Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 CrAccepted-AOC AGRA ROAD ETA | ETA | ETA | UTTAR PRADESH | ₹3.6 Cr | L1 | Accepted-AOC technically qualified and quoted lowest amount |
| 2 | L2₹3.6 CrRejected-Finance GRAM SAMAISA POST LAKHUN TEHSIL DHAURAHA DISTRICT LAKHIMPUR KHERI UTTAR PRADESH | DHAURAHA | LAKHIMPUR KHERI | UTTAR PRADESH | ₹3.6 Cr | L2 | Rejected-Finance Quoted higher rate than L1 |
| 3 | L3₹3.6 CrRejected-Finance | ₹3.6 Cr | L3 | Rejected-Finance Quoted higher rate than L1 |
| 4 | L4₹3.9 CrRejected-Finance 121004 | ₹3.9 Cr | L4 | Rejected-Finance Quoted higher rate than L1 |
| 5 | L5₹4.0 CrRejected-Finance | ₹4.0 Cr | L5 | Rejected-Finance Quoted higher rate than L1 |
| Sl No | Description | Qty | Unit | M/S KUMAR MANGLAM CONSTRUCTION L4 | M/s SARKAR BAHADUR SINGH L2 | DHARAM DEV CHAUHAN L5 | RAM SANEHI AND SONS L1 | M/S OBELION CONSTRUCTIONS L6 | M/S RAGHVENDRA PRATAP SINGH L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | cleaning thick jungle & thorney bushes without uprooting including cost of all labour and T&P etc upto proper completion of work. | 21,280 | M2 | 1 ₹21,280 Lowest | 5.77 ₹1,22,785.6 | 5 ₹1,06,400 | 10 ₹2,12,800 | 6.7 ₹1,42,576 | 5.7 ₹1,21,296 |
| 2.00 | Earth work in excavation in foundation including of all lead & lift , including manual compaction and proper dressing, and cost of all material, labour , T&P etc upto proper completion of work. | 2,400.1 | M3 | 30 ₹72,003 Lowest | 108.43 ₹2,60,242.84 | 50 ₹1,20,005 | 90 ₹2,16,009 | 126 ₹3,02,412.6 | 107.5 ₹2,58,010.75 |
| 3.00 | Earth work in making base of slope of Left Gomti Bund in River side including of all lead & lift ,manual compaction , proper dressing, cost of all material, labour , T&P etc upto proper completion of work. | 10,944.1 | M3 | 480 ₹52,53,168 | 237.36 ₹25,97,691.58 | 100 ₹10,94,410 Lowest | 150 ₹16,41,615 | 427 ₹46,73,130.7 | 480 ₹52,53,168 |
| 4.00 | Supplying and laying of 40-60 Kg. Mirzapur stone boulders for Pitching slope in river side of Left Gomti bund as per site conditions Including of all lead and lift, cost of all material, labour, T&P etc upto proper completion of work. | 5,026.77 | M3 | 3,200 ₹1,60,85,664 | 3,489.15 ₹1,75,39,154.55 | 4,427.54 ₹2,22,56,225.25 | 3,200 ₹1,60,85,664 | 3,705 ₹1,86,24,182.85 | 3,100 ₹1,55,82,987 Lowest |
| 5.00 | Supplying and Laying of giotextile (sheet) made of 200 GSM woven multifilament polypropylene yarn/nonwoven geosheet as per site conditions Including of all lead and lift, cost of all material, labour, T&P upto proper completion of work. | 18,392 | M2 | 90 ₹16,55,280 | 92.94 ₹17,09,352.48 | 100 ₹18,39,200 | 180 ₹33,10,560 | 105 ₹19,31,160 | 84 ₹15,44,928 Lowest |
| 6.00 | Centering and shuttering for C.C. work including rent of shuttering, cost of all Material,Labour and T&P upto proper completion of work. | 253.01 | M2 | 993 ₹2,51,238.93 | 769.54 ₹1,94,701.32 | 200 ₹50,602 Lowest | 350 ₹88,553.5 | 894 ₹2,26,190.94 | 700 ₹1,77,107 |
| 7.00 | P/L C.C. 1:3:6 with kabrai grit 10-20 mm size and coarse sand including cost of all materials,labour T&p etc and of all lead and lift upto proper completion of work. | 605.3 | M3 | 6,100 ₹36,92,330 | 6,319.22 ₹38,25,023.87 | 5,500 ₹33,29,150 Lowest | 6,000 ₹36,31,800 | 7,343 ₹44,44,717.9 | 6,050 ₹36,62,065 |
| 8.00 | 1st class brick work with 1:4 cement coarse sand mortar including all cost of material,labour and T&P etc and of all lead and lift upto proper completion of work. | 1,723.16 | M3 | 7,044 ₹1,21,37,939.04 | 5,456.2 ₹94,01,905.59 | 6,500 ₹1,12,00,540 | 6,000 ₹1,03,38,960 | 6,339 ₹1,09,23,111.24 | 5,350 ₹92,18,906 Lowest |
Tender Value
₹4.6 Cr
EMD Value
₹9.2 L
Closing Date
30 Apr 2026, 1:00 pmClosed
SE SIX CIRCLE LUCKNOW
SE Six circle lucknow
janpad lucknow me hanuman setu se nishatganj pul ke madhya gomti nadi ke baye bank km 2.600 se km 4.550 ke madhya pr boulder pitching ka karya
2026_UPIDC_1140486_1
06/SE-6/2026-27
Open Tender
Civil Works
Item Rate
180 days
Lucknow
Please refer tender document
2 documents required · 2 mandatory
₹2,714
₹9.2 L
SE Six circle lucknow
3 Aug 2026
23 Apr 2026
30 Apr 2026
23 Apr 2026
30 Apr 2026
23 Apr 2026
24 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | cleaning thick jungle & thorney bushes without uprooting including cost of all labour and T&P etc upto proper completion of work. | - | M2 | - | - |
| 2 | Earth work in excavation in foundation including of all lead & lift , including manual compaction and proper dressing, and cost of all material, labour , T&P etc upto proper completion of work. | - | M3 | - | - |
| 3 | Earth work in making base of slope of Left Gomti Bund in River side including of all lead & lift ,manual compaction , proper dressing, cost of all material, labour , T&P etc upto proper completion of work. | - | M3 | - | - |
| 4 | Supplying and laying of 40-60 Kg. Mirzapur stone boulders for Pitching slope in river side of Left Gomti bund as per site conditions Including of all lead and lift, cost of all material, labour, T&P etc upto proper completion of work. | - | M3 | - | - |
| 5 | Supplying and Laying of giotextile (sheet) made of 200 GSM woven multifilament polypropylene yarn/nonwoven geosheet as per site conditions Including of all lead and lift, cost of all material, labour, T&P upto proper completion of work. | - | M2 | - | - |
| 6 | Centering and shuttering for C.C. work including rent of shuttering, cost of all Material,Labour and T&P upto proper completion of work. | - | M2 | - | - |
| 7 | P/L C.C. 1:3:6 with kabrai grit 10-20 mm size and coarse sand including cost of all materials,labour T&p etc and of all lead and lift upto proper completion of work. | - | M3 | - | - |
| 8 | 1st class brick work with 1:4 cement coarse sand mortar including all cost of material,labour and T&P etc and of all lead and lift upto proper completion of work. | - | M3 | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.18 MB
TenderDocumentlothanuman.pdf
Tender Documents • 1.50 MB
BOQ_2129807.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].