Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.8 LAccepted-AOC | L1 | Accepted-AOC ARP Engineering Contractor L1 Tenderer Accepted | |
| 2 | L2₹7.1 L+₹47,324.50 (7.12%)Rejected-Finance | L2 | Rejected-Finance L2 Tenderer not Accepted | |
| 3 | L3₹7.2 L+₹53,665.50 (8.08%)Rejected-Finance 10 4 D 104 ADDAGUTTA EAST MARREDPALLI SECUNDERABAD HYDERABAD TELANGANA 500026 | HYDERABAD | TELANGANA | 500026 | L3 | Rejected-Finance L3 Tenderer Not Accepted | |
| 4 | L4₹7.3 L+₹60,938.50 (9.17%)Rejected-Finance 4 C 13 SIDCO INDUSTRIAL ESTATE METTUR DAM 636 402 SALEM DT | SALEM | TAMIL NADU | 636402 | L4 | Rejected-Finance L4 Tenderer Not Accepted | |
| 5 | L5₹7.7 L+₹1.0 L (15.5%)Rejected-Finance | L5 | Rejected-Finance L5 Tenderer Not Accepted |
Tender Value
Refer Docs
EMD Value
₹7,000
Closing Date
4 Apr 2025, 2:00 pmClosed
CE/MTPS-II
O/o CE/MTPS-II
Providing cladding arrangement with GI sheet to a length of chainage 60m to 130m on the western side of ESP yard area (Near CPU Building)
2025_EB_534665_1
CE / MTPS-II / SE / Civil / OT.No. 69 / 2024-25.
Open Tender
Civil Works
Works
90 days
MTPS-II- Mettur Dam
Tender Specification
4 documents required · 4 mandatory
₹0
₹7,000
4 Jun 2025
22 Mar 2025
5 Apr 2025
22 Mar 2025
4 Apr 2025
22 Mar 2025
Amount
Dismantling of existing RCC flooring and removal of debris away from the site as directed by Engineer incharge at site including cost of all materials, labour charges, T&P's, lead, lift, etc., complete
Earth work excavation for foundation and depositing on bank with initial lead of 10m and initial lift of 2 m in all types of soil as directed by the Engineer at site, including cost of all labour charges, tools and plants, transport, lead, lift, etc., complete.
Providing PCC 1:4:8 using 40mm HBG metal for foundation as directed by the Engineer at site, including cost of all materials, labour charges, curing, lead, lift, etc., complete.
Providing PCC 1:2:4 using 20 mm HBG metal for foundation as directed by the Engineer at site, including shuttering charges, cost of all materials, labour charges, curing, lead, lift, etc., complete.
Supply, fabrication and placing in position of vertical column posts and inclined struts using ISA 100x100x6 mm, welded with base plate 8mm thick, ISA 25x25x5mm, with vertical posts for fixing the G.I Sheet, the rate includes cost for supply of MS angles, MS base plate and charges for fabrication, aligning, placing in position, erecting the posts, all labour charges, scaffolding charges,welding, bolts and nuts if required, all lead, lift, etc., complete.
Painting the structural steel work with two coats of enamel paint of approved quality and colour over a coat of primer including cost of all materials, labour charges, scaffolding charges, brushes, lead, lift, etc., complete.
Supplying and fixing of Corrugated G.I Sheet of approved quality with necessary screws including cost of all materials, labour charges, scaffolding charges, lead, lift, etc., complete.
CMR ENGINEERING WORKS (BID ID -1284325)
SRINIVASA ENTERPRISES (BID ID -1284376)
metturassociates (BID ID -1284428)
DEIVA CONTRACTOR (BID ID -1282267)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .