| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.5 LAccepted-Finance AT SAIMALA DIVANMAL TAL PEN DIST RAIGAD | PEN | RAIGAD | MAHARASHTRA | ₹24.5 L | L1 | Accepted-Finance ok |
| 2 | L2₹24.9 L+₹32,419.43 (1.32%)Accepted-Finance PLOT NO 06 SAI PALACE APARTMENT PAWARNAGAR JUNI SANGVI PUNE 27 | PUNE | MAHARASHTRA | ₹24.9 L+₹32,419.43 (1.32%) | L2 | Accepted-Finance ok |
| 3 | L3₹25.2 L+₹65,133.35 (2.65%)Accepted-Finance RAIGAD | RAIGAD | RAIGAD | MAHARASHTRA | 402301 | ₹25.2 L+₹65,133.35 (2.65%) | L3 | Accepted-Finance ok |
Tender Value
₹24.5 L
EMD Value
₹24,542
Closing Date
28 May 2026, 5:00 pmClosed
Executive Engineer (RWS), kunthebag, alibag tal- a
Executive Engineer (RWS), kunthebag, alibag tal- alibag dist- raigad
Construction Of Protection Wall to River At Kharoshi, G.P.Kharoshi,Tal-Pen Dist- Raigad
2026_RAIGA_1303194_6
RAIGAD/RWSS/23/2026-27
Open Tender
Civil Works - Water Works
Percentage
180 days
Tal-Pen Dist- Raigad
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,180
₹24,542
10 Jun 2026
15 May 2026
29 May 2026
15 May 2026
28 May 2026
15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Item No.1 :- Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 etc.complete. | 12.3 | Cum | 181.5 | ₹2,232.45 |
| 2 | Item No.2 :- Excavation for foundation / pipe trenches by all means in hard murum including removing the excavated material upto a distance of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. | 45.1 | Cum | 205.7 | ₹9,277.07 |
| 3 | Item No.3 :- Excavation for foundation / pipe trenches in hard rock and concrete road by chiselling, wedging, line drilling by mechanical means or by all means other than blasting including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres
beyond the area and lifts as below, stacking
as directed by Engineer-in-charge, normal
dewatering, excluding backfilling, etc.
complete by all means | 102.5 | Cum | 1,230.9 | ₹1,26,167.25 |
| 4 | Item No.4:- Providing, constructing coffer dam in river basin / dam storages as per type design including excavation, filling, the middle portion with B. C. soil (in gunny bags if requried). Providing impervious / semipervious materials on both side of B.C. soil (in gunny bags if required) including ramming, compacting to the satisfaction of Engineer-in-charge, till the complction of work including dismantling coffer dam after completion of works and disposing off the material as directed by the Engineer-in-charge. | 33.75 | Cum | 899.8 | ₹30,368.25 |
| 5 | Item No.5 :- Providing dry trap/ granite/ quartzite/ gneiss, rubble stone soling in 15 cm to 20 cm thick layers including hand packing and compacting, etc. complete. (Bd-A-12/264) | 23.63 | Cum | 1,447.6 | ₹34,206.79 |
| 6 | Item No.6 :-Providing & laying in situ. C.C of trap granite/ quartzite / gneiss/ metal for foundation & bedding including dewatering , from work,compacting, curing, finishing etc. complete.
PCC M-150 | 10.5 | Cum | 6,469.1 | ₹67,925.55 |
| 7 | Item No.7 :- Providing & costing in constructing in situ. C.C of trap granite/ quartzite / gneiss/ metal of approved quality of R.C.C. work as per detailed drawing & design or as directed by Engg. in charge including dewatering , ceterind from work,compacting, finishing the formed surface with C.M. 1:3 of sufficient minimum etc.complete. RCC M-200 for Protection Wall | 136.5 | Cum | 8,719.7 | ₹11,90,239.05 |
| 8 | Item No.8 :- Providing & fixing in position steel bar reinforcement of various diameters for R.C.C. Pipes,caps,footing, foundation,slab,beams,columns,canopies, staircase, newels,chajjas, lintels,pardies,coping,fine arches etc. as per detailed designs, drawing & schedule s including cutting,bending,hooking the bars,bindingwith wires or tack welding & supporting as required etc. complete (including cost of binding wire). With Lebour Rate Tor Steel | 6.43 | MT | 80,681 | ₹5,18,778.83 |
| 9 | Itemno 9 :- Providing & fixing 80 mm dia. AC/PVC pipe weep holes at 1.5 m c/c straggererd including cost of all materials and labours involved with all leads and lifts etc. complete. | 24 | Rmt | 254.1 | ₹6,098.4 |
| 10 | Itemno 10 :- Filling in plinth and floors murum bedding in trenches with approved murum from excavated materials from foundation in 15 cm to 20 cm layers including watering and compaction, etc. complete. (Bd-A-10/263) | 82.5 | Cum | 101.2 | ₹8,349 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.35 MB
BOQ_2237373.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .