| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-AOC | ₹1.9 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹1.9 L+₹4,716.06 (2.48%)Rejected-AOC 17 A SHYAMA JI PURAM I I T SOCIETY IIT KALYANPUR KANPUR UTTAR PRADESH 208016 | KANPUR NAGAR | UTTAR PRADESH | 208016 | ₹1.9 L+₹4,716.06 (2.48%) | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | Krishna and Co L2 | Suriyakala S L1 |
|---|---|---|---|---|---|
| 1.01 | 1.Repairs to Periyavalayam PUE School RCC Building (Two Class Room) in Periyavalayam Panchayat (South Facing)
Clean removal of cement plaster from walls including all labour charges, etc., copmlete | 69.6 | Sqm | 11 ₹765.6 | 9 ₹626.4 Lowest |
| 1.02 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 69.6 | Sqm | 315 ₹21,924 | 308.8 ₹21,492.48 Lowest |
| 1.03 | Provision for Name board | 1 | No | 1,250 ₹1,250 | 1,000 ₹1,000 Lowest |
| 2.01 | 2.Repairs to Edaiyar PUM School RCC Building (Two Class Room) in Edayar Panchayat (West Facing)
Clean removal of cement plaster from walls including all labour charges, etc., copmlete | 58.97 | Sqm | 11 ₹648.67 | 9 ₹530.73 Lowest |
| 2.02 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 58.97 | Sqm | 315 ₹18,575.55 | 308.8 ₹18,209.94 Lowest |
| 2.03 | Provision for Name board | 1 | No | 1,250 ₹1,250 | 1,000 ₹1,000 Lowest |
| 3.01 | 3.Repairs to Edaiyar PUE School (Adhidravidar School) RCC Building (Two Class Room) in Edaiyar Panchayat (South Facing)
Clean removal of cement plaster from walls including all labour charges, etc., copmlete | 58.97 | Sqm | 9 ₹530.73 Lowest | 9 ₹530.73 Lowest |
| 3.02 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 58.97 | Sqm | 308.8 ₹18,209.94 Lowest | 308.8 ₹18,209.94 Lowest |
| 3.03 | Provision for Name board | 1 | No | 1,000 ₹1,000 Lowest | 1,000 ₹1,000 Lowest |
| 4.01 | 4.Repairs to T.Pottakollai PUE School RCC Building (Two Class Room) in Thathanur Panchayat (South Facing)
Clean removal of cement plaster from walls including all labour charges, etc., copmlete | 58.97 | Sqm | 11 ₹648.67 | 9 ₹530.73 Lowest |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
26 Nov 2025, 3:00 pmClosed
Block Development Officer (BP)
Panchayat Union, Jayankondam
Repairs of School Buildings 7 Nos in Periyavalayam, Edaiyar, Thathanur, Katchiperumal, Thularankuruchi and V.T.Pattinam Panchayats in Package No.3 in Jayankondam Block of Ariyalur District under PUGF 2025-26
2025_RDTN_624729_1
A5/3121/2024,Dated.14.11.2025
Open Tender
Civil Works - Others
Works
30 days
Panchayat Union, Jayankondam
As per Tender Document
4 documents required · 4 mandatory
₹0
₹2,000
6 Jul 2026
19 Nov 2025
26 Nov 2025
19 Nov 2025
26 Nov 2025
19 Nov 2025
Amount
1.Repairs to Periyavalayam PUE School RCC Building (Two Class Room) in Periyavalayam Panchayat (South Facing) Clean removal of cement plaster from walls including all labour charges, etc., copmlete
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Provision for Name board
2.Repairs to Edaiyar PUM School RCC Building (Two Class Room) in Edayar Panchayat (West Facing) Clean removal of cement plaster from walls including all labour charges, etc., copmlete
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Provision for Name board
3.Repairs to Edaiyar PUE School (Adhidravidar School) RCC Building (Two Class Room) in Edaiyar Panchayat (South Facing) Clean removal of cement plaster from walls including all labour charges, etc., copmlete
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Provision for Name board
4.Repairs to T.Pottakollai PUE School RCC Building (Two Class Room) in Thathanur Panchayat (South Facing) Clean removal of cement plaster from walls including all labour charges, etc., copmlete
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Provision for Name board
5.Repairs to Katchiperumal PUM School RCC Building (Three Class Room) in Katchiperumal Panchayat (South Facing) Clean removal of cement plaster from walls including all labour charges, etc., copmlete
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Provision for Name board
6.Repairs to Thulankuruchi PUM School RCC Building (Three Class Room) in Thularankuruchi Panchayat (South Facing) Clean removal of cement plaster from walls including all labour charges, etc., copmlete
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Provision for Name board
7.Repairs to Vanathirayanpattinam PUE School RCC Building (Two Class Room) in Vanathirayanpattinam Panchayat Clean removal of cement plaster from walls including all labour charges, etc., copmlete
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for this work}
Krishna and Co (BID ID -1521637)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.59 MB
TechnicalBid3.pdf
Tender Documents • 0.83 MB
PriceBid3.pdf
Tender Documents • 0.71 MB
BOQ_747065.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .