Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.5 LAdmitted-Finance | +4.50% | ₹2.5 L | L1 | Admitted-Finance |
| 2 | L2₹2.5 LAdmitted-Finance | +6.30% | ₹2.5 L | L2 | Admitted-Finance |
| 3 | L3₹2.5 LAdmitted-Finance SHED NO 9 TAHLIWAL DISTT UNA H P | +7.50% | ₹2.5 L | L3 | Admitted-Finance |
Tender Value
₹2.4 L
EMD Value
₹2,355
Closing Date
10 Dec 2025, 12:00 pmClosed
SR. EXECUTIVE ENGINEER ED HPSEBL RAKKAR UNA
SR. EXECUTIVE ENGINEER ED HPSEBL RAKKAR UNA
Tender for Permanent restoration of HPSEBL Infrastructure which were damaged on FY 2023 due to natural calamity under ESD HPSEBL Thanakalan
2025_HPSEB_122678_1
BID NO- UED/195/2025-26
Open Tender
Electrical Works
90 days
ESD HPSEBL THANAKALAN
AS PER SBD
5 documents required · 5 mandatory
₹590
₹2,355
26 Dec 2025
5 Dec 2025
11 Dec 2025
5 Dec 2025
10 Dec 2025
5 Dec 2025
A) Erection Part
ERECTION PART 11kV HT Line
Erection of PCC Single Pole Str. 9 Mtr. Long :- Digging of Pit fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit , and ramming & painting of poles complete in all respect.
Erection of S.T Single Pole Str. 9 Mtr. Long :- Digging of Pit fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit , Alluminium Paint and ramming & painting of poles complete in all respect.
re-sagging Stringing and sagging conductor:- Laying of conductor stringing and sagging, binding with insulator complete in all respect.
Erection of Stay Set HT:- Digging of Pit fixing of Stay Rod, filling of Pit, Nozeiling & Tightning complete in all respect.
Mannual carriage from road to site ,transportation charges from central store to site and loading- unloading in all respect (IN ALL HEAD) average distance at site
ERECTION PART of DTR
Erection of25 kva S/Stn.Erection of 11/0.4kv,25 kva Sub-Station on existing Str.
ERECTION PART 3Ph LT Line
Erection of LT line. Digging of pit, erection of PCC pole 8 mtr long, erection of C.I X-arm, Shakle insulators, D-iron and filling of pit and remming etc complete in all respect.
Erection of LT line. Digging of pit, erection of ST pole 8 mtr long, erection of C.I X-arm, Shakle insulators, D-iron and filling of pit and remming etc complete in all respect.
Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
Laying of conductor :- Laying of conductor, striging, sagging and biding with insulator with 7/2.50mm/7/3.15 mm Conductor aug. of New 3-Ph. Re-cond, 7/3.15 mm for 1-Ph. LT complete in all respect.,
Mannual carriage from road to site ,transportation charges from central store to site and loading- unloading in all respect (IN ALL HEAD) average distance at site
SUPPLY PART. 11kV HT Line
Prov. PCC Pole 9 mtr long with cap. (Provided By HPSEBL)
Prov. Steel Tublar 9 mtr long with cap. (Provided By HPSEBL)
Prov. RCC Muff
Prov.AAAC 7/4.26 mm Conductor
Prov. Cross Arm (Channel Iron (100x50x6) Length 1270 mm
Prov. Angle Iron (50x50x6mm) Leggth 750 mmx2
Prov. Pole Top Bracket (MSCI) (100X50X6 mm) Length 100 mm
Prov.Nuts and Bolts of Various Sizes
Prov.MS Half Clamp (Provided By HPSEBL)
Prov.MS Full Clamp
Prov.Barbed Wire
Prov.Eye/Earth Hook
Prov.11kv Pin Insulator with pin complete in all respect
Prov.11kv Stay Set
Prov. Stay Wire (7/3.15 mm) (10 kg. per Stay Set) Provided By HPSEBL)
Prov.Red Oxide (1.5 Ltr. Per Pole)
Prov.Alluminum Paint
Prov.11kv Danger Plate (250x200x1.6 mm)
SUPPLY PART
L.T.Line 3Ph LT Line
Steel Pole 8 mtr. Long. Provided by HPSEBL
PCC Pole 8 mtr. Long. Provided by HPSEBL
AAAC 7/3.15 mm2 Conductor Provided by HPSEBL
RCC Muff
Channel Iron (75x40x5) [Length-1.50 Mtr + 0.2 Mtr]
Full Clamp
Half Clamp for Cross Arm
Nut and Bolts
Shackle Insulator with D-Iron
Stay Set Complete (i/c stay clamp)
Stay Wire (7/3.15mm) (6.0 kg per stay set) Provided by HPSEBL
Aluminium Paint
Red Oxide
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.10 MB
Tendernotice_2.pdf
PDF • 0.44 MB
BOQ_180003.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid