Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.8 LAccepted-Finance | 1 | Accepted-Finance Accepted | |
| 2 | 1₹1.8 LAccepted-Finance R O VILLAGE SHEKHAL P O DHADI GHUNSA TEHSIL ROHRU DISTT SHIMLA | 1 | Accepted-Finance Accepted | |
| 3 | 2₹2.1 L+₹32,672.29 (18.3%)Rejected-Finance | 2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | SAUNKHLA ENTERPRISES L2 | Vivek Thakur L1 | VICKY RAM L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation and trenches etc. in earth work, lift upto 1.5 metres stacking the excavated soil not more than 3 metres clear from the edge of excavation and then returning the stacked soil in 15 cm layers, when required into plinths, sides of foundation etc., consolidating each deposited layers by ramming and water and then disposing of all surplus excavated earth as directed within all leads and lifts. | 5.4 | Cum | 330 ₹1,782 | 315 ₹1,701 Lowest | 315 ₹1,701 Lowest |
| 2.00 | Providing and laying cement conenrete 1:4:8/1 cement:4approved sand 8 approved quarry stone aggregate 40mm nominal size) and curing complelte excluding cost of form work in foundation and plinth including carriage of material within all leads and lifts. | 0.69 | Cum | 8,500 ₹5,865 | 7,550 ₹5,209.5 Lowest | 7,550 ₹5,209.5 Lowest |
| 3.00 | 2nd class brick work using common brunt clay building bricks in foundation and plinth in cement mortar 1:6 (1 cement:6 Sand). | 8.68 | Cum | 11,500 ₹99,820 | 10,800 ₹93,744 Lowest | 10,800 ₹93,744 Lowest |
| 4.00 | 2nd class brick work using common brunt clay building bricks in foundation and plinth in cement mortar 1:6 (1cement :6 Sand). | 4.3 | Cum | 11,500 ₹49,450 | 5,100 ₹21,930 Lowest | 5,100 ₹21,930 Lowest |
| 5.00 | P/L 40mm thick cement concrete flooring 1:2:4(1cement:Zapproved quarry sand:4 approved quality stone aggregate 20 mm and below laid over base concrete and finished with floating coat of neat cement. | 1.82 | Sqm | 600 ₹1,093.8 | 580 ₹1,057.34 Lowest | 580 ₹1,057.34 Lowest |
| 6.00 | 15 mm thick cement plaster in single coat with cement mortar 1:3 (1 cement:3 sand) on rough side or brick masonary/stone masonary/concrete/ walls for interior plastering upto floor two level i/c internal rounded angles chamfers and or rounded angles not exceeding 80mm in girth and finished even and smooth in cement mortar 1:3 (1 cement :3 sand). | 46.2 | Sqm | 375 ₹17,325 | 350 ₹16,170 Lowest | 350 ₹16,170 Lowest |
| 7.00 | Demolition of Brick work below ground level 1.5 metres depth including stacking of serviceable material anu disposal of unserviceable material within 20 metres lead | 14.33 | Cum | 2,500 ₹35,825 Lowest | 2,699 ₹38,676.67 | 2,699 ₹38,676.67 |
Tender Value
₹1.7 L
EMD Value
₹3,451
Closing Date
25 Sept 2026, 11:00 amClosed
Executive Engineer
Jal Shakti Division Baddi
(SH Demolition and reconstruct of 1 no. Main delivery tank (MDT) at Tube well Thana Harizon Basti). (PDNA).
2026_HPIPH_143563_1
NIT No. 19948-20048 Dt. 16-09-2026
Open Tender
Civil Works
Item Rate
30 days
Baddi
Please refer Tender documents.
6 documents required · 6 mandatory
₹350
₹3,451
6 Oct 2026
16 Sept 2026
25 Sept 2026
16 Sept 2026
25 Sept 2026
16 Sept 2026
16 Sept 2026 - 24 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation and trenches etc. in earth work, lift upto 1.5 metres stacking the excavated soil not more than 3 metres clear from the edge of excavation and then returning the stacked soil in 15 cm layers, when required into plinths, sides of foundation etc., consolidating each deposited layers by ramming and water and then disposing of all surplus excavated earth as directed within all leads and lifts. | 5.4 | Cum | - | - |
| 2 | Providing and laying cement conenrete 1:4:8/1 cement:4approved sand 8 approved quarry stone aggregate 40mm nominal size) and curing complelte excluding cost of form work in foundation and plinth including carriage of material within all leads and lifts. | 0.69 | Cum | - | - |
| 3 | 2nd class brick work using common brunt clay building bricks in foundation and plinth in cement mortar 1:6 (1 cement:6 Sand). | 8.68 | Cum | - | - |
| 4 | 2nd class brick work using common brunt clay building bricks in foundation and plinth in cement mortar 1:6 (1cement :6 Sand). | 4.3 | Cum | - | - |
| 5 | P/L 40mm thick cement concrete flooring 1:2:4(1cement:Zapproved quarry sand:4 approved quality stone aggregate 20 mm and below laid over base concrete and finished with floating coat of neat cement. | 1.82 | Sqm | - | - |
| 6 | 15 mm thick cement plaster in single coat with cement mortar 1:3 (1 cement:3 sand) on rough side or brick masonary/stone masonary/concrete/ walls for interior plastering upto floor two level i/c internal rounded angles chamfers and or rounded angles not exceeding 80mm in girth and finished even and smooth in cement mortar 1:3 (1 cement :3 sand). | 46.2 | Sqm | - | - |
| 7 | Demolition of Brick work below ground level 1.5 metres depth including stacking of serviceable material anu disposal of unserviceable material within 20 metres lead | 14.33 | Cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
PWD6.pdf
Tender Documents • 0.26 MB
PWD8.pdf
Tender Documents • 1.30 MB
TandC.pdf
Tender Documents • 0.12 MB
BOQ_213323.xls
BOQ • 2.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .