Superintending Engineer, PR Region Warangal
ZP complex Warangal
Construction of Plastic Waste Management Unit near Segregation shed at Wardhannapet MPDO Office of Wardhannapet (M) in Warangal District Est cost Rs.,40.00 lakhs
739064
03/SBM/2026-27 1st call Dt.25.06.2026 of SE PR Region Warangal
OPEN
Buildings
WARANGAL RURAL
10 documents required · 10 mandatory
₹1,121
₹31,661
3 Oct 2026
3 Oct 2026
3 Oct 2026
Construction of Plastic Waste Management Unit near Segregation shed at Wardhannapet MPDO Office of Wardhannapet (M) in Warangal -Earth work excavation and depositing on bank with an initial lead of 10Mts & lift of 2Mtrs along the road as directed by Engineer- incharge with all leads & lifts in all soils like B.C. soils, red earth and ordinary gravel etc., complete.
Plain cement Concrete 1:4:8 prop. (Cement : fine aggregate coarse aggregate for foundation and under flooring bed using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all meterials like cement, sand coarse aggregate water etc., to site mixing seigniorage charges on all materials, Turn aver tax labour charges for laying concrete in foundation ramming in 15 cm layer finishing top surface to the required level curing etc., complete for finished item of work as per (SS No.402)
Plain Cement concrete (1:5:10) using 40 mm metal with Concrete mixture. using 40mm size HBG (SS5) metal from approved quarry including cost and conveyance of all materials like cement, 50% sand+50% Rock Sand , coarse aggregate, water etc. to site, including seigniorage charges, Countryes & other taxes on all materials, all operational, incidental, and labor charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations and Flooring Bed (APSS No. 402) All work upto plinth level.
RR Masonry in CM (1:6) Cement: Sand) using hard granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, 50% sand +50% Rock Sand, water, etc., to site including seigniorage charges, Countryes & other taxes on all materials, all operational, incidental, and labor charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for finished item of work for foundation and basement (APSS No. 601 & 615)
RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, 50% Sand +50% Rock sand of Concrete coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering -Footings
RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, 50% Sand +50% Rock sand of Concrete coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering-Pedestal
RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, 50% Sand +50% Rock sand of Concrete coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering -Plinth Beam
RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, 50% Sand +50% Rock sand of Concrete coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering.-Columns
RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, 50% Sand +50% Rock sand of Concrete coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering. -oof Beam
Providing HYSD / TMT steel bars (Fe 500 / Fe550 Grade as per IS 1786 to 1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in positions with cover blocks of approved materials and size and tying and lapse splicings with binding wire of 18 guage forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as over lapse, coupling, chairs, spacer bars, including cost and conveyance of binding wires, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying excluding tanes like GST on all materials etc., complete foer finished item of work in all floors(APDSS No.126). For bars 36mm dia for reinforcement (APDSS No.126)
Supply and filling of useful available excavated earth in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310) including cost and conveyance of all material and labour charges,and contractors profit & over heads but excluding seignorage charges and GST etc., complete.
Supply and filling with carted gravel in pipe line trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. including cost and conveyance of all materials and labour charges, and contractors profit & over heads but excluding seigniorage charges & taxes like GST etc. ,complete. (APDSS NO. 309 & 310) as directed by the H.M.W.S.&.S. Board Engineers.
Supply, fabrication & erection of Mild Steel & Structural steel for Base Plates, Columns, Rafters, Beams and Purlins (Z type & C type) as directed by the Engineer-in-Charge including Labour charges for fabricating all heavy steel works, cost of welding rods, power charges, Labour charges for fixing & erecting in position and fixing by using chain pulley blocks, Derek pole arrangements and cranes etc., complete
Supplying and fixing iron Gusset plate 12mm M.S including cost and conveyance of all materials and fixing in position fabrication charges etc., complete as per specification.
Roofing will be provided with 0.5mm thick galvanized / pre painted G.l. profiled sheets fixed to the purlins with 14 size self drilling screws with neoprene washer. Side laps are stitched with self tapping / dril ling screws. End laps are to be sealed with 25x3 mm Buty1 tape. The sheets are provided with anti capillary grove
Brick masonary in CM ( 1:6) with 2nd class bricks traditional size 23x11x7 cm including c/c of all material and water to work at site cost of seigniorage charges and all operational incidental, labour charges such as scaffolding, mixing mortar lift charges curing etc complete for finished item of work.
Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904) - Internal walls
Plastering to brick masonary wall with 20mm thick double coat in CM (1:6) 16 mm thick base coat and CM (1:4) of 4mm thick top coat with dubara sponge finish including cost and conveyance of all material and labour charges, over heads & contractor profit, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, but excluding GST and seignorage charges, etc., complete for for finished item of work. (APSS 901,903 & 904) (CSSR) for outer Walls.
Painting to new walls with 2 coats of acrylic Emulsion Paint nterior premium grade Asian/ Berger/ Nerolac/ Saicoat/Indocem or Equivalent and shade over Priming Coat with Cement Primer Waterbase Interior Gr- 1 Asian/ Berger/ Nerolac/ Saicoat/Indocem or Equivalenton New Plastered Surfaceafter thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges but excluding GST etc, complete for finished item of work as per SS 911 for internal walls
Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all dirt abd remains if loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., complete for finished item of work as per SS 911 for external walls
Supply & fixing of Rolling shutter made of 80 x I .25 mm machine rolled CRCA laths, interlocked together through their entire length and jointed together at the ends by end-locks, mounted on specially designed pipe shaft of 50mm Diameter nominal bore MS B class pipe with brackets, plates, guide channels, stoppers, bottom locking plates and arrangements for inside & outside locking with push-pull operations including cost of hood cover and springs complete, painted with one coat or approved steel primer, locks, ball bearings, all accessories etc complete for finished item of work as per special Spec: 1108/ Grill Door
Supply of Hot dipped Galvanized Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-1979: 2"x2" (50mm x 50 mm) - 8 Gauge (TBSC-E.II-040)
Flooring with 100mm thick Cement Concrete 1:4:8, using 40mm metal, 100mm thick and 20 mm Cement Concrete surface (Ellies Pattern, 1st Sort)
Electrification -Wiring with run of 2 of 14/0.3mm (1.0 Sq.mm) FR / FRLS PVC insulated flexible ISI mark copper cable ( 100V grade as perIS:694/1990 ) of KEI / Polycab / Havells / GM / Million / HPL / Gold Medal / Power Flex / RPG / Anchor / Great White / Sun Cab / Fortune Art make in existing pipe with 6A 1 Way flush type Swich of makes GM G Home / Gold Medal Olive / Million Zoom / Anchor Penta Cherry / Great white Omega, Ceiling rose 3 Plate of makes Anchor / Gold Medal Olive / Million Zoom. and Supply of Decolam Board of Size 8" x 10" as switch control box including cost and conveyance of all material and all labour charges but excluding VAT etc., complete for light, bell, fan and exhaust fan points including cost and conveyance of all material and labour charges but excluding VAT.
Supply and Fixing of 16A 3pin and 6A 3pin plug socket with indicator lamp and 16A fuse unit and 16A switch control (5 in 1) duly recessed in wall with wooden deep box of 6" x8" x2 1/2" size covered with hylam sheet including earth connections and all labour charges etc., complete.
Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) and 1 of 22/0.3mm (1.5 Sqmm) F.R.L.S P.V.C. insulated flexible copper cable of Makes : Finolex / RR kabel / Havells in existing pipe for mains inlcuding all labour charges etc., complete.
Supply and fixing of Anchor / Gold Medal Olive / Million Zoom make ISI mark batten holder / slanting holder in lieu of ceiling rose of light point complete with all connections and all labour charges with 9.0W LED Lamp (for new installation ) including cost and conveyance of all material and labour charges but excluding VAT.
Supply and transportation of 22W 2300 lumens, 1200mm length LED tube light, housing made with alluminium anodised body, wide operating voltage with double side connection, PF≥0.9, Surge protection: > 2KV, THD<15%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department and as per IS specifications, minimum CRI≥80,.etc complete with 50000 Burning hours with BIS Certification.LUMINAIRE MAKE: Phillips / OSRAM / Wipro / Crompton / Bajaj / Havells / Jaquar / Panasonic / Halonix / HPL / Eveready / Surya / Keselec / Arraystorm / GM / Goldmedal / Goldwyn / Fortune Arrt / Lighting Technologies . LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.
Supply and fixing 4 Way SPN DB with IP 20 Protection as per IS:13032 and suitable for 4Nos S.P out goings and for 1 No Incommer etc complete of makes Legrand / Schneider. with IP-20 protection suitable for single phase 40A DP Isolator of make Legrand / Schneider. as incomer and 6-32A 10KA TP MCB, C/D Curve ISI Mark of make Legrand / Schneider as out going including internal connection and labour charges for surface / flush mounting etc., complete. including cost and conveyance of all material, all labour charges, and contractor profit etc., complete but excluding VAT.
Supply, Transportation and Fixing of 1200mm (48") Sweep ISI mark Ceiling Fan as per IS 374 - 1979 and, with double ball bearings but without Regulator of makes Crompton / Bajaj Kassels 50 / Usha atom make with all standard accessories but without regulator including all labour charges etc., complete including cost and conveyance of all material and labour charges but excluding VAT.
Supply, Transportation and Fixing of 9" (225mm), Light duty exhaust fan with double ball bearing and wire guard etc complete of makes Crompton / Bajaj Bahar WG / Havells Ventil Air-DS / Orient hill air. Make exhaust / Fresh Air fan with metallic body and blades including making hole in wall and masonary work and all labour charges etc. including cost and conveyance of all material and labour charges but excluding VAT.
Toilet Block -Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 2m in Loamy & Clayey Soils like BC Soils, Red Earth & Ordinary Gravelly Soils ( SS 20-B) including shoring, strutting, sheeting, planking and dewatering including cost of hire charges of T & P, labor charges etc., complete for finished item of work for Foundation of Building. (APSS No. 308)
Plain Cement Concrete corresponding to M5 grade as per IS 456 equivalent to (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG (SS5) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, Excluding seigniorage charges,Including, Countryes & other taxes on all materials, all operational, incidental, and labor charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations and Flooring Bed (APSS No. 402)
Random Rubble stone masonry, in CM (1:6) prop: (Cement: Sand) using hard granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site Excluding seigniorage charges,Including, Countryes & other taxes on all materials, all operational, incidental, and labor charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for finished item of work for foundation and basement (APSS No. 601 & 615) in GROUND FLOOR
Supply and filling of gravel in basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310) including cost and conveyance of all material and labour charges, and contractors profit & over heads but excluding seignorage charges and GST etc., complete.
Vibrated reinforced cement concrete corresponding M20 grade as per IS 456 equivalent to (1:1.5:3) prop: nominal mix (Cement: fine aggregate: coarse aggregate using 20mm size HBG (SS5) machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc. to site Excluding seigniorage charges,Including, Countryes & other taxes on all materials, all operational, incidental, and labor charges such as centering, shuttering, scaffolding, lift charges, machine mixing, laying concrete, vibrating, curing concrete etc, complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402 & 403) Roof Slab 125mm thick
Plain Cement Concrete corresponding to M10 grade as per IS 456 equivalent to (1:3:6) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG (SS5) metal from from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, Excluding seigniorage charges,Including, Countryes & other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete, etc., complete for finished item of work for Bed Blocks and Hold Fasts (APSS No. 402)
Brick Masonry in superstructure with CM (1:6) prop: using second class bricks from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, Countryes & other taxes on all materials, all operational, incidental and labor charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, including contractor profit etc., complete for finished item of work. (APSS No. 501 & 504) of AP Revised data BLD -CSTN- 5-4
Providing impervious coat over RCC roof slab to required slopes with CM (1:3) prop. 20 mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift charges, etc., complete for finished item of work (APSS No. 901 & 903).
Plastering 12mm thick in singl coat with in CM (1:4) including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, Countryes & other taxes on all materials, all operational, incidental and labor charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing,including contractor profit etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904) For Internal walls
Plastering 20 mm thick in two coats with base coat of 16 mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, Countryes & other taxes on all materials, all operational, incidental and labor charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904) For External walls
Painting to new walls with 2 coats of acrylic Emulsion Paint nterior premium grade Asian/ Berger/ Nerolac/ Saicoat/Indocem or Equivalent and shade over Priming Coat with Cement Primer Waterbase Interior Gr- 1 Asian/ Berger/ Nerolac/ Saicoat/Indocem or Equivalenton New Plastered Surfaceafter thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges but excluding GST etc, complete for finished item of work as per SS 911 for internal walls
Painting to new walls with 2 coats of Plastic Emulsion Paint Asian/ Berger/ Nerolac/ Saicoat/Indocem or Equivalent and shade over Priming Coat with Cement Primer Waterbase Interior Gr- 1 Asian/ Berger/ Nerolac/ Saicoat/Indocem or Equivalenton New Plastered Surfaceafter thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges but excluding GST etc, complete for finished item of work as per SS 912 for External walls.
Flooring with Non-skid red or white full body Ceramicfloor tiles of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 of any colour and finish in all shades and designsand set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including etc., complete for finished item of work, but excluding the cost of conveyance of all materials.
Dadooing to walls with white glazed tiles 1st. quality of any size of brand as approved by Engineer - in - charge and set over a base coat of CM (1:5), 12mm thick and neat cement paste at the rate of 3.3 Kg/Sqmt. and jointed with white cement paste mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, etc. to site, seigniorage charges, sales and other taxes on all materials, C921 such as mixing of cement mortar, laying in position, curing, lift charges etc., complete for finished item of work (APSS No.701 & 707)
Supply and fixing of Door With WPC and shutter including fixing of of M.S. Hold fasts, 150mm long Mild steel (PC) Butt Hinges, 2 Nos. of 150mm long Alluminium Door Handles, 2No of 300mm long Alluminium Aldrop including cost and conveyance of all materials and labour charges etc., complete.
Providing high yield strength deformed (HYSD) steel bars (Fe 415 grade as per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and Countryes & other taxes,on cost of all materials complete for finished item of work (APSS No.126) in all floors.
Fencing -Earthwork work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, labour charges such as shoring sheeting, planking, strutting, etc,. Complete for finished item of work including seigniorage excluding dewatring charges etc., as per SS-20B (APSS308)
Plain Cement Concrete of (1:4:8:) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG M/c (SS5) metal with concrete mixture including cost and conveyance of all materials like cement, sand(unscreened), coarse aggregate, water etc. to site, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, overhead charges & Contractors profit etc., complete but excluding GST & seigniorage charges, sales & other taxes on all materials,for finished item of work for Foundations (APSS No. 402).
Supply and fixing of RCC Precasted poles of 1.80 mts long including transporting, laying,fixing,labour charges etc., complete.
Hot dipped Galvanized Iron Chain link mesh 8gauge - (4.0 mm) as per IS: 2721-1979: 4"x4" (102mm x 102 mm) - 8 Gauge
Water supply & sanitary items -Supply and Fixing of CPVC Pipes ( 22.20mm OD Pipe - SDR 13.5 )and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" SDR 11 and SDR 13.5 pipes are made from idential CPVC compounds having the same physical Properties for Hot and Cold Water (IS 15778:2007) of Ashirvad / Ajay Flowguard including cost and conveyance of all material, labour charges, and over heads but excuding VAT.
Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks
S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal / external threaded connection conforming to IS 8931
Supply and fixing of 3" (76.2 mm ) Nahany Trap with Jali - UPVC/SWR Pipe fittings (Prince/Sudhakar or any ISI Brand) including cost and conveyance of all materials and labour charges etc., complete for All Floors. including cost and conveyance of all materials and all incidental and operational, labour charges, lift charges, but excluding seignorage charges and VAT etc., complete for finished item of work. (A.P.S.S. No. 1325).
Supplying & Fixing Orissa Pan white glazed W.C 1st quality ISI marked conforming to IS:2556-Part-3-1981 with "P" or "S" trap Hindware/ Parryware/Neycer - ISI Mark: 580 mm x 440 mm
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ Wardhannapet PWMU.xlsx
TENDER_DOCUMENT • 0.09 MB
Schedule Wardhannapet PWMU.xlsx
TENDER_DOCUMENT • 0.07 MB
Wardhannapet PWMU SBD Doc.doc
TENDER_DOCUMENT • 0.62 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .