Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹12.9 Laccepted-aoc | ₹12.9 L | accepted-aoc |
Tender Value
₹22.7 L
EMD Value
₹22,703
Closing Date
7 Apr 2026, 11:30 amClosed
CGM(Engg) Revenue Circle
Khairatabad Hyderabad
Laying of Water Supply lines in various localities under O and M Dn.No.VI, XXII and XII under Deposit Contribution Works
689646
EP-354/CGM(E)/RC/2025-26, Dt:30.03.2026
OPEN
Water Supply
HYDERABAD
11 documents required · 11 mandatory
₹804
₹22,703
22 Apr 2026
31 Mar 2026
31 Mar 2026
Cutting open BT Road surface including labour charges all leads, lifts and conveyance of all materials labour charges and other incidental and operational charges, tools and plants etc. complete as directed by the HMWS&SB Engineers.
Earth Work Excavation and depositing on bank in all types of soils like black cotton soil, red earth and ordinary gravel,hard gravelly soils, mixure of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by departmental officers,including protecting the walls and other structures,existing water supply lines,sewews sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to disturb the existing utilityservices etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of strumps and other deleterious material and disposal upto a lead of 50m, dressing of side and bottom and including backfilling for pipeline trenches for laying water suppy/sewer lines all incidential and operationals charges etc.,complete as directed by the HMWS&SB Engineers.
Earth Work Excavation and depositing on bank in all types of soils like black cotton soil, red earth and ordinary gravel,hard gravelly soils, mixure of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by departmental officers,including protecting the walls and other structures,existing water supply lines,sewews sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to disturb the existing utilityservices etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of strumps and other deleterious material and disposal upto a lead of 50m, dressing of side and bottom and including backfilling for pipeline trenches for sliuice valve all incidential and operationals charges etc.,complete as directed by the HMWS&SB Engineers.
Excavation in hard rock (blasting prohibited) with benching, chiselling and wedging such as hard rock, sheet rock and boulders in habitant areas where controlled blasting cannot be done with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting walls and other structures, existing water supply lines, sewes, power cables, telephone cables/ducts, storm water drains, traffic signals etc.,wherever it is possible so as not to distrub the existing utility service etc., taking all precautionary measures in the restricted areas such as urban areas diversion of the traffic, removel of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and excluding backfilling for pipeline trenches for laying sewer/water supply lines/ foundations including all incidental and operational charges etc., complete. as directed by the HMWS&SB Engineers.
Barricading, Boarding, lighting and Watching etc., for pipe line trenches etc., complete as directed by the HMWS&SB Engineers.
Supply of good quality gravel for filling where ever required as directed by departmental officers including cost and conveyance of gravel, stacking, leveling, watering, tamping rolling, all leads, labour charges and other incidential and operational charges etc., complete.
Supply delivery and filling of quarry dust (50% Rubbish 50% HBG Stone 2.36 mm) where ever required as directed by departmental officers including cost and conveyance stacking leveling watering tampering rolling all leads lobour charges and other incidental and operational charghes etc. complete as directed by the HMWS&SB Engineers.
Lowering the 150mm dia DI pipes (all classes) and specials(Fittings) with s/s ends carefully into the ready made trenches and laying them true to alignment and gradient including labour charges, operational charges etc., but excluding conveyance of pipes from Board stores to work site etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Jointing of 150mm dia CI/DI pipes and fittings with rubber gaskets excluding the cos of rubber gasket but including all sundries filling with a water lead upto 500M and testing to required pressure etc complete as directed by the HMWS&SB Engineers.
Jointing of 150mm dia pipes and valves with flanged ends including the cost of jointing materials such as bolts nuts rubber insertion white lead and including filling with a water lead upto 500M and testing to required pressure etc., complete as directed by the HMWS&SB Engineers.
Labour charges for lowering and keeping in position 150mm dia C.I. Sluice valves including conveyance of all materials etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Cutting of 150mm dia CI pipes without water in the main etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Supply and delivery fixing of RCC precast manholes chambers having the size of 36" at bottom tappering to 21" dia at top fixing in CC 1:4:8 Prop along with FRC cover HD -20 and frame laying CC design mix M-30 prop: Including cost of materials labour charges earth work curing conveyance etc., complete as directed by the HMWS&SB Engineers.
Conveyance of pipes from the departmental stores to work site including loading, unloading and labour charges etc. complete as directed by the H.M.W.S.&.S. Board Engineers.
Redoing of 15mm PPC connection for domestic water supply connection incluidng earth work excavation cost of pipe refilling etc., complete as directed by the HMWS&SB Engineers.
Redoing domestic sewer line connection incluidng EWE in all available soils and incluidng supply delivery and fixing of 100mm dia SWG pipes and including lowering laying and jointing in CM (1:1) prop; etc., complete. as directed by the H.M.W.S.&. S. Board Engineers.
Carting away the surplus excavated materials such as rock / earth from the site to a suitable distance of about 8 Kms including loading, unloading, conveyance charges and dumping the carted material at the contractors cost labour charges, all leads and lifts, all other incidential and operational charges etc., complete. as directed by the H.M.W.S.&. S. Board Engineers.
Plain Cement Concrete (1:2:4) mix with 6mm to 20 mm guage hard granite machine crushed metal including cost and conveyance of all meterial to site, machine mixing of concrete, lifts, leads, form work laying in position, vibrating, compacting, curing, all labour charges, tools and plants and all other incidental and operational charges etc. complete as directed by departmental officers as directed by the H.M.W.S.&,S. Board Engineers.
(Rupees Six Lakh Forty Seven Thousand Three Hundred Ninety Three and Eleven Paisa only)
Conveyance of pipes from the departmental stores to work site including loading, unloading and labour charges etc. complete as directed by the H.M.W.S.&.S. Board Engineers.
Manufacture, supply and Delivery of 225X225X225 mm dia HDPE TEE fittings confirming to IS 4984-1995 including transportation etc., complete as directed by the HMWS&SB Engineers.
Manufacture, supply and Delivery of 225 mm dia HDPE Long neck confirming to IS 4984-1995 including transportation etc., complete as directed by the HMWS&SB Engineers.
Manufacture, supply and Delivery of 225 mm dia HDPE MS Flanges confirming to IS 4984-1995 including transportation etc., complete as directed by the HMWS&SB Engineers.
Cutting open CC road surface including labour charges, all leads and other incidental and operational charges tools and plants etc complete for pipe line trenches as directed by the HMWS&SB Engineers.
Earth Work Excavation and depositing on bank in all types of soils like black cotton soil, red earth and ordinary gravel,hard gravelly soils, mixure of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by departmental officers,including protecting the walls and other structures,existing water supply lines,sewews sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to disturb the existing utilityservices etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of strumps and other deleterious material and disposal upto a lead of 50m, dressing of side and bottom and including backfilling for pipeline trenches for laying water suppy/sewer lines all incidential and operationals charges etc.,complete as directed by the HMWS&SB Engineers.
Barricading, Boarding, lighting and Watching etc., for pipe line trenches etc., complete as directed by the HMWS&SB Engineers.
Cutting of 200mm dia CI pipes without water in the main etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Cutting of 150mm dia CI pipes without water in the main etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Lowering the 200mm dia DI pipes (all classes) and specials(Fittings) with s/s ends carefully into the ready made trenches and laying them true to alignment and gradient including labour charges, operational charges etc., but excluding conveyance of pipes from Board stores to work site etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Lowering the 150mm dia DI pipes (all classes) and specials(Fittings) with s/s ends carefully into the ready made trenches and laying them true to alignment and gradient including labour charges, operational charges etc., but excluding conveyance of pipes from Board stores to work site etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Jointing the 200mm dia C.I/DI K7 pipes and specials with S/S ends (Tyton rubber joints) excluding cost of jöinting materials such as rubber gasket and filling with water and testing to required field test pressure of 8kg/sqcm, including labour charges and all other incidental and operational charges to work site etc. complete as directed by the H.M.W.S.&.S. Board Engineers.
Jointing the 150mm dia C.I/DI K7 pipes and specials with S/S ends (Tyton rubber joints) excluding cost of jöinting materials such as rubber gasket and filling with water and testing to required field test pressure of 8kg/sqcm, including labour charges and all other incidental and operational charges to work site etc. complete as directed by the H.M.W.S.&.S. Board Engineers.
Labour charges for lowering and keeping in position 200mm dia C.I. Sluice valves including conveyance of all materials etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Labour charges for lowering and keeping in position 150mm dia C.I. Sluice valves including conveyance of all materials etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Jointing 200mm dia D.I. / C.I pipes and valves with D/F joints including cost of nuts, bolts, rubber insertion etc., including filling with water and testing to required pressure etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Jointing 150mm dia D.I. / C.I pipes and valves with D/F joints including cost of nuts, bolts, rubber insertion etc., including filling with water and testing to required pressure etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Collection, Supply and filling ( quarry dust)with HBG stone chips 2.36mm and below in trenches of foundations and basement and the pipe line trenches with initial lead in layers not exceeding 15 cm thick consolidating each deposited layer watering consoliditing each layer watering and ramming including cost of collection of sand and other requied materials conveyance of water to worksite and all operational incidental, labouer charges hire charges of T and P complete for finished item work ect., complete as directed by the H.M.W.S.&.S. Board Engineers.
Plain Cement Concrete (1:2:4) mix with 6mm to 20 mm guage hard granite machine crushed metal including cost and conveyance of all meterial to site, machine mixing of concrete, lifts, leads, form work laying in position, vibrating, compacting, curing, all labour charges, tools and plants and all other incidental and operational charges etc. complete as directed by departmental officers as directed by the H.M.W.S.&,S. Board Engineers.
Carting away the surplus excavated materials such as rock / earth from the site to a suitable distance of about 8 Kms including loading, unloading, conveyance charges and dumping the carted material at the contractors cost labour charges, all leads and lifts, all other incidential and operational charges etc., complete. as directed by the H.M.W.S.&. S. Board Engineers.
Supply and delivery fixing of RCC precast manholes chambers having the size of 36" at bottom tappering to 21" dia at top fixing in CC 1:4:8 Prop along with FRC cover HD -20 and frame laying CC design mix M-30 prop: Including cost of materials labour charges earth work curing conveyance etc., complete as directed by the HMWS&SB Engineers.
Making dummy arrangements to 100mm dia DI and CI inculding cost of CI socket tail piece with MS dummy plate and of Pig lead spun yarn and cost of joining material and all labour charges etc., complete as directed by the HMWS&SB Engineers.
(Rupees Six Lakh Seventy Three Thousand Three Hundred One and Thirty Four Paisa only)
Conveyance of pipes from the departmental stores to work site including loading, unloading and labour charges etc. complete as directed by the H.M.W.S.&.S. Board Engineers.
Cutting open CC road surface including labour charges, all leads and other incidental and operational charges tools and plants etc complete for pipe line trenches as directed by the HMWS&SB Engineers.
Cutting of WBM road surface including labour charges, all leads and other incidental and operational charges tool and plants etc complete for pipe line trenches as directed by the HMWS&SB Engineers.
Earth Work Excavation and depositing on bank in all types of soils like black cotton soil, red earth and ordinary gravel,hard gravelly soils, mixure of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by departmental officers,including protecting the walls and other structures,existing water supply lines,sewews sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to disturb the existing utilityservices etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of strumps and other deleterious material and disposal upto a lead of 50m, dressing of side and bottom and including backfilling for Junction and all incidential and operationals charges etc.,complete as directed by the HMWS&SB Engineers.
Excavation in hard rock (blasting prohibited) with benching, chiselling and wedging such as hard rock, sheet rock and boulders in habitant areas where controlled blasting cannot be done with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting walls and other structures, existing water supply lines, sewes, power cables, telephone cables/ducts, storm water drains, traffic signals etc.,wherever it is possible so as not to distrub the existing utility service etc., taking all precautionary measures in the restricted areas such as urban areas diversion of the traffic, removel of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and excluding backfilling for pipeline trenches for laying sewer/water supply lines/ foundations including all incidental and operational charges etc., complete. as directed by the HMWS&SB Engineers.
Lowering the 400mm dia DI pipes (all classes) and specials(Fittings) with s/s ends carefully into the ready made trenches and laying them true to alignment and gradient including labour charges, operational charges etc., but excluding conveyance of pipes from Board stores to work site etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Jointing 400mm dia CI/D.I. pipes and fittings with rubber gasket (push-on-joint), excluding the cost of the gasket but including all sundries filling with water, with a water lead up to 500m and tesong to required pressure, etc.., complete as directed by the HMWS&SB Engineers.
Labour charges for lowering and keeping in position 400mm dia D.I. Sluice valves including conveyance of all materials etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Jointing 400mm dia D.I. / C.I pipes and valves with D/F joints including cost of nuts, bolts, rubber insertion etc., including filling with water and testing to required pressure etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Masonry work in CM(1:6) prop with flyash cement solid blocks of size 290x225x140mm with 50kg/sqcm compressive strength for manufacturing of flyash solid blocks using flyash of 80kg, cement of 15kg, Gypsum of 5kg and stone dust including cost and conveyance of all materials, labour charges, seigniorage charges, scaffolding and curing etc complete with a compressive strength not less than 50kg/sqm for walls for super structure walls for construction of chambers(chamber Size 2X2X2m), etc.,complete as directed by the H.M.W.S.&.S. Board Engineers.
Carting away the surplus excavated materials such as rock / earth from the site to a suitable distance of about 8 Kms including loading, unloading, conveyance charges and dumping the carted material at the contractors cost labour charges, all leads and lifts, all other incidential and operational charges etc., complete. as directed by the H.M.W.S.&. S. Board Engineers.
Junction work on 600mm dia MS pipe with 400mm dia DI duly lowering carefully into ready made trenches abd fixing it carefully with the existing MS pipe line without damaging the existing pipe line and making welding with experience welder who has done similar type of work previously, including hore charges of gas cutting set,Generator,welding transformer wags for fittings, Welders and helper all incidental and operational charges etc . complete as directed by the H.M.W.S.&.S. Board Engineers.
Barricading, Boarding, lighting and Watching etc., for pipe line trenches etc., complete as directed by the HMWS&SB Engineers.
Supply delivery and filling of quarry dust (50% Rubbish 50% HBG Stone 2.36 mm) where ever required as directed by departmental officers including cost and conveyance stacking leveling watering tampering rolling all leads lobour charges and other incidental and operational charghes etc. complete as directed by the HMWS&SB Engineers.
Supply of good quality gravel for filling where ever required as directed by departmental officers including cost and conveyance of gravel, stacking, leveling, watering, tamping rolling, all leads, labour charges and other incidental and operational charges as directed by the H.M.W.S.&.S. Board Engineers.
Plain Cement Concrete (1:2:4) mix with 6mm to 20 mm guage hard granite machine crushed metal including cost and conveyance of all meterial to site, machine mixing of concrete, lifts, leads, form work laying in position, vibrating, compacting, curing, all labour charges, tools and plants and all other incidental and operational charges etc. complete as directed by departmental officers as directed by the H.M.W.S.&,S. Board Engineers.
Manufacture, supply, delivery of 400mm dia M.S Plain Pipe Special for length of 1.0M including cost and conveyance etc. complete as directed by the H.M.W.S.&.S. Board Engineers.
Manufacture, supply, delivery of 100mm dia M.S Plain Pipe Special for length of 1.0M including cost and conveyance etc. complete as directed by the H.M.W.S.&.S. Board Engineers.
Cost of 400X18 mm thick M.S Flanges including cost of bolts, nuts, rubber packing etc., complete and flange thickness conforming to IS:7322-1985 and flange dimensions conforming to IS:1538-1993 excluding cost of MS specials including cost and conveyance to site etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Making dummy arrangements to 400mm dia DI and CI inculding cost of CI socket tail piece with MS dummy plate and of Pig lead spun yarn and cost of joining material and all labour charges etc., complete as directed by the HMWS&SB Engineers.
(Rupees Nine Lakhs Forty Nine Thousand Five Hundred and Ninety Four and Eighty Two Paisa only)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
TENDER DOCUMENT.doc
TENDER_DOCUMENT • 0.22 MB
Schedule A.xls
TENDER_DOCUMENT • 0.09 MB
Schedule B.xls
TENDER_DOCUMENT • 0.09 MB
Schedule C.xls
TENDER_DOCUMENT • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .