Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.5 LAccepted-AOC 19 NEW SINDHI SOCIETY UPNAGAR NASHIK 422 006 | NASHIK | NASHIK | MAHARASHTRA | 422006 | L1 | Accepted-AOC Lowest | |
| 2 | L2₹24.5 L+₹27,180 (1.12%)Rejected-Finance | L2 | Rejected-Finance Not lowest | |
| 3 | L3₹26.3 L+₹2.0 L (8.34%)Rejected-Finance | L3 | Rejected-Finance Not lowest |
Tender Value
₹25 L
EMD Value
₹50,000
Closing Date
9 Feb 2023, 6:00 pmClosed
Garrison Engineer Nasik Road
Garrison Engineer Nasik Road AOP Complex Near AOP Gate PO Gandhinagar Nasik 422006
As per amendment
2022_MES_570346_2
GE/NRC/8481/E8
Open Tender
Civil Works
Item Rate
270 days
Garrison Engineer Nasik Road
As per NIT
7 documents required · 7 mandatory
₹500
Garrison Engineer Nasik Road
₹50,000
Yes
6 Mar 2023
23 Jan 2023
11 Feb 2023
23 Jan 2023
9 Feb 2023
26 Jan 2023
Amount
Repair to Almirah large steel (FD-67 and 1031) as under :-
Removing of UNSV 3 way locking device and providing / S&F of new locking device 3 way and fixing them to almirah large and making original shape complete welding to the almirah all as specified on drawing and directed by Engineer-in charge.
Removing of UNSV hinges from shutters S&F of new hinges 75mm by welding properly to the shutters all as specified on drawing and directed by Engineer-in charge.
Removing of unserviceable locks and providing new locks of size 50 mm, 6 levers with stainless steel keys in duplicate for Almirah large steel with shelves and fixing them with existing 3 way locking system all as specified on drawing and directed by Engineer-in charge.
Removing of unserviceable / broken handles & providing new handle steel cromium plated 100mm to almirah large with shelves & fix suitably as specified on drawing and directed by Engineer-in charge.
Removing unserviceable shelves of almirah large steel with shelves and providing new shelves, made out of 20 guage MS black sheet duly painted with two coats of synthetic enamel paint over a coat of redoxide primer by means of spray painting & providing necessary cleats/nuts and bolts etc complete all as specified on drawing and directed by Engineer-in charge.
Removing unserviceable/broken old legs of almirah Large steel and supply and fixing of new leg of same as per drg and directed by Engr -in-charg.
Repair to Almirah med steel (FD- 243 and 1032) as under :-
Removing of UNSV 3 way locking device and providing / S&F of new locking device 3 way and fixing them to almirah med and making original shape complete welding to the almirah all as specified on drawing and directed by Engineer-in charge.
Removing of UNSV hinges from shutters S&F of new hinges 75mm by welding properly to the shutters all as specified on drawing and directed by Engineer-in charge.
Removing of unserviceable locks and providing new locks of size 50 mm, 6 levers with stainless steel keys in duplicate for Almirah med steel with shelves and fixing them with existing 3 way locking system all as specified on drawing and directed by Engineer-in charge.
Removing of unserviceable / broken handles & providing new handle steel cromium plated 100mm to almirah med with shelves & fix suitably as specified on drawing and asdirected by Engineer-in charge.
Removing unserviceable shelves of almirah med steel with shelves and providing new shelves, made out of 20 guage MS black sheet duly painted with two coats of synthetic enamel paint over a coat of redoxide primer by means of spray painting & providing necessary cleats/nuts and bolts etc complete all as specified on drawing and directed by Engineer-in charge.
Removing unserviceable/broken old legs of almirah med steel and supply and fixing of new leg of same asp per drg and directed by Engr -in-charg.
Repair to Locker bed side Steel (FD-1029/1029( R)) as under :-
Removing of UNSV hinges from shutters S&F of new hinges 75mm by welding properly to the shutters all as specified on drawing and directed by Engineer-in charge.
Removing UNSV Haps & staples from lockers S&F of new Haps & staples 75mm steel CP duly welded to the locker shutters in original shape all as specified on drawing and directed by Engineer-in charge.
Removing of UNSV Handles from lockers, S&F of new handles 100mm steel CP ('C' type) duly welded to the locker shutter in original shape all as specified on drawing and directed by Engineer-in charge.
Removing of UNSV 3 way locking device from locker S&F of new locking device complete with 100mm steel CP handles duly fitted with nut and bolt/welding to the locker in original shape all as specified on drawing and directed by Engineer-in charge.
Removing of UNSV lock from locker S&F of new locks of size 50mm, 6 levers with kays in duplicate and fixing them with 3 way locking system all as specified on drawing and directed by Engineer-in charge.
Removing of UNSV sliding channel for locker bed side with drawer and S & F of New sliding channel all as specified on drawng and direced by Engr-in charge.
Repair to Bed Hard steel MAP (FD/E6/MAP/08)
Removing the existing worn out UNSV Ply wood from Bed Hard steel MAP as per drg & directed by Engineer -In -Charge.
Supply and fixing of ply wood commercial of size 7' x 3' x 12'mm thick BWR grade, Ist mark kit ply (Vista) / Assam power / Anchor on top frame with counter sunk screw with washer of required length all as specified and as directed by Engineer - in-Charge.
Removing of old UNSV Head Rest from Bed Hard Steel MAP and S & F New Head Rest as per existing size and Shape all as specified as per drawing and directed by Engineer-in charge.
Removing of old UNSV Foot Rest from Bed Hard Steel MAP and S & F New Foot Rest as per existing size and Shape all as specified as per drawing and directed by Engineer-in charge.
Removing of old UNSV Side Rail from Bed Hard Steel MAP and S & F New foot Rest as per existing size and Shape all as specified as per drawing and directed by Engineer-in charge.
Removing of old UNSV Stiffener from Bed Hard Steel MAP and S & F New stiffener as per existing size and Shape all as specified as per drawing and directed by Engineer-in charge.
Rapair to GI Charpoy 32mm (FD-220) as under :-
Removing the existing worn out UNSV nylon neawr from charpoy GI Pipe as directed by Engineer-in charge.
Tightening of all loose parts check nuts, elbows, long rails and sort rails etc to hold the charpoy tight to original shape as specified on drawing and as directed by Engineer-in charge.
Removing the unserviceable long rails of charpoy GI Pipe 32 mm med grade and replacing with new long rail of 32 mm dia med. grade GI pipe with ISI marked, duly threaded at both ends (Minimum 10 threads for each end) complete and all as specified and shown on drg.
Removing the unserviceable short rails from charpoy GI Pipe med grade and Fix short rail made out of GI pipes obtained from ser item No 5.03 above by cutting, threading into short rails (Minimum 10 threads for each end) fixing as specified on drawing and as directed by Engineer-in charge.
Removing the unserviceable legs of charpoy GI Pipe 32 mm dia med. grade and Fix of legs made out of GI pipes obtained from items No 5.03 & 5.04 above (long rail & short rail) by cutting to size of legs duly threaded at one end and other side base plate made out of 60 mm dia 3 mm thick MS sheets with proper and smooth welding remain same as specified on drawing and as directed by Engineer-in charge.
Removing the unserviceable Elbow GI 32 mm dia 3 way from charpoy GI Pipe frame. Supply and fix new Elbow 32 mm dia 3 way with ISI marked and as specified on drawing and as directed by Engineer-in charge.
Removing unserviceable GI check nut 32 mm dia medium grade from charpoy GI Pipe. Supply & fix new 32 mm dia check nut all as specified and directed by Engineer-in charge.
Supply and fixing of nylon newar 50 / 55 mm wide virgin quality and re-weaving closely with the charpoy GI frame. Nylon newar shall not be less than 1.50 kg in each charpoy. (Recyle newar shall not be used) all as specified on drawing and as directed by Engineer-in charge.
Repair of Charpoy GI Pipe 32mm Ply Top (FD-220)
Removing old Plytop from charpoy GI pipe 32mm & S&F of new plytop made out of 12mm thick plywood commercial BWR grade, ISI Mark on top fixed to each cleat with counter sunk nut bolt & washer of required length all as specified and diredted by Engr-in-charge.
Removing old U/S stiffner from charpoy and S&F of new stiffner made out of MS Square Tube 25 x 25 x 1mm thick between long rail to long rail as directed by Engr-in charge.
Removing of old U/S cleats form GI Charpoy and S&F new cleats made out of MS Flate 40 x 6mm, 50mm long as directed by Engr-in charge.
Repair to charpoy IP Folding
Removing the existing worn out UNSV Plywood from charpoy IP Folding steel and S & F of Ply wood Commercial of exixting size on top frame fixed with screw & washer of required length all as specified and as directed by Engineer - in-Charge.
Repair to table dining ORs FD-165(M) as under :-
Removing of existing U /S top of Table Dining ORs and Supply & fixing of new Aluminium top of same size & shape made out of 18/19 mm thick of block board duly covered of 1mm thick Aluminium sheet and fixing with suitable screw to table frame as per drg & directed by Engr in Charge.
Removing of old U/S leg with rubber shoe and welded new legs with rubber shoe as per existing specification & drg.
Removing of old U/S long rail of top frame and welded new long rail as per existing specification & drg.
Removing of old U/S short rail of top frame and welded new short rail as per existing specification & drg.
Removing of old U/S stiffner long and welded new stiffner long as per existing specification & drg.
Removing of old U/S stiffner short and welded new stiffner short as per existing specification & drg.
Repair to table office Clks steel (FD-84/381/1004) as under :-
Removing the UNSV table top and providing new top of size 1220mm length x 610mm width, made out of 18mm thick pre-laminated particle board including 4mm thick teak beading all round the table top complete duly french polished all as specified on drawing and directed by Engineer-in charge
Removing unserviceable locks and providing new drawer brass lock with stainless steel duplicate keys for tables all as specified on drawing and directed by Engineer-in charge
Removing the UNSV drawers and supply new drawer as per same specificition & size directed by Engineer-in charge
Repair to table office offr steel (FD-84M & 1003) as under :-
Removing the UNSV table top and providing new top of size 1220mm length x 610mm width, made out of 18mm thick pre-laminated particle board including 4mm thick teak beading all round the table top complete duly french polished all as specified on drawing and directed by Engineer-in charge
Removing unserviceable locks and providing new drawer brass lock with stainless steel duplicate keys for tables all as specified on drawing and directed by Engineer-in charge
Removing the UNSV drawers and supply new drawer as per same specificition & size directed by Engineer-in charge
Repair to table 900x600 (3'x2') with Dr and W/O Dr FD-1007/1008 as under :-
Removing the UNSV / Broken table top and providing new top of size 900 x 600 mm made out of 18mm thick pre-laminated particle board including teak wood beading 4mm thick alround the table top complete duly french polished all as directed and as shown on Drg.
Replacement of old U/S leg as per existing specification
Replacement of old U/S long rail as per existing specification
Replacement of old U/S short rail as per existing specification
Replacement of old U/S stiffner as per existing specification
Removing the UNSV/old drawer & supply & fixng of New drawer to table 900x600 with drawer.
Rapair to table 900x900 FD-1009 as under :-
Removing unserviceable / Broken top of table and providing new top of size 900 x 900 mm made out of 18mm thick pre-laminated particle board including teak wood beading 4mm thick alround the table top, duly french polished as directed & as shown on Drg.
Removing of existing U/S legs and providing new legs with rubber shoe as per same specification.
Removing of existing U/S Top frame rail and providing new rail as per same specification.
Table computer (FD/E6/MAP/03)
Removing unserviceable / Broken top of table computer and providing new top of same size made out of 18mm thick pre-laminated particle board including PVC beading alround the table top, duly french polished as directed & as shown on Drg.
Removing unserviceable / Broken Key Board Drawer and S & F of New one as per existeing size all as specified on drawing and as directed by Engr-in-Charge.
Removing unserviceable / Broken Drawer with knob and S & F of New one as per existeing size all as specified on drawing and as directed by Engr-in-Charge.
Removing unserviceable / Broken Key Board Drawer's and Table Deawer Sliding Channels and S & F of New one as per existeing size all as specified on drawing and as directed by Engr-in-Charge.
Removing unserviceable / Broken mouse Pad Drawer and S & F of New one as per existeing size all as specified on drawing and as directed by Engr-in-Charge.
Removing unserviceable / Broken Printer standand S & F of New one as per existeing size all as specified on drawing and as directed by Engr-in-Charge.
Repair to tepoy Varandah FD-255 as under :-
Removing unserviceable top of teapoy varandah and providing new top of size 900 x 450mm, made out of 18mm thick pre-laminated particle board including teak wood beading 4mm thick alround the top, duly french polished as directed & as shown on Drg.
Repair to chair revolving tilting/chair Computer (FD-75(M) /FD/E6/MAP/01) as under :-
Removing the old UNSV/worn out wheels from the chairs, replacing with new nylon/PVC wheel duly fitted to the chair with suitable size of screws all as shown in drawing and directed by Engineer-in charge.
Removing the old UNSV/worn out Gas lift mechanism/pnuematic pump from the chair, replacing with new high quality gas lift mechanism pump alongwith titling bolt suitable size duly fitted to the chair all as specified and directed by Engineer-in charge.
Removing the old UNSV/worn out Arm rest (Handle) from the chair, replacing with new D type PU soft/Hard handles of suitable size duly fitted to the chair with screws/Bolt at required size all as specified and directed by Engineer-in charge.
Removing the old UNSV stand Base from the chairs, replacing with new stand made up of Base PVC with wheel of reqiured size to be fitted to the chair at original shape complete all as specified and directed by Engineer-in charge.
Removing the old UNSV seat from the chair, replacing with new seat made out of 12mm thick moulded ply sheet and chemically treated and cushioning covered by fabric/Leather cloth as approved by GE all as specified and directed by Engineer-in charge.
Removing the old UNSV back from the chair, replacing with new back made out of 12mm thick moulded ply sheet and chemically treated and cushioning covered by fabric/Leather cloth as approved by GE all as specified and directed by Engineer-in charge.
Repair to chair Varandah (FD-19(M) / 256 / 259) as under :-
Removing old worn out / UNSV plastic cane from chair varandah, welding the loose / broken portion of chair frame wherever required and applying one coat of synthetic enamel paint white on frame, recanning the chair with 5 mm x 0.4 mm thick plastic cane good quality (recycled cane shall not be used. Provided with 04 Nos rubber shoes to legs of chair varandah all as specified on drawing and as directed by Engr-in-Charge.
Repair to chair Varandah FD/MAP-II/06 & 15 as under :-
Removing old UNSV/Broken PVC seat & Back from chair varandah & providing and fixing new PVC Seat & Back for chair varandah all as specified on drawing and as directed by Engr-in-Charge.
Repair to steel furniture of all type (Welding work)
Welding spot wherever it required as various steel furniture like Bed Steel Ply top, Rack Steel, Table steel, Chairs steel etc to join the corner etc duly grainded & painted on perticular spot.
NOTE : - AMOUNT OF SCHEDULE OF CREDIT RS 75,140.00 WILL BE DEDUCTED FROM TOTAL AMOUNT OF BOQ.
M/s SK Construction
M/s. SHRI SAINATH ENTERPRISES
Bidder Name
M/s Rajesh G Ramsinghani
M/s. SHRI SAINATH ENTERPRISES
M/s SK Construction
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .