Loading…
Loading…
Tender Value
₹1.4 Cr
EMD Value
₹6.8 L
Closing Date
9 Sept 2026, 2:30 pm4d left
Chief Engineer
GDA Office, Taramandal, Gorakhpur.
Please refer Tender documents.
2026_GORDA_1180084_1
25/GDA/2026-27/24082026
Open Limited
Civil Works
Fixed-rate
180 days
PAC Camp, Bichhiya
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
₹6.8 L
27 Aug 2026
27 Aug 2026
9 Sept 2026
27 Aug 2026
9 Sept 2026
27 Aug 2026
27 Aug 2026 - 9 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.(DSR-2.80) | 503.1 | Cum | 198.47 | ₹99,850.26 |
| - | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:(DSR-4.1) | - | - | - | - |
| 2.01 | 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)(DSR-4.1.8) | 68.8 | Cum | 5,193.95 | ₹3,57,343.76 |
| - | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: | - | - | - | - |
| - | All work upto plinth level: Concrete of M25 grade with minimum cement content of 300 kg /cum (DSR-5.33.1.1) | 280.55 | Cum | 7,247.15 | ₹20,33,187.93 |
| - | All work above plinth level upto v floor: Concrete of M25 grade with minimum cement content of 300 kg /cum (DSR-5.33.2.1) | 34.34 | Cum | 7,518.3 | ₹2,58,178.42 |
| 4Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete DSR-5.22.6 | |||||
| - | Thermo-Mechanically Treated bars of grade Fe-500D or more. | 0.36 | Qtl. | 8,223.2 | ₹2,960.27 |
| - | Centering and shuttering including strutting, propping etc. and removal of form for | - | - | - | - |
| - | Foundations, footings, bases of columns, etc. for mass concrete (DSR-5.9.1) | 1,032 | Sqm | 299 | ₹3,08,568 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
document2501.pdf
Tender Documents • 4.22 MB
BOQ_2219119.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .