| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.5 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹39.8 L+₹34,000 (0.86%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹40.0 L+₹50,000 (1.27%)Rejected-Finance 0 0 0 NEAR DAK BUNGLOW NH 1 A NH 1A UDHAMPUR UDHAMPUR JAMMU KASHMIR 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | L3 | Rejected-Finance L3 | |
| 4 | L4₹41.5 L+₹2.0 L (5.17%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹42.4 L+₹3.0 L (7.48%)Rejected-Finance | L5 | Rejected-Finance L5 |
Tender Value
₹44 L
EMD Value
₹1.3 L
Closing Date
24 Oct 2024, 2:00 pmClosed
office of the xen jal shakti mech div north jmu
office of the xen jal shakti mech div north jmu
Providing, Installation, testing and commissioning of 50000 GPH x 250 M head HC pump set of Lohar unit No. 1 and other allied works at CPS Sitlee under UT Capex Budget
2024_PHE_259565_1
e nit no. 164 of 2024-25
Open Tender
Repair and Maintenance Works
Item Rate
90 days
sitlee
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
xen jal shakti phe mech div north jmu
₹1.3 L
office of the xen jal shakti mech div north jmu
7 Nov 2024
11 Oct 2024
25 Oct 2024
11 Oct 2024
24 Oct 2024
17 Oct 2024
15 Oct 2024
Amount
Providing ,Installation, testing and commissioning of 50000 GPH X250 M Head HC multistage pump set of Lohar unit-1 coupled with suitable Prime mover and other allied works at CPS Sitlee. Dismantling of old existing machinery installed by way of dismounting of pump, motor, ATS Panel, ACB Panel, cables, suction and delivery pipe, valves etc from installed position by way of opening of the nut bolts from the suction and delivery ends, bolts of pump, motor and dismantling of coupling pulley set. Dismantling of old suction bend and delivery bend including sluice valve and shifting of material and stacking to the store or safer place. Providing/ fabrication of MS blind for suction and delivery of required dia to stop the in-flow of water. Extracting of existing base plate of dismantled pumping unit with the help of gas cutter, grinding of the upper surface of the base frame. Extraction of the existing base frame from the foundation block with help of jack hammer, chisel and manual labour. Chipping of concrete and cutting of concrete block mesh with help of angular cutter, chisel, jack hammer and other tools and tackles required for excavation of block up to desired level and disposal of excavated material from pump room. Laying of concrete with 1:2:4 with suitable reinforcement and leveling of base frame/ base plate. Fitting of new base frame on the existing frame and leveling it both longitudinally as well as horizontally to avoid vibration of the unit on full load running condition. Complete job including cost of material and labour charges Shifting of pumping unit from its stacking point to laid base frame with the help of crane and skilled labour. Mounting of new pumping unit on base frame, leveling of the unit properly aligning with coupling of pump and motor with proper fitting of coupling bolts with bushes and fitting of foot bolt of pump and motor. The work shall be carried by skilled labour and every care should be taken to avoid any damage to pumping machinery. Providing, laying and fitting of M.S pipe of 200 mm/250 mm dia. for suction and delivery as per site requirement. Providing, fitting and welding of suitable size M.S flanges- quantity as per requirement. Fabricating, providing and fitting of M.S bends as per requirement at site. Providing and fitting of cast steel sluice valves 200 mm /250 mm dia on suction and delivery side- one no. each, cast steel non return valve of 200 mm/250 mm dia.-01 no. on delivery side conforming to IS specification. Painting of newly laid suction and delivery pipes by way of making the smooth surface by using emery paper and then painting with metal primer/red oxide and two coats of super enamel. Design/Providing/Fitting/Testing and commissioning of ATS Panel and ACB Panel as per the specification of motor along with single core copper cable 300 mm2 75 mtrs as detailed a) 3 lead with proper thimbling (3x1) from motor to ATS =15x3=45mtrs. b) 3lead with proper thimbling (3x1) from ATS to ACB Panel =10x3=30mtrs Testing and commissioning of complete unit on no load and full load. Complete job includes the cost of material, labour charges, etc.
Major Electricals (BID ID -2180942)
Shivam enterprises (BID ID -2181699)
PARAMOUNT INTERNATIONAL (BID ID -2179516)
BHARTIYA ENGINEERS (BID ID -2181341)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .