| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹75.7 LAccepted-AOC PLOT NO 13 SAPANA ORCHARD BETHORA ROAD CURTI PONDA GOA 403401 | SOUTH GOA | GOA | 403401 | ₹75.7 L | L1 | Accepted-AOC As per criteria lowest bidder accepted |
| 2 | L2₹75.7 LRejected-Finance H NO 2128 BH SATOSKAR BUILDING DESSAI NAGAR SANQUELIM BICHOLIM GOA | NORTH GOA | GOA | 403001 | ₹75.7 L | L2 | Rejected-Finance REJECTED BASED ON EVALUATION OF TENDER |
| 3 | L3₹75.7 LRejected-Finance H NO 368 ZUAREM TUEM PERNEM GOA | ₹75.7 L | L3 | Rejected-Finance REJECTED BASED ON EVALUATION OF TENDER |
| 4 | L4₹75.7 LRejected-Finance | ₹75.7 L | L4 | Rejected-Finance REJECTED BASED ON EVALUATION OF TENDER |
| 5 | L5₹75.8 LRejected-Finance | ₹75.8 L | L5 | Rejected-Finance REJECTED BASED ON EVALUATION OF TENDER |
| Sl No | Description | Qty | Unit | SAIBINI CONSTRUCTION L1 | RAHUL CONSTRUCTION L2 | Shri C K Abdul Jaleel L2 | M/S SAMARTH CONSTRUCTIONS L2 | M/S DOUBLE CENTURY CONSTRUCTIONS L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Clearing jungle up rooting of rank vegetation grass bush wood trees and sapling of girth upto 30cm. Measured at a height of 1mt. Above ground level and removal of rubbish upto a distance of 50mt. Outside the periphery of the area cleared. (if however, only grass is met with the area will be measured and paid for item 4001. | 1,576 | Sq.M | 8.75 ₹13,790 | 8.8 ₹13,868.80 | 9.2 ₹14,499.20 | 8.63 ₹13,600.88 | 9.2 ₹14,499.20 |
| 2.00 | Earthwork in excavation by mechanical/ manual means type of strata comprising any of the materials such as soil, sand, clay, gravel, moorum of all varieties, shingles, pebbles, all type of conglamerates, laterite rock, soft rock, ordinary rock, disintegrated or weathered rock, fissured/shattered, decomposed rock, and all such other materials either in full or in parts as the case may be adopting any approved method or methods as may be convient or permitted, inclusive of chiselling, wedging etc. but blasting prohibited in all conditions such as dry, moist, saturated, submerged, foul conditions etc. including pumping or bailing out water/ dewatering, including setting out construction of shoring, strutting including removal of stumps and other deleterious matter, dressing of sides and bottom, providing barricading, danger lighting, guarding etc. and backfilling the excavated earth to the extent required and disposal of excavated stuff in specified areas with all leads and lifts etc. and as directed by Engineer-in-charge etc. all complete. | 409.37 | Cu.M | 250.25 ₹1.0 L | 388.03 ₹1.6 L | 263.12 ₹1.1 L | 246.68 ₹1.0 L | 263.12 ₹1.1 L |
| 3.00 | Supplying jamba wooden bally piles 150 mm mean diameter cut to length required (not exceeding 9 meters) and planted in position ready for driving: (a) Upto 2.50 metre long pile. | 157.5 | Mts. | 168 ₹26,460 | 275 ₹43,312.50 | 176.64 ₹27,820.80 | 165.6 ₹26,082 | 176.64 ₹27,820.80 |
| 4.00 | Driving down wooden piles of 150mm diameter either in vertical or battered work to approved lines and level through various strata including arranging all the appliances necessary for pile driving complete at site (portion in ground only to be measured) (a) Upto 2.50 metre long pile. | 144.9 | Mts. | 266.88 ₹38,670.91 | 435 ₹63,031.50 | 280.6 ₹40,658.94 | 263.07 ₹38,118.84 | 280.6 ₹40,658.94 |
| 5.00 | Centering and shuttering including struttings, propping etc. and removal of formwork for (a) Foundation, footings, bases for columns and mass concrete. | 821.84 | Sq.M | 356.13 ₹2.9 L | 585.06 ₹4.8 L | 374.44 ₹3.1 L | 351.04 ₹2.9 L | 374.44 ₹3.1 L |
| 6.00 | Providing & laying cement concrete 1: 1.5: 3 (1 cement: 1.5 coarse sand: 3 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: All works upto plinth level. | 14.16 | Cu.M | 6,380.5 ₹90,347.88 | 10,482.25 ₹1.5 L | 6,708.64 ₹94,994.34 | 6,289.35 ₹89,057.20 | 6,708.64 ₹94,994.34 |
| 7.00 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: (a) All works upto plinth level. | 392.33 | Cu.M | 5,958.75 ₹23.4 L | 5,873.63 ₹23.0 L | 6,265.2 ₹24.6 L | 6,895.86 ₹27.1 L | 6,265.2 ₹24.6 L |
| 8.00 | Laterite boulder masonry in cement concrete1:3:6 (1cement, 3 coarse sand:6 graded stone aggregate of 20mm nominal size) in foundation | 372.45 | Cu.M | 4,666.5 ₹17.4 L | 3,769.13 ₹14.0 L | 4,020.4 ₹15.0 L | 3,769.13 ₹14.0 L | 4,020.4 ₹15.0 L |
| 9.00 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 425.74 | Cu.M | 1,934.63 ₹8.2 L | 1,906.99 ₹8.1 L | 2,034.12 ₹8.7 L | 1,906.99 ₹8.1 L | 2,034.12 ₹8.7 L |
| 10.00 | Earthwork in Embankment with approved earth (Contractor earth)/moorum including spreading the earth in layers not exceeding 250mm. in depth, breaking clods, rolling each layer with half ton roller or wooden or steel hammer including filling up ground depression, dressing etc. complete with all lead and lift and as directed by Engineer-in-Charge. | 1,893.76 | Cu.M | 463.75 ₹8.8 L | 457.13 ₹8.7 L | 487.6 ₹9.2 L | 457.13 ₹8.7 L | 487.6 ₹9.2 L |
Tender Value
₹94.7 L
EMD Value
₹1.9 L
Closing Date
22 Apr 2025, 4:00 pmClosed
EE, SCD
SOIL CONSERVATION DIVISION DIRECTOR OF AGRICULTURE KRISHI BHAVAN TONCA CARANZALEM GOA.
STRENGTHENING TO THE BUND TALAYCHE KHAVTE AT AMONA IN BICHOLIM TALUKA
2025_DAG_21435_1
STRENGTHENING TO THE BUND TALAYCHE KHAVTE AT AMONA IN BICHOLIM TALUKA
Open Tender
Civil Works
180 days
AMONA BICHOLIM TALUKA
Please refer Tender documents.
2 documents required · 2 mandatory
₹8,000
₹1.9 L
Yes
27 Jan 2026
4 Apr 2025
24 Apr 2025
8 Apr 2025
22 Apr 2025
15 Apr 2025
Amount
Clearing jungle up rooting of rank vegetation grass bush wood trees and sapling of girth upto 30cm. Measured at a height of 1mt. Above ground level and removal of rubbish upto a distance of 50mt. Outside the periphery of the area cleared. (if however, only grass is met with the area will be measured and paid for item 4001.
Earthwork in excavation by mechanical/ manual means type of strata comprising any of the materials such as soil, sand, clay, gravel, moorum of all varieties, shingles, pebbles, all type of conglamerates, laterite rock, soft rock, ordinary rock, disintegrated or weathered rock, fissured/shattered, decomposed rock, and all such other materials either in full or in parts as the case may be adopting any approved method or methods as may be convient or permitted, inclusive of chiselling, wedging etc. but blasting prohibited in all conditions such as dry, moist, saturated, submerged, foul conditions etc. including pumping or bailing out water/ dewatering, including setting out construction of shoring, strutting including removal of stumps and other deleterious matter, dressing of sides and bottom, providing barricading, danger lighting, guarding etc. and backfilling the excavated earth to the extent required and disposal of excavated stuff in specified areas with all leads and lifts etc. and as directed by Engineer-in-charge etc. all complete.
Supplying jamba wooden bally piles 150 mm mean diameter cut to length required (not exceeding 9 meters) and planted in position ready for driving: (a) Upto 2.50 metre long pile.
Driving down wooden piles of 150mm diameter either in vertical or battered work to approved lines and level through various strata including arranging all the appliances necessary for pile driving complete at site (portion in ground only to be measured) (a) Upto 2.50 metre long pile.
Centering and shuttering including struttings, propping etc. and removal of formwork for (a) Foundation, footings, bases for columns and mass concrete.
Providing & laying cement concrete 1: 1.5: 3 (1 cement: 1.5 coarse sand: 3 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: All works upto plinth level.
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: (a) All works upto plinth level.
Laterite boulder masonry in cement concrete1:3:6 (1cement, 3 coarse sand:6 graded stone aggregate of 20mm nominal size) in foundation
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
Earthwork in Embankment with approved earth (Contractor earth)/moorum including spreading the earth in layers not exceeding 250mm. in depth, breaking clods, rolling each layer with half ton roller or wooden or steel hammer including filling up ground depression, dressing etc. complete with all lead and lift and as directed by Engineer-in-Charge.
18mm cement plaster in two coats under layer 12mm thick cement plaster 1:5 ( 1 cement : 5 coarse sand) and top layer 6mm thick with cement plaster 1: 3 (1 cement : 3 coarse sand) finished with sponge.
Providing woodwork in frames of doors, windows, clerestory windows trusses & other frames wrought framed and fixed in positon. (d) Second class matti wood.
Painting 2 coats with oil type wood preservative of approved brand & manufacture on new work.
Shri C K Abdul Jaleel (BID ID -47125)
M/S SAMARTH CONSTRUCTIONS (BID ID -47379)
M/S DOUBLE CENTURY CONSTRUCTIONS (BID ID -47413)
RAHUL CONSTRUCTION (BID ID -47415)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid