Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC 0 MANPUR CHITBARAGAON CHITBARAGAON BALLIA UTTAR PRADESH 221713 | BALLIA | UTTAR PRADESH | 221713 | ₹1.7 Cr | L1 | Accepted-AOC Lowest |
| 2 | L2₹1.7 Cr+₹1,771.76 (0.01%)Rejected-Finance NEAR R K HOTEL DISTRICT POONCH J K PIN 185101 | POONCH | POONCH | JAMMU AND KASHMIR | 185101 | ₹1.7 Cr+₹1,771.76 (0.01%) | L2 | Rejected-Finance Other than lowest |
| 3 | L3₹1.7 Cr+₹3.0 L (1.79%)Rejected-Finance | ₹1.7 Cr+₹3.0 L (1.79%) | L3 | Rejected-Finance Other than lowest |
| Sl No | Description | Qty | Unit | M/S RAJINDER KUMAR L2 | M/S KEWAL KRISHAN SANJEEV KUMAR VAID L3 | NATIONAL TRADING COMPANY L1 |
|---|---|---|---|---|---|---|
| 1.00Sch 'A' Part-I (Building Work):-This Schedule is not Pre-Priced by MES and the Pre-Priced rate indicated as "Rs. 0.00" under col.5 signifies this fact only. | ||||||
| 1.01 | Construction of block of Cook House and Dining Hall complete all as shown on drawings and as specified. | 1 | Each Block | 1,30,00,000 ₹1,30,00,000 | 1,30,00,000 ₹1,30,00,000 | 1,29,00,000 ₹1,29,00,000 Lowest |
| 2.00 | Total Amount of Sch 'A' Part - II (Site Clearance and Development Work) | 1 | Lump sum | 2,50,000 ₹2,50,000 | 1,75,000 ₹1,75,000 Lowest | 2,30,083.37 ₹2,30,083.37 |
| 3.00 | Total Amount of Sch 'A' Part - III (Internal Water Supply Work) | 1 | Lump sum | 35,000 ₹35,000 Lowest | 35,000 ₹35,000 Lowest | 38,890.2 ₹38,890.2 |
| 4.00 | Total Amount of Sch 'A' Part - IV (Internal Electric Supply Work) | 1 | Lump sum | 2,00,000 ₹2,00,000 Lowest | 2,50,000 ₹2,50,000 | 3,08,634.53 ₹3,08,634.53 |
| 5.00 | Total Amount of Sch 'A' Part - V (Plumbing Work) | 1 | Lump sum | 25,000 ₹25,000 | 20,000 ₹20,000 Lowest | 23,829.56 ₹23,829.56 |
| 6.00 | Total Amount of Sch 'A' Part - VI (Area Drainage Work) | 1 | Lump sum | 1,10,000 ₹1,10,000 | 90,000 ₹90,000 Lowest | 97,835.68 ₹97,835.68 |
| 7.00 | Total Amount of Sch 'A' Part -VII (Sewage Disposal Work) | 1 | Lump sum | 1,60,000 ₹1,60,000 | 1,50,000 ₹1,50,000 | 1,29,095.04 ₹1,29,095.04 Lowest |
| 8.00 | Total Amount of Sch 'A' Part - VIII (Protective Work) | 1 | Lump sum | 18,00,000 ₹18,00,000 | 15,00,000 ₹15,00,000 | 13,32,876.42 ₹13,32,876.42 Lowest |
| 9.00 | Total Amount of Sch 'A' Part -IX (Path Work) | 1 | Lump sum | 2,70,000 ₹2,70,000 | 2,75,000 ₹2,75,000 | 2,12,929.92 ₹2,12,929.92 Lowest |
Tender Value
₹1.7 Cr
EMD Value
₹2.5 L
Closing Date
21 Mar 2026, 6:00 pmClosed
Chief Engineer Udhampur Zone
HQ Chief Engineer Udhampur Zone, PIN-900386, C/O 56 APO
PROVN OF COOK HOUSE AND DINING HALL ALONGWITH ALLIED INFRASTRUCTURE AT GULPUR UNDER GE 881 EWS
2026_MES_751998_1
87993-A/E8
Open Tender
Civil Works
Lump-sum
Poonch
AS per NIT
8 documents required · 8 mandatory
₹1,000
GE 881 EWS
₹2.5 L
Yes
HQ Chief Engineer Udhampur Zone
21 Jul 2026
9 Feb 2026
23 Mar 2026
9 Feb 2026
21 Mar 2026
16 Mar 2026
10 Feb 2026 - 20 Feb 2026
23 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Sch 'A' Part-I (Building Work):-This Schedule is not Pre-Priced by MES and the Pre-Priced rate indicated as "Rs. 0.00" under col.5 signifies this fact only. | |||||
| 1.01 | Construction of building of Cook House and Dining Hall complete all as shown on drawings and as specified. | 1 | Each Block | - | - |
| 2 | Total Amount of Sch 'A' Part - II (Site Clearance and Development Work) | 1 | Lump sum | 3,28,690.53 | ₹3,28,690.53 |
| 3 | Total Amount of Sch 'A' Part - III (Internal Water Supply Work) | 1 | Lump sum | 38,890.2 | ₹38,890.2 |
| 4 | Total Amount of Sch 'A' Part - IV (Internal Electric Supply Work) | 1 | Lump sum | 4,13,772.71 | ₹4,13,772.71 |
| 5 | Total Amount of Sch 'A' Part - V (Plumbing Work) | 1 | Lump sum | 23,829.56 | ₹23,829.56 |
| 6 | Total Amount of Sch 'A' Part - VI (Area Drainage Work) | 1 | Lump sum | 97,835.68 | ₹97,835.68 |
| 7 | Total Amount of Sch 'A' Part -VII (Sewage Disposal Work) | 1 | Lump sum | 1,84,421.49 | ₹1,84,421.49 |
| 8 | Total Amount of Sch 'A' Part - VIII (Protective Work) | 1 | Lump sum | 21,49,800.69 | ₹21,49,800.69 |
| 9 | Total Amount of Sch 'A' Part -IX (Path Work) | 1 | Lump sum | 3,04,185.6 | ₹3,04,185.6 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.25 MB
109-174_merged.pdf
Tender Documents • 7.79 MB
Drg2_compressed.pdf
Additional Documents • 0.92 MB
BOQ_842251.xls
BOQ • 0.38 MB
Drg3_compressed.pdf
Additional Documents • 0.89 MB
Drg4_compressed.pdf
Additional Documents • 0.65 MB
Drg5_compressed.pdf
Additional Documents • 1.08 MB
Drg6_compressed.pdf
Additional Documents • 0.20 MB
Drg1_compressed.pdf
Additional Documents • 5.00 MB
CorrNo09.pdf
PDF • 1.94 MB
CorrNo06.pdf
PDF • 0.32 MB
pdf.pdf
PDF • 0.32 MB
CorrNo04.pdf
PDF • 0.32 MB
CorrNo03.pdf
PDF • 0.32 MB
CorrNo02.pdf
PDF • 0.32 MB
CorrNo01.pdf
PDF • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .