Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.9 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹44.5 L+₹2.9 L (6.87%)Rejected-Finance 32 H I G AWAS VIKAS COLONY SECTOR 3 BODLA AGRA UP 282007 | AGRA | AGRA | UP | 282007 | L2 | Rejected-Finance Being other than L1 | |
| 3 | L3₹45.0 L+₹3.4 L (8.24%)Rejected-Finance | L3 | Rejected-Finance Being other than L1 | |
| 4 | L4₹45.6 L+₹4.0 L (9.64%)Rejected-Finance | L4 | Rejected-Finance Being other than L1 | |
| 5 | L5₹45.9 L+₹4.3 L (10.2%)Rejected-Finance 1 2 NAGARIA IDGAH AGRA 282001 UP | AGRA | UTTAR PRADESH | 282001 | L5 | Rejected-Finance Being other than L1 |
| Sl No | Description | Qty | Unit | m/s shanti consruction co L2 | m/s Agra Builder L8 | Asha Construction L9 | M/s Laxmi Associate L5 | SahaDevSingh Constructions L3 | Shiva Enterprises L6 | CREATIVE CONSTRUCTION L4 | M/S RADHEY GOVIND ENTERPRISES L7 | M/S A A DRILL EXPERT L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of brick work or stone/boulder masonary built in cement mortar including all quoins, arches, pillars etc complete all as directed. | 15 | Cum | 200 ₹3,000 Lowest | 1,215 ₹18,225 | 1,314 ₹19,710 | 1,500 ₹22,500 | 1,314 ₹19,710 | 1,300 ₹19,500 | 210 ₹3,150 | 1,315 ₹19,725 | 275 ₹4,125 |
| 2.00 | M&L brick work with sub class 'B' bricks straight or curved on plan exc 6 m mean radius built in CM 1:6 complete all as specified and directed. | 13 | Cum | 4,800 ₹62,400 | 5,450 ₹70,850 | 4,144 ₹53,872 | 4,800 ₹62,400 | 4,144 ₹53,872 | 4,000 ₹52,000 Lowest | 4,100 ₹53,300 | 4,200 ₹54,600 | 5,250 ₹68,250 |
| 3.00 | Dittto all as item no 02 above but except bricks complete all as specified and directed. | 2 | Cum | 2,000 ₹4,000 Lowest | 2,350 ₹4,700 | 2,223 ₹4,446 | 3,000 ₹6,000 | 2,223 ₹4,446 | 2,000 ₹4,000 Lowest | 2,700 ₹5,400 | 2,300 ₹4,600 | 2,000 ₹4,000 Lowest |
| 4.00 | M&L for brickwork with subclass ‘B’ bricks, straight or curved on plan to any radius in half brick thick built in CM 1:4 complete all as specified & directed. | 10 | Sqm | 850 ₹8,500 | 595 ₹5,950 Lowest | 606 ₹6,060 | 600 ₹6,000 | 606 ₹6,060 | 600 ₹6,000 | 600 ₹6,000 | 650 ₹6,500 | 650 ₹6,500 |
| 5.00 | Taking down cement or cement lime plaster of any discription on bricks or stone walls/ceiling etc including racking out joints, hacking for kay, scrubbing down with water complete all as specified and directed. | 1,520 | Sqm | 25 ₹38,000 Lowest | 45 ₹68,400 | 76 ₹1,15,520 | 100 ₹1,52,000 | 76 ₹1,15,520 | 70 ₹1,06,400 | 110 ₹1,67,200 | 75 ₹1,14,000 | 25 ₹38,000 Lowest |
| 6.00 | M & L for washed stone grit plaster on exterior walls in two layers , under layer 12 mm thick cement plaster 1:4 ( 1 cemant : 4 coarse sand ) furrowing the under layer with scratching tool , applying cement slurry on the under layer @ 3 Kg of cement per sqm , top layer 15 mm th cement plaster 1 :1 / 2 :2 ( 1 cement : 1/2 coarse sand : 2 stone chipping 10 mm nominal size ) in panels with groove all arround as per approved pattern incl. scrubbing and washing the top layer with brushes and water to expose the stone shipping complete all as specified & directed. | 900 | Sqm | 800 ₹7,20,000 | 765 ₹6,88,500 | 655 ₹5,89,500 | 620 ₹5,58,000 | 655 ₹5,89,500 | 600 ₹5,40,000 Lowest | 760 ₹6,84,000 | 655 ₹5,89,500 | 840 ₹7,56,000 |
| 7.00 | Forming groove of uniform size 15 mm wide and 15 mm deep in the top layer of washed stone grit plaster as per approved pattern using wooden battens nailed to the under layer incl. removal of wooden battens , repair to the edges of panels and finishing the groove complete all as specified & directed. | 250 | RM | 60 ₹15,000 | 35 ₹8,750 | 38 ₹9,500 | 35 ₹8,750 | 38 ₹9,500 | 30 ₹7,500 Lowest | 60 ₹15,000 | 35 ₹8,750 | 40 ₹10,000 |
| 8.00 | M&L for 10 to 12 mm thick smart care ready mix repair plaster with high quality polymer additives and well graded sand and fillers which can be used for plastering (as per manufacturer instructions) over interior surface of wall etc complete all as specified & directed.
(Note : Coverage for smart care ready mix plaster will be 24 - 28 kg / sqm) | 300 | Sqm | 425 ₹1,27,500 | 325 ₹97,500 | 315 ₹94,500 | 320 ₹96,000 | 315 ₹94,500 | 300 ₹90,000 | 360 ₹1,08,000 | 300 ₹90,000 | 250 ₹75,000 Lowest |
| 9.00 | M&L for 10 to 12 mm thick smart care ready mix repair plaster with high quality polymer additives and well graded sand and fillers which can be used for plastering (as per manufacturer instructions) over exterior surface of wall etc complete all as specified & directed.
(Note : Coverage for smart care ready mix plaster will be 24 - 28 kg / sqm) | 300 | Sqm | 425 ₹1,27,500 | 255 ₹76,500 | 280 ₹84,000 | 300 ₹90,000 | 280 ₹84,000 | 200 ₹60,000 Lowest | 360 ₹1,08,000 | 280 ₹84,000 | 270 ₹81,000 |
| 10.00 | M&L for preparation of newly plastered surfaces of ceiling and applying three coat of white wash complete all as specified and directed. | 120 | Sqm | 20 ₹2,400 | 25 ₹3,000 | 26 ₹3,120 | 30 ₹3,600 | 26 ₹3,120 | 20 ₹2,400 | 35 ₹4,200 | 26 ₹3,120 | 15 ₹1,800 Lowest |
Tender Value
₹45.7 L
EMD Value
₹91,500
Closing Date
9 Sept 2025, 6:00 pmClosed
GE (East) Agra
Garrison Engineer (East) Agra, Military Engineer Services, Gwalior House, 62 Taj Road Agra Cantt-282001
SPECIAL REPAIR TO BLDG NO PR-14 ALONGWITH BOUNDARY WALL AT PR RD AND FCRC AT 509 ABW UNDER GE (EAST) AGRA
2025_MES_726340_1
9823/E8
Open Tender
Civil Works
Item Rate
180 days
Agra Cantt
Please refer tender documents
10 documents required · 10 mandatory
₹500
GE (East) Agra
₹91,500
Yes
9 Dec 2025
19 Aug 2025
11 Sept 2025
19 Aug 2025
9 Sept 2025
2 Sept 2025
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .