Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Others-As per Nit Condition name of work and Tender ID must be written on the EMD. Hence Rejected |
| 2 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Others-Some Documents Uploaded by the bidder are blurred and not clearly legible. |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Others-Same CDR is uploaded by the bidder in other work |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Others-Single responsive bidder is left in first call. |
Tender Value
₹2.0 L
EMD Value
₹3,920
Closing Date
5 Aug 2026, 6:00 pmClosed
FAYAZ AHMED SHEIKH
EXECUTIVE ENGINEER REW RAMBAN
AS PER NIT
2026_RDPR_317168_33
NIT NO 15 OF REW RAMBAN 2026 27 BLOCK BANIHAL UNDER HEAD PRI AND DDC
Open Tender
Civil Works
Percentage
30 days
RAMBAN
AS PER NIT
2 documents required · 2 mandatory
₹600
Rural Development and Panchayati Raj
₹3,920
6 Aug 2026
22 Jul 2026
6 Aug 2026
22 Jul 2026
5 Aug 2026
22 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil. | - | cum | 592.9 | - |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). | - | cum | 5,733.6 | - |
| 3 | Providing and laying boulders in concrete including cost of stones all complete | 1 | cum | 910 | ₹909.09 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for:foundations ,footings bases of column | - | sqm | 286.35 | - |
| 5 | Carriage of cement from source to site by mechanical transport or animal transport or by head load | - | Ton | 343 | - |
| 6 | Carriage of Sand from source to site by mechanical transport or animal transport or by head load | - | cum | 1,285.8 | - |
| 7 | Carriage of Stone Aggregates below 20mm from source to site by mechanical transport or animal transport or by head load | - | cum | 956.7 | - |
| 8 | Carriage of Stones from source to site by mechanical transport or animal transport or by head load | - | cum | 642 | - |
| 9 | CIB( citizen information board) size 1'6''x2'6'' made of Granite stone ( complete job) | - | nos | 4,000 | - |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.30 MB
BOQ_1038327.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .