| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.2 Cr+₹11.0 L (10.2%)Rejected-Finance | ₹1.2 Cr+₹11.0 L (10.2%) | L2 | Rejected-Finance L2 |
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
28 Nov 2019, 3:00 pmClosed
Project Director DRDA Thoothukudi
O/O Project Director DRDA Thoothukudi
Improvements to 5 Nos of road in Pudur Panchayat Union of Thoothukudi District under SFC (B.Pt) 2019-20 - Package No TN/TUT-13-SFC (B.Pt) (2019-20)
2019_RDTN_148211_1
PD DRDA Tut Lr No. A4/7427/2019 dt 11.11.19
Open Tender
Civil Works - Roads
Item Rate
180 days
Thoothukudi District
As per Tender Documents
4 documents required · 4 mandatory
₹0
₹1.1 L
O/O Project Director DRDA Thoothukudi
7 Jan 2021
21 Nov 2019
28 Nov 2019
21 Nov 2019
28 Nov 2019
22 Nov 2019
22 Nov 2019
Amount
Strenthening of Vedapatti to Chokkalingapuram road at km 0/0-1/2 @ Vedapatti Panchayat in Pudur Block under SFC (BP)- 2019-20 Package No.13
Clearing and scrubbling by cutting, removing and disposing of all materials such as bushes, scrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness rubbish including cutting of trees up to 300 mm girth. Km 0/0-1/2
Earth Work Excavataion and depositing on back with an initial of 10m and lift 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS 20A Km 0/0-1/2
Picking the existing B.T.Surface including all labour charges etc. complete Km 0/0-1/2
Providing and Laying Red Gravel for soling & for side berms to 75mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying water bound macadam Grading III using 63-11.2 mm HBG metal & 0.24, cum of gravel consisting of clean, crushed aggregates mechanically interlocked by rolling and bonding together with screening binding material and finished in accordance with the requirements of the specifications and thickness as per approved plans or as directed by Engineer in
Providing and laying tack coat over the primed WBM surface using 4.0 Kg of bituminous emulsion RS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 24.40 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete Paver Finisher
Providing Km stone of size 1.65 x 0.45 x 0.15m
Providing HM stones of size 0.75 x 0.23 x 0.10m
Strenthening of M.Duraisamypuram to Therkkunatham road at km 0/0-1/5 @ Mathalapuram Panchayat in Pudur Block under SFC (BP)- 2019-20 Package No.13
Clearing and scrubbling by cutting, removing and disposing of all materials such as bushes, scrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness rubbish including cutting of trees up to 300 mm girth. Km 0/0-1/5
Earth Work Excavataion and depositing on back with an initial of 10m and lift 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS 20A Km 0/0-1/5
Picking the existing B.T.Surface including all labour charges etc. complete Km 0/0-1/5
Providing and Laying Red Gravel for soling & for side berms to 75mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying water bound macadam Grading II using 75-22.4 mm HBG metal & 0.24, cum of gravel consisting of clean, crushed aggregates mechanically interlocked by rolling and bonding together with screening binding material and finished in accordance with the requirements of the specifications and thickness as per approved plans or as directed by Engineer in
Providing and laying water bound macadam Grading III using 63-11.2 mm HBG metal & 0.24, cum of gravel consisting of clean, crushed aggregates mechanically interlocked by rolling and bonding together with screening binding material and finished in accordance with the requirements of the specifications and thickness as per approved plans or as directed by Engineer in
Providing and laying tack coat over the primed WBM surface using 4.0 Kg of bituminous emulsion RS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 24.40 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete Paver Finisher
Providing Km stone of size 1.65 x 0.45 x 0.15m
Providing HM stones of size 0.75 x 0.23 x 0.10m
Strenthening of Kodangipatti road at km 0/0-0/5 @ Vembur Panchayat in Pudur Block under SFC (BP)- 2019-20 Package No.13
Clearing and scrubbling by cutting, removing and disposing of all materials such as bushes, scrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness rubbish including cutting of trees up to 300 mm girth. Km 0/0-0/5
Earth Work Excavataion and depositing on back with an initial of 10m and lift 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS 20A Km 0/0-0/5
Picking the existing B.T.Surface including all labour charges etc. complete Km 0/0-0/5
Providing and Laying Red Gravel for soling & for side berms to 75mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying water bound macadam Grading II using 75-22.4 mm HBG metal & 0.24, cum of gravel consisting of clean, crushed aggregates mechanically interlocked by rolling and bonding together with screening binding material and finished in accordance with the requirements of the specifications and thickness as per approved plans or as directed by Engineer in
Providing and laying water bound macadam Grading III using 63-11.2 mm HBG metal & 0.24, cum of gravel consisting of clean, crushed aggregates mechanically interlocked by rolling and bonding together with screening binding material and finished in accordance with the requirements of the specifications and thickness as per approved plans or as directed by Engineer in
Providing and laying tack coat over the primed WBM surface using 4.0 Kg of bituminous emulsion RS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 24.40 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete Paver Finisher
Providing HM stones of size 0.75 x 0.23 x 0.10m
Upgradation of Kovilkumareddaiayapuram Burial Ground road at km 0/0-0/380 @ K.Duraisamypuram Panchayat in Pudur Block under SFC (BP)- 2019-20 Package No.13
Clearing and scrubbling by cutting, removing and disposing of all materials such as bushes, scrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness rubbish including cutting of trees up to 300 mm girth. Km 0/0-0/380
Earth Work Excavataion and depositing on back with an initial of 10m and lift 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS 20A Km 0/0-0/380
Providing and Laying Red Gravel for soling & for side berms to 75mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying water bound macadam Grading II using 75-22.4 mm HBG metal & 0.24, cum of gravel consisting of clean, crushed aggregates mechanically interlocked by rolling and bonding together with screening binding material and finished in accordance with the requirements of the specifications and thickness as per approved plans or as directed by Engineer in
Providing and laying water bound macadam Grading III using 63-11.2 mm HBG metal & 0.24, cum of gravel consisting of clean, crushed aggregates mechanically interlocked by rolling and bonding together with screening binding material and finished in accordance with the requirements of the specifications and thickness as per approved plans or as directed by Engineer in
Providing and laying tack coat over the primed WBM surface using 4.0 Kg of bituminous emulsion RS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 24.40 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete Paver Finisher
Providing HM stones of size 0.75 x 0.23 x 0.10m
Strenthening of Inamarunachalapuram Burial Ground road at km 0/0-1/4 @ Inamarunachalapuram Panchayat in Pudur Block under SFC (BP)- 2019-20 Package No.13
Clearing and scrubbling by cutting, removing and disposing of all materials such as bushes, scrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness rubbish including cutting of trees up to 300 mm girth. Km 0/0-1/4
Earth Work Excavataion and depositing on back with an initial of 10m and lift 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS 20A Km 0/0-1/4
Picking the existing B.T.Surface including all labour charges etc. complete Km 0/0-1/4
Providing and Laying Red Gravel for soling & for side berms to 75mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying water bound macadam Grading II using 75-22.4 mm HBG metal & 0.24, cum of gravel consisting of clean, crushed aggregates mechanically interlocked by rolling and bonding together with screening binding material and finished in accordance with the requirements of the specifications and thickness as per approved plans or as directed by Engineer in
Providing and laying water bound macadam Grading III using 63-11.2 mm HBG metal & 0.24, cum of gravel consisting of clean, crushed aggregates mechanically interlocked by rolling and bonding together with screening binding material and finished in accordance with the requirements of the specifications and thickness as per approved plans or as directed by Engineer in
Providing and laying tack coat over the primed WBM surface using 4.0 Kg of bituminous emulsion RS1 for 10 sqm. Including cost of bituminous emulsion which will be supplied by departmental section store and the cost will be recovered from the contractor at the rate noted in the special conditions and including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 24.40 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete Paver Finisher
Providing Km stone of size 1.65 x 0.45 x 0.15m
Providing HM stones of size 0.75 x 0.23 x 0.10m
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Vijayakumar
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .