Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance AT P O BAHALDA DIST MAYURBHANJ | BAHALDA | MAYURBHANJ | ODISHA | L1 | Admitted-Finance | ||
| 2 | L1₹1.2 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 3 | L1₹1.2 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 4 | L1₹1.2 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 5 | L1₹1.2 CrAdmitted-Finance C CLASS CONTRACTOR | L1 | Admitted-Finance |
Tender Value
₹1.3 Cr
EMD Value
₹1.3 L
Closing Date
29 Jul 2026, 5:00 pmClosed
Circle Officer
RURAL WORKS CIRCLE, BARIPADA
Construction of Upgraded Higher Secondary Schools Arts stream at Govt High School Jharadihi building for the year 23-24 vide Lt No 3047 lt. 13.03.23 State Project Director Bhubaneswar
2026_CERWI_135931_1
NCB 421
National Competitive Bid
Civil Works - Buildings
Percentage
365 days
SERW Division, Rairangpur
4 documents required · 4 mandatory
₹10,000
₹1.3 L
Yes
21 Oct 2026
15 Jul 2026
30 Jul 2026
15 Jul 2026
29 Jul 2026
15 Jul 2026
15 Jul 2026 - 28 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in hard soil including dressing levelling the bed etc. complete. | 335.89 | cum | 282.9 | ₹95,023.28 |
| 2 | Earthwork in stoney earth and gravel mixed wiyh stone boulders not exceeding .014cum in volume with initial lead and lift including rough dressing and breaking clods upto 5cm to 7cm size and laying in layers each layer not exceeding 0.3m in depth etc. com | 124.06 | cum | 422.48 | ₹52,412.87 |
| 3 | Filling foundation and plinth with sand well watered and rammed with cost carriage royalty etc. etc. | 338.85 | cum | 854.7 | ₹2,89,615.1 |
| 4 | P.C.C.(1:3:6) in foundation and plinth with 4cm. size h.g.c.b. metal including cost carriage etc complete.including watering curing with cost carriage labour royality etc complete. | 124.91 | cum | 6,557.7 | ₹8,19,122.31 |
| 5 | C.C. (1:2:4) with 12 mm size h.g. c.b. chips with cost carriage royalty of all materials etc.complete. | 6.93 | cum | 8,247.2 | ₹57,153.1 |
| 6 | Providing R.C.C. (M-20) with 20 mm down graded size H.G.C.B. chips including watering curing with cost carriage royality and labour etc complete.
R.C.C. Base & Foundation :- | 90.14 | cum | 6,777 | ₹6,10,878.78 |
| 7 | R.C.C. Plinth Beam :- | 22.71 | cum | 7,664.3 | ₹1,74,056.25 |
| 8 | R.C.C. Column :- Ground Floor | 25.69 | cum | 16,171.1 | ₹4,15,435.56 |
| 9 | First Floor | 1.23 | cum | 16,586.2 | ₹20,401.03 |
| 10 | R.C. C. Lintel :- GF | 13.71 | cum | 14,552.7 | ₹1,99,517.52 |
stage.html
html • 0.10 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 2.46 MB
Tendernotice_1.pdf
PDF • 1.32 MB
BOQ_601688.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .