Tender Value
₹14.7 L
EMD Value
₹29,380
Closing Date
26 Aug 2026, 6:00 pm2d left
EE WR Division I Ajmer
EE WR Division I Ajmer
Repair work of Sluice of Gopal Sagar Sarana P.s. Sarwar
2026_WRDAS_589679_2
NIT 03/2026-27_MJSA
Open Tender
Civil Works
Percentage
182 days
under jurisdiction of EE Ajmer I Division
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
as per nit
₹29,380
Yes
17 Aug 2026
17 Aug 2026
27 Aug 2026
17 Aug 2026
26 Aug 2026
17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. Thick | 17,194 | Sqm | 2.5 | ₹42,985 |
| 2 | Making standard type cement gauge including engraving letters and painting including scaffolding etc. | 4 | R.M. | 550 | ₹2,200 |
| 3 | Painting standard type gauge with black, red and white un-washable paints including cost of material | 4 | R.M. | 210 | ₹840 |
| 4 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Hard / dense soil | 972 | Cum | 79 | ₹76,788 |
| 5 | Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor s density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect.With initial lead of 250 m Deduct in item no 16 (a) to (d) above if Standard Proctor s density to be achived is at least 95 | 3,739 | Cum | 97 | ₹3,62,683 |
| 6 | (i) Compaction of earth or highly weathered strataBy mechanical equipment such as sheep foot roller/ pneumatic tyred roller/vibro compactor / vibro sheep foot compactor required as per site condition to obtain dry density of.at least 95% of Standard Proctor s density | 4,285 | Cum | 33 | ₹1,41,405 |
| 7 | Benching base and disposal of the excavated material including dressing etc. complete within initial lead up to 50m and lift up to 1.5m | 120 | Cum | 82 | ₹9,840 |
| 8 | Ploughing and picking of surface of old embankment | 1,805 | Sqm | 0.38 | ₹685.9 |
| 9 | Watering of earth including cost of carriage of water when source of water is up to 1 Km | 4,285 | Cum | 11 | ₹47,135 |
| 10 | Supplying and laying quarry spalls properly graded but not more than 10cm in size with spreading in required profile including all leads & lifts | 506.25 | Cum | 700 | ₹3,54,375 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
BOQ_1047237.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].