| 1 | L1₹16.4 LAccepted-Finance | L1 | Accepted-Finance ok | |
| 2 | L2₹16.6 L+₹15,029.05 (0.91%)Accepted-Finance | L2 | Accepted-Finance ok | |
| 3 | Rejected-Technical | - | Rejected-Technical Rejected due to Non Submssion OF EMD FDR | |
| 4 | Rejected-Technical PROP NO A 80 FIRST FLOOR FLAT NO 3 CHATTAR PUR ENCLAVE PHASE 2 NEW DELHI SOUTH WEST DELHI DELHI 110074 | SOUTH DELHI | DELHI | 110074 | - | Rejected-Technical Rejected due to Non Submssion OF EMD FDR |
Tender Value
Refer Docs
EMD Value
₹33,100
Closing Date
16 Aug 2024, 2:30 pmClosed
EE EnM HP I
DELHI JAL BOARD GOVT OF NCT OF DELHI OFFICE OF THE EXECUTIVE ENGINEER EnM HP I HAIDERPUR WATER WORKS DELHI 110085
Strengthening of MS structure of Clarifier No. 3 at Filter House, HPWW I.
2024_DJB_260863_3
NIT 7
Open Tender
Miscellaneous Works
Works
60 days
Haiderpur WTP
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Delhi Jal Board
₹33,100
20 Aug 2024
9 Aug 2024
16 Aug 2024
9 Aug 2024
16 Aug 2024
9 Aug 2024
Dewatering/De-silting of sludge from inside portion of Clarifier No. 3 with the help of sludge pump sets. Work includes lowering of pump sets by making special lifting/lowering arrangement on the center of clarifier bridge. Removing & taken out the mud / malba / earth from the clarifier central pit by using buckets/phawarah etc. as required by manual labour and removing of floating material & cleaning of bridge & flocculators M.S. structure, M.S. Paddles and taken out damaged paddles etc. by manual labours and disposal of the same as per direction of Engineer-in-charge. Work also includes arraengement of cable & laying the same for temporary electrical connections and installation of Electrical starters for operation of pumping sets and making of electrical connection from electrical source available at Filter House. Taken out the pumping sets and accessories from the clarifier after completion of work and disconnecting the electric supply from the source.
Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. DSR-2021, 15.18. ( Payment will be made as per actual).
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. DSR-2021, 10.2 ( Payment will be made as per actual).
Painting of MS structure of clarifier with approved make enamel paint as per requirement of site.
Providing / fixing of rubber squeezes with nut bolts, washers & M.S. flat etc. as required. ( 6 nos. for bridge and 6 nos. for flocculator)
Testing & commissioning of Clarifier on Load
MK ENGG.CO.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .