| 7 | Providing and laying cement concrete 1:5 10(1 cement 5 cource sand:10 graded stone aggregate 10mm nominal Size as per sor 4.1.10 | 33.17 | Cum | 5,735 | ₹1,90,229.95 |
| 8 | Prowding and layingcement concrete 1153 1 cement: 1.6 cource sand 3 graded stone | 142.52 | Cum | 8,120 | ₹11,57,262.4 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo- Mechanically Treated bars of grade Fe-500D or more. DSR 5.22.6 Actul Rate(107.85X.735Xcost index 106XBase cost index 107) | 134.25 | Qtl | 7,853 | ₹10,54,265.25 |
| 10 | Centering and shuttering for R.C.C Work complete as per sor 5.9.3 | 852.71 | Sqm | 330 | ₹2,81,394.3 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_2236660.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .