Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹58.1 LAccepted-AOC SOMNATH NAGAR SR NO 43 1 2 GREWAL HOUSING SOCIETY PUNE NAGAR ROAD WADGAON SHERI PUNE 411 014 | PUNE | PUNE | MAHARASHTRA | 411014 | L1 | Accepted-AOC ACCEPTED BEING LOWEST BIDDER | |
| 2 | L2₹60.3 L+₹1.9 L (3.22%)Rejected-Finance AADARSH RESIDENCY LANE 06 PAWAR COLONY NEAR PMC SCHOOL VITTHAL NAGAR S NO 15 HADAPSAR PUNE | L2 | Rejected-Finance REJECTED BEING NOT LOWEST BIDDER | |
| 3 | L3₹66.5 L+₹8.0 L (13.8%)Rejected-Finance S 15 SACRED WORLD OPP SACRED HEART TOWN WANWADI PUNE 411040 | PUNE | MAHARASHTRA | 411040 | L3 | Rejected-Finance REJECTED BEING NOT LOWEST BIDDER | |
| 4 | L4₹67.9 L+₹9.4 L (16.1%)Rejected-Finance | L4 | Rejected-Finance REJECTED BEING NOT LOWEST BIDDER | |
| 5 | L5₹77.7 L+₹19.2 L (32.9%)Rejected-Finance | L5 | Rejected-Finance REJECTED BEING NOT LOWEST BIDDER |
| Sl No | Description | Qty | Unit | MOHANLAL MATHRANI CONS. PVT. LTD. L5 | Aadarsh Bharat Enviro Pvt Ltd L2 | Sunshine Ventures L4 | Ganesh Enterprises L1 | PAVEWAY CONSTRUCTIONS PRIVATE LIMITED L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | M & L Repairs to pot holes any depth n,exc 1 sqm each including sweeping free from dust and mud or water, scoring sunken surfaces in roads etc, cutting around edges atleast 25mm in depth, making good by applying tack coat with bituminous primer (VG -10) @ 5 Kg per 10Sqm,putting in premix bituminous macadam well rammed and sealed with binder (VG-30) 9.8 Kg per 10 Sqm of paving bitumen, blinded with 0.09 cum of stone chippings 6.3mm size and again well rammed(including supply of premixed macadam binder and chippings) depth of pot holes exceeding 30mm complete all as specified and directed by Engr-in-charge. | 5 | Per 10 Sqm | 1,000 ₹5,000 | 300 ₹1,500 Lowest | 1,000 ₹5,000 | 800 ₹4,000 | 300 ₹1,500 Lowest |
| 2.00 | M&L for scarifying or picking to the depth exc 50mm and n exe 100mm gavelled, macadam or bituminous macadam surfaces in area n exe 400 sqm all and removing exceeding 50 Mtr & n.exc 500mtrs and stacking complete all as specified and as directed by Engineer-in-Charge. | 50 | Per 10 Sqm | 50 ₹2,500 | 25 ₹1,250 | 50 ₹2,500 | 20 ₹1,000 | 12 ₹600 Lowest |
| 3.00 | M&L for providing 7.5cm thick (Compatcted thickness) WBM, with granite, trap or basalt coarse aggregate of grading 2(63 to 40mm size) or of grading 3(50 to 20mm size) spread and rolled and consolidated to gradient and camber required complete all as specified and directed by Engr-in-Charge. | 40 | Per 10 Sqm | 900 ₹36,000 | 750 ₹30,000 Lowest | 2,000 ₹80,000 | 1,200 ₹48,000 | 800 ₹32,000 |
| 4.00 | All as per item No.03 above but except material (Material used obtained from scarifying). | 10 | Per 10 Sqm | 50 ₹500 Lowest | 150 ₹1,500 | 200 ₹2,000 | 180 ₹1,800 | 150 ₹1,500 |
| 5.00 | M &L Preparing unsurfaced WBM surface by brushing with wire brush for removing caked mud etc., sweeping with brooms, and finally fanning the cleaned surfaces with gunny bag to remove all loose dirt etc and applying evenly a tack coat with bituminous primer RS-1 @ 7.5 kg per 10 Sqm with sprayer over existing surface etc complete all as specified and directed by Engr-in-charge. | 50 | Per 10 Sqm | 250 ₹12,500 | 190 ₹9,500 | 200 ₹10,000 | 190 ₹9,500 | 150 ₹7,500 Lowest |
| 6.00 | M&L for Preparing black top surface by brushing with wire brushes for removing caked mud etc. sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc.and applying evenly a priming/tack coat with bitumen emulsion RS-1 @ 2.5Kg/10Sqm with sprayer over existing surface etc complete all as specified and directed by Engr-in-Charge. | 1,168 | Per 10 Sqm | 108 ₹1,26,144 | 60 ₹70,080 Lowest | 120 ₹1,40,160 | 150 ₹1,75,200 | 125 ₹1,46,000 |
| 7.00 | M&L for providing 75 mm thick (consolidated thickness) or less premixed bituminous macadam using paving bitumen (VG-30) @4% by weight of hot mix mixed with aggreagate (as specified) in hot mix plant , rolled consolidated with 8 to 12 ton power/vibratory roller to the required gradient and camber on prepared WBM/Bituminous surfaces complete all as specified and directed by Engr-in-Charge.
Note: The contractor quoted the rate shall be deemed to include the following elements:
(i). The contractor shall got the mix design done through Govt approved lab and same shall be got approved from GE before incorporating in the work.
(ii). In case variation in the bitumen content as per approved design mix in comparison with the bitumen content as specified above, the variation in the quantity of bitumen shall be adjusted with price adjustment.
(iii). Contractor shall submit the authenticated weigh batch receipt for every load of materials brought at site. | 25 | Cum | 5,000 ₹1,25,000 | 4,000 ₹1,00,000 | 4,000 ₹1,00,000 | 3,300 ₹82,500 Lowest | 3,600 ₹90,000 |
| 8.00 | M & L for applying evenly a tack coat with bituminous emulsion RS-1 @ 3kg per 10 Sqm with sprayer over premix bitumen macadam surface complete all as specified and directed by Engr-in-charge. | 50 | Per 10 Sqm | 108 ₹5,400 | 90 ₹4,500 Lowest | 150 ₹7,500 | 110 ₹5,500 | 135 ₹6,750 |
| 9.00 | M&L for providing bituminous pre-mix asphaltic dense concrete 30 mm consolideted thickness with 5.5% binder content by (paving bitumen VG -30) weight of total mix. Laid with mechanical paver rolled and compacted to required camber and gradient with 8 to 12 ton power roller complete all as specified and directed by Engr-in-Charge.
Note: The contractor quoted rate shall be deemed to include the following elements:
(i) The contractor shall got the mix design done through Govt approved lab and same shall be got approved from GE before incorporating in the work.
(ii) In case variation in the bitumen content as per approved design mix in comparison with the bitumen content as specified above, the variation in the quantity of bitumen shall be adjusted with price adjustment.
(iii).Contractor shall submit the authenticated weigh batch receipt for every load of materials brought at site.
(iv) The bitumen content ref at item No. 7 & 9 are for quoting/assesment of rate by the contractor. In case of actual bitumen consumption becomes less than specified consumption then the same shall be regularised through minus price adjustment at pro rata rates of the cost of bitumen whichever is more. | 1,218 | Per 10 Sqm | 2,007 ₹24,44,526 | 2,050 ₹24,96,900 | 2,150 ₹26,18,700 | 1,950 ₹23,75,100 Lowest | 1,999 ₹24,34,782 |
| 10.00 | M&L for Moorum/Red bajri spread (Spreading thickness 75 mm) rolled and consolidated to gradient and camber required complete all as specified and directed by Engr-in-Charge. | 5 | Per 10 Sqm | 450 ₹2,250 | 450 ₹2,250 | 300 ₹1,500 Lowest | 460 ₹2,300 | 580 ₹2,900 |
Tender Value
₹98.3 L
EMD Value
₹1.7 L
Closing Date
15 Oct 2025, 6:00 pmClosed
CWE Khadki Pune
Headquarters CWE Khadki, Military Engineer Services, Range Hills Road, Khadki, Pune-411003
REPAIR RESURFACING TO ROAD ROAD FURNITURE ROAD MARKING AND PATH AREA UNDER GE CENTRAL KAHDKI
2025_MES_730254_1
CWE/KKE/TOKEN-26OF 2025-26
Open Tender
Civil Works - Roads
Item Rate
180 days
CWE Khadki Pune
AS PER TENDER DOCUMENTS
6 documents required · 6 mandatory
₹1,000
GE CENTRAL KHADKI
₹1.7 L
Yes
21 Nov 2025
10 Sept 2025
17 Oct 2025
10 Sept 2025
15 Oct 2025
1 Oct 2025
10 Sept 2025 - 17 Sept 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .