| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹1.6 LAWARDED | AWARDED |
Tender Value
₹2.5 L
EMD Value
₹6,275
Closing Date
24 Jun 2025, 10:00 pmClosed
Directorate of Municipal Administration
Construction of compound Wall at indeera canteen premises in navalgund tmc Limit
DMA/2025-26/OW/WORK_INDENT40691
DMA/2025-26/OW/WORK_INDENT40691
Open
Other Works
Electronic Documents, First(One Cover)
DMA Town Municipal Council Navalgunda
₹500
₹6,275
9 Jun 2025
9 Jun 2025
23 Jun 2025
16 Jun 2025
Construction of compound Wall at indeera canteen premises in navalgund tmc Limit
Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per dr...
Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work as per MoRT&H : IRC 301
Providing and Filling in foundation with granite / trap broken metal 100mm. And down size & with approved sand including hand packing, ramming, watering, including cost of all materials and labour wit...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
Precast Compound wall Providing and fixing factory made M20 Grade Cement Concrete Precast Boundary Compound wall of size 2100mm (L) x300mm (B)x50mm (D) with Panel weight approximately 77kg and panels ...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Addittion for FormWork, centering & Scaffolding for substructres works (Foundation 8% ) including cost and conveyance of all materials, labour, hirecharges of machineries and equipment, lead and lift,...
Addittion for FormWork, centering & Scaffolding for substructres works (RCC Columns / Shaft (Slip Centering) 70% ) including cost and conveyance of all materials, labour, hirecharges of machineries an...
Addittion for FormWork, centering & Scaffolding for substructres works (Plinth Beams of Buildings) 50% ) including cost and conveyance of all materials, labour, hirecharges of machineries and equipmen...
Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coarse aggregates and fine agg...
Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel et...
Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint ...
Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90L/10 m² over an under coat of primer applied @ 0.80 L/10 m² of approved brand and manufacture includ...
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .