| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹130.6 CrAccepted-AOC 286 2 PARAG STATION ROAD BUDHWAR PETH KARAD SATARA | PUNE | MAHARASHTRA | 412206 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹135.9 Cr+₹5.3 Cr (4.05%)Rejected-Finance 401 501 HARSH ANAND YEOLEKAR MALA COLLEGE ROAD NASHIK 422005 | NASHIK | NASHIK | MAHARASHTRA | 422005 | L2 | Rejected-Finance L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical Disqualified | |
| 4 | Rejected-Technical | - | Rejected-Technical Disqualified |
Tender Value
₹125.1 Cr
EMD Value
₹62.3 L
Closing Date
31 Oct 2023, 5:30 pmClosed
Executive Engineer, P W Dn Kolhapur
Near Head Post Office, Ramanmala Tarabai Park, Kolhapur
PROPOSED CONSTRUCTION OF CHHATRAPATI SHAHU MAHARAJ RESEARCH, TRAINING and HUMAN DEVELOPMENT INSTITUTE (SARTHI) SUB CENTRE, KOLHAPUR (INCLUDING ELECTRICAL WORK)
2023_PWDRP_948095_1
63 for 2023-24 (B2) (OPEN) (SARATHI)
Open Tender
Civil Works
Item Rate
900 days
Works
Please refer Tender documents.
7 documents required · 7 mandatory
₹7,100
₹62.3 L
Chief Engineer, P W Region, Pune
1 Apr 2024
26 Sept 2023
2 Nov 2023
26 Sept 2023
31 Oct 2023
26 Sept 2023
10 Oct 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removing grass, gazer grass and disposing off out of building premises including making clean the ground by shovel and phavaras excetra. complete. | 24,185.7 | Square Meter | - | - |
| 2 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 meter. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramillimetering, watering including shoring and strutting excetra. complete. (Lift upto 1.5 meter.) By Mechanical Means | 11,346.83 | Cubic Meter | - | - |
| 3 | Excavation for foundation in earth, soils of all types, sand,gravel and soft murum, including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramillimetering, watering including shoring and strutting excetra. complete. (Lift from 1.5meter to 3.0meter) By Mechanical Means | 3,591.54 | Cubic Meter | - | - |
| 4 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramillimetering, watering including shoring and strutting excetra. complete. (Lift upto 1.50 meter) By Mechanical Means | 1,788.03 | Cubic Meter | - | - |
| 5 | Excavation for foundation in Hard murum and boulders including removing the excavated material upto a distance of 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramillimetering, watering including shoring and strutting excetra. complete. (Lift from 1.5 meter to 3.0 meter.) By Mechanical Means | 3,704.88 | Cubic Meter | - | - |
| 6 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramillimetering ,watering including shoring and strutting excetra. complete. (Lift from 1.5meter To 3.0 meter.) By Mechanical Means | 544.7 | Cubic Meter | - | - |
| 7 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramillimetering ,watering including shoring and strutting excetra. complete. (Lift from 3.0meter To 4.5 meter.) By Mechanical Means | 1,171.73 | Cubic Meter | - | - |
| 8 | Excavation for foundation in Hard-rock by blasting including trimillimetering and leveling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres from the building area including dewatering and back filling with available earth/murum watering, ramillimetering excetra. complete. (Lift from 1.5meter To 3.0 meter) By Mechanical Means | 363.13 | Cubic Meter | - | - |
| 9 | Excavation for foundation in Hard-rock by blasting including trimillimetering and leveling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres from the building area including dewatering and back filling with available earth/murum watering, ramillimetering excetra. complete. (Lift from 3 meter To 4.5meter) By Mechanical Means | 946.63 | Cubic Meter | - | - |
| 10 | Excavation for foundation in Hard-rock by blasting including trimillimetering and leveling the bed by chiselling where necessary and removing the excavated material and stacking it in measurable heaps within a distance of 50 metres from the building area including dewatering and back filling with available earth/murum watering, ramillimetering excetra. complete. (Lift from 4.5 meter To 6 meter) By Mechanical Means | 845.55 | Cubic Meter | - | - |
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1652283.xls
BOQ Document • 1.24 MB
130133644.pdf
Tender Document • 1.26 MB
63SARATHIFORM.pdf
Tender Document • 11.37 MB
SARATHI-C.pdf
Tender Document • 1.25 MB
130133646.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .