Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.3 LAccepted-AOC MU PO KUWARBAV TAL DIST RATNAGIRI | RATNAGIRI | MAHARASHTRA | 403522 | ₹16.3 L | L1 | Accepted-AOC accepted |
| 2 | L2₹16.7 L+₹40,735.67 (2.50%)Rejected-AOC | ₹16.7 L+₹40,735.67 (2.50%) | L2 | Rejected-AOC rejected |
| 3 | L3₹17.1 L+₹81,471.34 (5.00%)Rejected-AOC | ₹17.1 L+₹81,471.34 (5.00%) | L3 | Rejected-AOC rejected |
Tender Value
₹16.3 L
EMD Value
₹20,000
Closing Date
23 Mar 2026, 5:00 pmClosed
Executive Engineer Works Department ZP Ratnagiri
Dr.Babasaheb Ambedkar Bhavan Ground Floor Executive Engineer Works Department Ratnagiri ZP Ratnagiri
Constructing Mahila Bachat Gat Bhavan and Sabhagruha for Dhyey Mahila Gram Sangha Kuvarbaon Sainagar Tal. Dist. Ratnagiri, For the Year 2025 - 26
2026_RATNA_1287239_1
RZP/WD-Ratnagiri/E-Ten Un EMP ENGR-20/25-26
Open Tender
Civil Works - Buildings
Percentage
180 days
Ratnagiri
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
₹20,000
13 Jul 2026
16 Mar 2026
25 Mar 2026
16 Mar 2026
23 Mar 2026
16 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Item No. 1 :- Excavation for Foundation in ----- including Removing the Excavated Material up to a Distance of 50 mt. Beyond the Building Area & Stacking & Spreading as Directed, Dewatering, Preparing the Bed for the Foundation & Necessary Back Filling, Ramming, Watering including Shoring & Strutting etc. complete. (Lift upto 1.5 mt) By Manual Means. | 1 | - | - | - |
| 2 | A) Earth, Soil of All Types, Sand, Gravel & Soft Murum
SSR Sr. No. 720 P/I 153/21.01 | 1 | - | - | - |
| 3 | B) Laterite Rock , SSR Sr. No.P/I 155 /21.21 | 4.05 | Cum | 1,465 | ₹5,933.25 |
| 4 | Item No. 2 :- Providing & Laying Cast in Situ / Ready Mix Cement Concrete in M - 10 of Trap Metal for Foundation & Bedding including Bailing Out Water, Steel Centering, Formwork, Laying / Pumping, Compacting, Roughening them if Special Finish is to be Provided, Finishing if Required & Curing complete, with Fully Automatic Micro Processor Based PLC with SCADA Enabled Reversible Drum Type Mixer / Concrete Batch Mix Plant (Pan Mixer) etc. complete. With Fine Aggregate (Crushed Sand V. S. I. Grade)R. A. No. 1 | 10.77 | Cum | 6,422 | ₹69,174.57 |
| 5 | Item No. 3 :- Providing & Laying in Situ / Ready Mix Cement Concrete M - 20 of Trap Metal for R. C. C. Work in Foundations like Raft, Strip Foundations, Grillage & Footings of R. C. C. Columns & Steel Stanchions etc. including Bailing Out Water, Steel Centering, Formwork, Laying / Pumping, Cover Blocks, Compaction & Curing, Roughening the Surface if Special Finish is to be Provided (Excluding Reinforcement & Structural Steel) etc. complete, with Fully Automatic Micro Processor Based PLC with SCADA Enabled Reversible Drum Type Mixer / Concrete Batch Mix Plant (Pan Mixer) etc. complete. With Fine Aggregate (Natural Sand / Crushed Sand V. S. I. Grade Finely Washed etc. complete.)R. A. No. 2 | 0.71 | Cum | 7,640.95 | ₹5,425.07 |
| 6 | Item No. 4 :- Providing & Laying Cast in Situ / Ready Mix Cement Concrete M - 20 of Trap Metal for R. C. C. Columns as per Detailed Designs & Drawings or as Directed including Steel Centering, Formwork, Cover Blocks, Laying / Pumping, Compaction, Finishing the Formed Surface with Cement Mortar 1:3 of Sufficient Minimum Thickness to give a Smooth & Even Surface or Roughening if Special Finish is to be Provided & Curing etc. complete. (Excluding Reinforcement & Structural Steel), with Fully Automatic Micro Processor Based PLC with SCADA Enabled Reversible Drum Type Mixer / Concrete Batch Mix Plant (Pan Mixer) With Fine Aggregate (Natural Sand / Crushed Sand V. S. I. Grade Finely Washed etc.)R. A. No. 3 | 7.16 | - | 14,319.95 | ₹1,02,530.84 |
| 7 | Item No. 5 :- Providing Laterite Stone Masonry in Cement Mortar 1:6 in Foundations & Plinth including Racking Out Joints when Plastering is to be Done / Striking Joints when No Plastering is to be Done, Watering & Scaffolding.R. A. No. 4 | 12.95 | - | 6,386.95 | ₹82,711 |
| 8 | Item No. 6 :- Providing & Laying Cast in Situ / Ready Mix Cement Concrete M - 20 of Trap Metal for R. C. C. Beams & Lintels as per Detailed Designs & Drawings or As Directed including Steel Centering, Formwork, Cover Blocks, Laying / Pumping, Compaction & Roughening the Surface if Special Finish is to be Provided & Curing etc. complete. (Excluding Reinforcement & Structural Steel) with Fully Automatic Micro Processor Based PLC with SCADA Enabled Reversible Drum Type Mixer / Concrete Batch Mix Plant (Pan Mixer) etc. complete. With Fine Aggregate (Crushed Sand V. S. I. Grade) | 0.48 | Cum | 12,805.95 | ₹6,159.66 |
| 9 | 2:=DSlm
¯³ÝÞ'(C±Item No. 7 :- Filling in Plinth & Floors with Approved Excavated Material in 15 cm. to 20 cm. Layers including Watering & Compaction etc. complete.SSR Sr. No. 750, P/I 157/21.36
"( | 7.3 | - | 120 | ₹876 |
| 10 | 畴慲慓摮⼠䌠畲桳摥匠湡⹖匠⹉䜠慲敤䘠湩汥⁹慗桳摥攠捴⤮⹒䄠潎〱')/0QUYZ_dxy¥¦°µ¿ÉøùĘęğĢĭĮĵĻŅňŤůŵŸƄƇƒƗƞƢƱƺǂDžnjǛǴǾȊȌȒȘȠȪȱȵɒɞʈʌʶʷ˜ˬ̺̀́̎̐Ɇⴈ䤀整潎㈲㨠牐癯摩湩…慌楹杮䌠獡⁴湩匠瑩⁵ 敒摡⁹楍⁸敃敭瑮䌠湯牣瑥⁍〲漠牔灡䴠瑥污映牯删⹃䌠慐摲景删煥極敲桔捩湫獥湩汣摵湩瑓敥敃瑮牥湩Ⱨ䘠牯睭牯Ⱬ䌠癯牥䈠潬正ⱳ䰠祡湩 畐灭湩Ⱨ䌠浯慰瑣湩Ⱨ䘠湩獩楨杮☠删畯桧湥湩桴浥椠灓捥慩楆楮桳椠潴戠牐癯摩摥☠䌠牵湩瑥挠浯汰瑥⠠硅汣摵湩敒湩潦捲浥湥⁴…瑓畲瑣牵污匠整汥Ⱙ眠瑩畆汬⁹畁潴慭楴楍牣牐捯獥潳慂敳䱐⁃楷桴匠䅃䅄䔠慮汢摥删癥牥楳汢牄浵吠灹楍數 潃据敲整䈠瑡档䴠硩倠慬瑮⠠慐楍數⥲攠捴潣灭敬整楗桴䘠湩杁牧来瑡丨瑡牵污匠湡 牃獵敨慓摮嘠⹓䤠片摡楆敮祬圠獡敨瑥ษᜀༀ᠀᠀ᜀᬀ᠀✀ᜀ⤀᠀⼀ᜀ ᠀儀ᜀ唀᠀夀ᜀ娀᠀开ᜀ搀᠀爀ᜀ瘀᠀褀ᜀ錀᠀쌀ᜀ쐀᠀ᜀ᠀ᜀ豈᠀ࠀᜁᄀ᠁ᤀᜁᰀ᠁⌀ᜁ㈀᠁䬀ᜁ䰀᠁帀ᜁ攀᠁輀ᜁ錀᠁봀ᜁ븀᠁ᜁ᠁܀ᜂࠀ᠂ᔀᜂᘀ᠂䄀ᜂ꜀ࠁ瑉浥丠㈠″ⴺ倠潲楶楤杮☠䘠硩湩湩倠獯瑩潩䵔⁔䕆ⴠ㔠〰䈠牡删楥普牯散敭瑮漠慖楲畯楄浡瑥牥潦⹒䌠⹃倠汩慃獰潆瑯湩獧潆湵慤楴湯ⱳ匠慬獢敂浡ⱳ䌠汯浵獮慃潮楰獥瑓楡捲獡ⱥ丠睥汥ⱳ䌠慨橪ⱡ䰠湩整獬慐摲Ⱪ䌠灯湩獧楆獮牁档獥攠捴獡瀠牥䐠瑥楡敬敄楳湧ⱳ䐠慲楷杮…捓敨畤敬湩汣摵湩畃瑴湩Ⱨ䈠湥楤杮潈歯湩桴慂獲楂摮湩楷桴圠物獥漠慔正圠汥楤杮☠匠灵潰瑲湩獡删煥極敲潣灭敬整⹒䄠潎㈱ฮᜀༀ᠀ᤀᜀᨀ᠀℀ᜀ─᠀一ᜀ刀᠀挀ᜀ栀᠀瀀ᜀ焀᠀ᜀĀ᠁ᬀᜁḀ᠁✀ᜁ㈀᠁䬀ᜁ倀᠁唀ᜁ嘀᠁崀ᜁ挀᠁栀ᜁ氀᠁砀ᜁ笀᠁蔀ᜁ褀᠁鄀ᜁ팀ࠀ瑉浥丠㈠‴ⴺ倠潲楶楤杮䤠瑮牥慮敃敭瑮倠慬瑳牥ⴠⴭ洠桔捩湩匠湩汧潃瑡椠敃敭瑮䴠牯慴ⴭⴭ圠瑩潨瑵丠敥畲䘠湩獩潴䌠湯牣瑥牯䈠楲正匠牵慦散湩䄠汬倠獯瑩潩湩汣摵湩捓晡潦摬湩…畃楲杮攠捴潣灭敬整.ᘀᜀༀ᠀㴀ᜀ䄀᠀䰀ᜀ倀᠀戀ᜀ挀᠀樀ᜀ欀᠀眀ᜀ笀᠀萀ᜀ蘀᠀销ᜀ餀᠀鰀ᜀ鴀᠀ꔀᜀ뀀᠀밀ᜀ봀᠀쐀ᜀ⤀⥁ㄠ′浭吠楨正⹃䴠㨱‴⹒䄠潎㌱䄠⤩⥂㈠‰浭吠楨正⹃䴠㨱‴⹒䄠潎㌱䈠锩ࠁ3瑉浥丠㈠‴ⴺ倠潲楶楤杮☠䰠祡湩楖牴晩敩楍牲牯⼠䜠潬獳⁹楆楮桳吠汩獥䐠捥牯瑡癩祔数栠癡湩楓敺㔠〹洠琠〶‵浭⁸㤵‰浭潴㘠㔰洠漠‸潴ㄠ‰浭桔捩湫獥…潃普物業杮琠⹉匠㔱㈶′〲㘰⠠片畯⁰求⥡漠灁牰癯摥䴠歡ⱥ匠慨敤☠倠瑡整湲映牯䘠潬牯湩湩删煥極敲潐楳楴湯䰠楡湯愠䈠摥漠㨱‴敃敭瑮䴠牯慴湩汣摵湩敎瑡䌠浥湥⁴汆慯ⱴ䘠汩楬杮䨠楯瑮ⱳ䌠牵湩…汃慥楲杮攠捴潣灭敬整刮⹁丠ㄠิᜀༀ᠀᠀ᜀᬀ᠀㌀ᜀ㐀᠀㬀ᜀ㰀᠀䈀ᜀ䌀᠀䠀ᜀ䤀᠀匀ᜀ吀᠀堀ᜀ怀᠀搀ᜀ攀᠀洀ᜀ漀᠀舀ᜀ萀᠀贀ᜀ輀᠀鈀ᜀ鐀᠀ꔀᜀꠀ᠀눀ᜀ똀᠀저ᜀ쨀᠀팀ᜀ�᠀ᜀ᠀ᜀff᠀̀ᜁ܀᠁Ḁᜁ∀᠁☀ᜁ⨀᠁㬀ᜁ䘀᠁栀ᜁ椀᠁漀ᜁ爀᠁稀ᜁ缀ࠁ-瑉浥丠㈠‵ⴺ倠潲楶楤杮☠䰠祡湩楖牴晩敩楍牲牯⼠䜠潬獳⁹楆楮桳吠汩獥栠癡湩楓敺㔠〹洠潴㘠㔰洠⁸㤵‰浭琠〶‵浭漠‸潴ㄠ‰浭吠楨正敮獳☠䌠湯楦浲湩潴䤠⹓ㄠ㘵㈲ⴠ㈠〰‶䜨潲灵䈠慬
景䄠灰潲敶慍敫桓摡…慐瑴牥潦慄潤☠匠楫瑲湩湩删煥極敲潐楳楴湯䘠硩摥椠㨱‴敃敭瑮䴠牯慴湩汣摵湩敎瑡䌠浥湥⁴汆慯ⱴ䘠汩楬杮䨠楯瑮ⱳ䌠牵湩…汃慥楲杮攠捴潣灭敬整刮⹁丠ㄠีᜀༀ᠀᠀ᜀᬀ᠀㬀ᜀ㰀᠀䈀ᜀ䌀᠀䠀ᜀ倀᠀吀ᜀ唀᠀尀ᜀ帀᠀漀ᜀ焀᠀礀ᜀ笀᠀縀ᜀ耀᠀退ᜀ錀᠀鴀ᜀꄀ᠀대ᜀ딀᠀븀ᜀ쌀᠀�ᜀ�᠀ᜀ᠀ᜀ᠀ᜀ豈᠀ကᜁ᐀᠁─ᜁ ᠁刀ᜁ匀᠁夀ᜁ尀᠁搀ᜁ夀ࠁ)瑉浥丠㈠‵ⴺ倠潲楶楤杮☠䰠祡湩慍瑴䘠湩獩敃慲業楔敬景栠癡湩楓敺㌠‰浣⁸〳挠䌠湯楦浲湩潴䤠⹓ㄠ㘵㈲⼠㈠〰‶䜨潲灵䐠䤠⁉⥁☠㜠琠‸浭桔捩潦汆潯楲杮椠敒畱物摥倠獯瑩潩慌摩漠敂景ㄠ㐺䌠浥湥⁴潍瑲牡椠据畬楤杮䌠浥湥⁴汆慯ⱴ䘠汩楬杮䨠楯瑮眠瑩桗瑩 潃潬牵䌠浥湥⁴汓牵祲汃慥楮杮畃楲杮攠捴潣灭敬整刮⹁丠ㄠึᜀༀ᠀ᤀᜀᨀ᠀㬀ᜀ䘀᠀䨀ᜀ䬀᠀娀ᜀ嬀᠀攀ᜀ椀᠀琀ᜀ眀᠀笀ᜀ紀᠀謀ᜀ輀᠀鄀ᜀ錀᠀餀ᜀ騀᠀鼀ᜀꐀ᠀가ᜀ뀀᠀섀ᜀ숀᠀였ᜀ찀᠀케ᜀ팀᠀ᜀ᠀ᜁༀ᠁ᘀᜁᜀ᠁ⴀᜁ⸀᠁㸀ᜁ䤀ࠁ%瑉浥丠㈠‶ⴺ倠潲楶楤杮☠䰠祡湩敃慲業楔敬景栠癡湩楓敺㌠‰浣⁸〳挠☠䌠湯楦浲湩潴䌠牯敲灳湯楤杮䤠⹓映牯䐠摡…歓物楴杮椠敒畱物摥倠獯瑩潩楷桴删慥祤慭敤䄠桤獥癩潍瑲牡漠灁牰癯摥儠慵楬祴漠汐獡整景ㄠ㈺䌠浥湥⁴潍瑲牡椠据畬楤杮䨠楯瑮䘠汩楬杮眠瑩桗瑩 潃潬牵䌠浥湥⁴汓牵祲汃慥楮杮畃楲杮攠捴潣灭敬整ฮᜀༀ᠀ᤀᜀᨀ᠀⼀ᜀ㨀᠀㸀ᜀ㼀᠀一ᜀ儀᠀嬀ᜀ开᠀氀ᜀ洀᠀爀ᜀ眀᠀簀ᜀ紀᠀蘀ᜀ言᠀鬀ᜀꄀ᠀먀ᜀ븀᠀츀ᜀ툀᠀�ᜀ�᠀ᜀ᠀܀ᜁ᠁ሀᜁጀ᠁⤀ᜁ⨀᠁㨀ᜁ䈀ࠁ瑉浥丠㈠‷ⴺ倠潲楶楤杮☠䘠硩湩牏獩慳吠灹桗瑩汇穡摥䔠牡桴湥慷敲㔠㔷洠慗整汃獯瑥倠湡椠据畬楤杮匠吠慲⁰楷桴䔠牡桴湥慷敲䘠潯⁴敒瑳ⱳ䌠獡⁴牉湯匠楯…敖瑮倠灩灵潴传瑵楳敤䘠捡景琠敨圠污ⱬㄠ㈺㐺䈠楲正䈠瑡䰠浩潃据敲整䈠摥楤杮眠瑩潨瑵䘠畬桳湩慔歮☠椠獴䄠捣獥潳楲獥攠捴潣灭敬整匮剓匠丠ㄠ〴ⰱ倠䤯㈠㜷㐯⸲〳-._iou§¹ÁÆÇÌÍìôĂĉĔƌ䤀整潎㠲㨠牐癯摩湩…楆楸杮圠楨整䜠慬敺慅瑲敨睮牡慗桳䠠湡慂楳景㔠‵浣⁸〴挠猠穩湩汣摵湩潃摬圠瑡牥倠汩慬慔⁰ 潃摬☠䠠瑯圠瑡牥倠汩慬慔⁰牂捡敫獴畒扢牥倠畬獧☠䈠慲獳䌠慨湩瑓灯吠灡☠丠捥獥慳祲倠灩潣湮捥楴湯湩汣摵湩⹐嘠⹃圠獡整倠灩…牴灡甠⁰潴琠敨传瑵楳敤䘠捡景琠敨圠污䴠歡湩潇摯琠敨䐠浡条摥匠牵慦散敔瑳湩瑥挠浯汰瑥卓⁒牓潎㌱㜵⽐⁉㜲⼲ㄴ㘮整潎㤲㨠牐癯摩湩…楆楸杮㜠‵浭楄浡瑥牥匠慴楢楬敺楐数⼠倠⹖䌠潓汩嘠湥⁴ 慗瑳楐数☠眠瑩敎散獳牡⁹楆瑸牵獥☠䘠瑩楴杮猠捵獡䈠湥獤敔獥楓杮敬䨠湵瑣潩獮汓瑯整敖瑮汃浡獰攠捴潣灭敬整卓⁒牓潎㐱㈲⽐⁉㜲⼹㈴㔮㸱整潎〳㨠牐癯摩湩…楆楸杮䠠⹄倠䌠湯慴湩牥传敮倠敩散䴠畯摬摥圠瑡牥吠湡慍敤漠瑵漠楈桧䐠湥楳祴倠汯瑹票敬…畂汩⁴潃牲杵瑡潩湩汣摵湩景䐠汥癩牥⁹灵琠敄瑳湩瑡潩潈獩楴杮☠䘠硩湩景䄠捣獥潳楲獥猠捵獡䤠汮瑥畏汴瑥癏牥汦睯漠汁慔歮慃慰楣祴䄠潢敶㈠〰琠〱〰䰠瑩牥即剓匠丠ㄠ㈴ⰴ倠䤯㈠〸㐯⸲㌵š䤀整潎ㄳ㨠牐癯摩湩Ⱨ䰠祡湩…楆楸杮倠⹖䌠楐数漠㔱洠䐠慩敭整楷桴䘠瑩楴杮畳档愠敂摮ⱳ吠敥ⱳ删摥捵牥ⱳ䌠慬灭瑥椠据畬楤杮丠捥獥慳祲䔠捸癡瑡潩Ɱ吠敲据楆汬湩瑥挠浯汰瑥湩汣摵湩敒潭楶杮䔠楸瑳湩楐数䰠湩晩丠捥獥慳祲☠䌠湯敶楹杮☠匠慴正湩桴慓敭椠⹐圠⹄䌠潨歷⁹牯愠楄敲瑣摥攠捴潣灭敬却剓匠丠ㄠ㤳ⰲ倠䤯㈠㘷㐯⸲ㄲń䤀整潎㈳㨠牐癯摩湩…楆楸杮ㄠ‵浣楒楧⹐嘠⹃丠桡湡牔灡椠据畬楤杮倠䍖䜠慲楴杮敂摮潃湮捥楴杮倠敩散漠⹕倠⹖䌠楐数甠⁰潴琠敨传瑵楳敤䘠捡景圠污ⱬ䴠歡湩桴潇摯䐠浡条摥匠牵慦散☠吠獥楴杮攠捴潣灭敬整⠠牐潩灁牰癯污漠慓灭敬☠䈠慲摮戠⁹硅湅杧獩丠捥獥慳祲戠晥牯獕⥥卓⁒牓潎㐱㤸⽐⁉㠲⼸㌴ㄮ逸瑉浥丠㌠″ⴺ倠潲楶楤杮☠䘠硩湩㔱洠䐠慩敭整⹐嘠⹃吠灹灁牰癯摥䴠歡畓数楂慔⁰楷桴䘠慬杮湩汣摵湩汁捁散獳牯敩瑥挠浯汰瑥䤀整潎㐳㨠牐癯摩湩潓歡倠瑩漠楳敺ㄠ〲挠砠ㄠ〲挠砠ㄠ〲挠椠据畬楤杮䔠捸癡瑡湩…楆汬湩楷桴䈠楲正䈠瑡卓⁒牓潎㌱〹⽐⁉㜲⼵㈴ㄮ갹瑉浥丠㌠‵ⴺ倠潲楶楤杮☠䘠硩湩慈晬删畯摮删楡慗整潃汬捥楴杮倠⹖䌠楐数漠㘱‰浭楄浡瑥牥眠瑩汁敎散獳牡⁹楆瑴湩獧☠䘠獡整楮杮畳档愠牂歡瑥瑥挠浯汰瑥̪䤀整潎㘳㨠牐癯摩湩…楆楸杮倠⹖䌠慒湩圠瑡牥倠灩獥漠ㄱ‰浭畏整楄浡瑥牥☠栠癡湩慗汬吠楨正敮獳漠⸲′潴㈠㜮洠䌠湯楦浲湩潴䤠⹓ㄠ㔳㈹ⴠㄠ㤹′湩汣摵湩牐灯牥删楡慗整敒散癩湩敒散獳眠瑩⹐嘠⹃倠畬Ⱨ䈠湥Ɽ丠捥獥慳祲䘠瑩楴杮畳档愠晏獦瑥ⱳ匠潨獥椠据畬楤杮䘠硩湩桴楐数漠慗汬甠楳杮䄠灰潲敶潗摯湥䌠敬瑡牐橯捥楴杮㈠‵浭潴㐠‰浭牦浯䘠捡景圠污楆楸杮眠瑩汃灩景䄠灰潲敶畑污瑩⁹…湏畎扭牥楆楬杮琠敨䨠楯瑮甠楳杮删扵敢慇歳瑥眠瑩潓癬湥⁴敃敭瑮☠倠潲数汲⁹敒瑳湩桴桓敯漠楐数湯䌠⹃漠慍潳牮⁹求捯獫椠据畬楤杮丠捥獥慳祲匠慣晦汯楤杮☠䴠楡瑮湥湡散映牯㌠夠慥獲映牯䄠祮䰠慥慫敧牯䐠獩潬慣楴湯景倠灩獥汁桴⹐嘠⹃䘠瑩楴杮…摁楤楴湯污㈠倠敩散匠捯敫⁴汃灩桳污敢朠瑯䄠灰潲敶牦浯䔠杮湩敥湉䌠慨杲瑥挠浯汰瑥卓⁒牓潎㐱㠵⽐⁉㠲⼳㈴㠮爷瑉浥丠㌠‷ⴺ倠潲楶楤杮慐湩楴杮☠䰠瑥整楲杮映牯丠浡潂牡桷捩敄捳楲楢杮䐠瑥楡獬漠畓档圠牯瑥挠浯汰瑥吀獥楴杮䌠慨杲獥ⴠؠ敃敭瑮䘀湩杁牧来瑡॥杁牧来瑡ࡥ潃据敲整刀祯污祴䌠慨杲獥Э慳摮猀景⁴畭畲挀浵匀浱刀呍渀կ楌牴ɥ潎¡一浡景圠牯㩫䌠湯瑳畲瑣湩慍楨慬䈠捡慨⁴慇⁴桂癡湡愠摮†慓桢条畲慨映牯䐠票祥䴠桡汩片浡匠湡桧畋慶扲潡慓湩条牡†慔䐠獩删瑡慮楧楲潆桴教牡㈠㈰‵㘲 | 40.75 | - | 599 | ₹24,409.25 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.92 MB
Tendernotice_2.pdf
PDF • 0.19 MB
B1kuwarbaw.pdf
Tender Documents • 2.03 MB
BOQ_2213449.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .