| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 LAccepted-AOC AT WASHERY ROAD KATHARA BOKARO JHARKHAND 829116 | KATHARA | BOKARO | JHARKHAND | 829116 | L1 | Accepted-AOC Accepted as L1 as per NIT | |
| 2 | Rejected-Technical AT KHUDGADDA NEW BASTI SAWANG BOKARO JHARKHAND 829128 | BOKARO | BOKARO | JHARKHAND | 829128 | - | Rejected-Technical Rejected as per NIT | |
| 3 | Rejected-Technical AT KATHARA P O KATHARA BOKARO JHARKHAND 829116 | BOKARO | BOKARO | JHARKHAND | 829116 | - | Rejected-Technical Rejected as per NIT |
| Sl No | Description | Qty | Unit | M/S SHYAM ELECTRICALS L1 |
|---|---|---|---|---|
| 1.00 | A. Complete rewinding and repairing of 160KVA distribution transformer 11KV/440Volt, s.I no. 149/1 at Kathara Basti under kathara Colliery.(put zero against this row in rate column) | 1 | Job | - |
| 1.01 | DPC copper wire & strip for primary coil and secondary coil | 52 | Kg | 1,200 ₹62,400 Lowest |
| 1.02 | Cost of insulating maeterials | 1 | LS | 19,870 ₹19,870 Lowest |
| 1.03 | Cost of labour charges | 1 | LS | 19,870 ₹19,870 Lowest |
| 1.04 | Replacement of L.T bushing with stud | 4 | No | 7,500 ₹30,000 Lowest |
| 1.05 | Replacement of H.T bushing with stud | 3 | No | 6,500 ₹19,500 Lowest |
| 1.06 | Supply and fixing of copper patti for LT connection (6mmx2''x10'') | 4 | No | 2,150 ₹8,600 Lowest |
| 1.07 | Supply and fixing of copper lugs of size 120mm | 7 | No | 400 ₹2,800 Lowest |
| 1.08 | Supplying and fixing of cork sheet of size 6mm | 2 | No | 2,950 ₹5,900 Lowest |
| 2.00 | B.Part repairing of 300KVA distribution tranformer, 3.3KVA/440Volt, Sl.No. WNP at Jhirkery Muslim Tola (put zero against this row in rate column) | 1 | Job | - |
Tender Value
₹4.4 L
EMD Value
₹5,500
Closing Date
1 Sept 2025, 4:00 pmClosed
Colliery Manager (M), Manager(F), P.E(EnM)
Colliery Manager (M),Manager(F),Project Engineer(EnM)
(A) Complete rewinding and repairing of 160KVA distribution transformer 11KV/440Volt, s.I no. 149/1 at Kathara Basti under kathara Colliery. (B)Part repairing of 300KVA distribution transformer, 3.3KVA/440Volt, Sl.No. WNP at Jhirkery Muslim Tola (C)
2025_CCL_341880_1
KTC/PE/EnM/25-26/31 date - 20.08.2025
Open Tender
Electrical and Maintenance Works
Item Rate
20 days
Office of the Project Officer, PE (EnM), Kathara C
(A) Complete rewinding and repairing of 160KVA distribution transformer 11KV/440Volt, s.I no. 149/1 at Kathara Basti under kathara Colliery. (B)Part repairing of 300KVA distribution transformer, 3.3KVA/440Volt, Sl.No. WNP at Jhirkery Muslim Tola (C)
5 documents required · 5 mandatory
₹5,500
Yes
10 Oct 2025
20 Aug 2025
2 Sept 2025
21 Aug 2025
1 Sept 2025
21 Aug 2025
21 Aug 2025 - 28 Aug 2025
Amount
A. Complete rewinding and repairing of 160KVA distribution transformer 11KV/440Volt, s.I no. 149/1 at Kathara Basti under kathara Colliery.(put zero against this row in rate column)
DPC copper wire & strip for primary coil and secondary coil
Cost of insulating maeterials
Cost of labour charges
Replacement of L.T bushing with stud
Replacement of H.T bushing with stud
Supply and fixing of copper patti for LT connection (6mmx2''x10'')
Supply and fixing of copper lugs of size 120mm
Supplying and fixing of cork sheet of size 6mm
B.Part repairing of 300KVA distribution tranformer, 3.3KVA/440Volt, Sl.No. WNP at Jhirkery Muslim Tola (put zero against this row in rate column)
H.T bushing studs complete set
L.T bushing studs complete set
Cork sheet for top cover and bushing fitting
Copper patti for connection L.T side
C. Part repairing of 250KVA tranformer, 3.3KVA/440Volt, Sl.No. WNP at Jhirkery Muslim Tola (put zero against this row in rate column)
H.T bushing studs complete set
L.T bushing studs complete set
cork sheet for top cover and bushing fitting
Copper patti for lead connection
D. Part repairing of 250KVA lighting tranformer, 3.3KVA/440Volt, Sl.No. WNP at Jhirkery Harijan Tola under Kathara Colliiery. (put zero against this row in rate column)
H.T bushing studs complete set
L.T bushing studs complete set
Cork sheet for top cover and bushing fitting
Copper patti for lead connection
Total impact of GST for the purpose of CTC
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .