Tender Value
₹2.5 Cr
EMD Value
₹2.8 L
Closing Date
30 Apr 2025, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
SUB BCT
22 conditions · 5 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure - VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. (Page-14, Para 10.2, Part-I of GCC April 2022). Attached Performa as per Annexure VIB - in Tender Document).
The tenderer should have Electrical contractors License granted by the Govt. Tenderers should submit the copy of these certificate along with the tender document
20 conditions · 11 needing a document upload
1) The tenderer shall be required to submit the Bid Security with the tender for the due performance with the stipulation to keep the offer open till such date as specified in the tender, under the conditions of tender. 2) The Bid Security shall be deposited either in cash through e-payment gateway or submitted as Bank Guarantee bond from a scheduled commercial bank of India or as mentioned in tender documents. The Bank Guarantee bond shall be as per Annexure- VIA and shall be valid for a period of 90 days beyond the bid validity period. (3) In case, submission of Bid Security in the form of Bank Guarantee, following shall be ensured: i. A scanned copy of the Bank Guarantee shall be uploaded on e-Procurement Portal (IREPS) while applying to the tender. ii. The original Bank Guarantee should be delivered in person to the official nominated as indicated in the tender document within 5 working days before closing date for submission of bids(ACS-2 Dated 13.12.2022) iii. Non submission of scanned copy of Bank Guarantee with the bid on e-tendering portal (IREPS) and/or non-submission of original Bank Guarantee within the specified period shall lead to summary rejection of bid. iv. The Tender Security shall remain valid for a period of 90 days beyond the validity period for the Tender. v. The details of the BG, physically submitted should match with the details available in the scanned copy and the data entered during bid submission time, failing which the bid will be rejected. vi. The Bank Guarantee shall be placed in an envelope, which shall be sealed. The envelope shall clearly bear the identification "Bid for the ***** Project" and shall clearly indicate the name and address of the Bidder. In addition, the Bid Due Date should be indicated on the right hand top corner of the envelope. vii. The envelope shall be addressed to the officer and address as mentioned in the tender document. viii. If the envelope is not sealed and marked as instructed above, the Railway assumes no responsibility for the misplacement or premature opening of the contents of the Bid submitted and consequent losses, if any, suffered by the Bidder. (As per Clause 5, Page -4,5,6 Part I GCC April 2022 with ACS-2 Dated 13.12.2022)
Subject to exemptions provided under para 5(1) (a) of Part-1 (ITT) of GCC April 2022, the tender must be accompanied by a Bid Security as mentioned in tender documents, failing which the tender shall be summarily rejected. (Clause 6 (a) Annex -I, Page-11, Part-I of GCC April 2022)
Note: i) Any firm recognized by Department of Industrial Policy and Promotion (DIPP as 'Startups' shall be exempted from payment of Bid Security subject to submission of Registration Certificate issued by appropriate authority. ii) Labour Cooperative Societies shall submit only 50% of Bid Security shall also additionally submit Registration Certificate. (As per Clause 5 , Page-5, Part-I of GCC April 2022)
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Non-compliance with any of the conditions set forth therein above is liable to result in the tender being rejected.
This tender complies with Public Procurement Policy (Make in India) Order, 2017 - Revision dated 16/09/2020, issued by Department of Industrial Promotion and Policy, Ministry of Commerce, circulated vide Railway Board letter no. 2020/RS(G)/779/2/Pt.1 dated 25/09/2020 and amendments / revisions thereof." The full details of the order can be seen at http://dipp.nic.in/whats-new/publicprocurement- preference- make-india-order- 2017. (Authority Railway Boards L. No. 2020/RS(G)/779/2/Pt.1 dated 25-09- 2020)
Contractor is to abide by the provisions of various labour laws in terms of above clause 54, 55, 55-A and 55-B of the Standard General Conditions of Contract. In order to ensure the same, an application has been developed and hosted on website ''www.shramikkalyan.indianrailways.gov.in'. Contractor shall register his firm/ company etc. and upload requisite details of labour and their payment in this portal. These details shall be available in public domain. (Page- 86-89, Part-II of GCC-April 2022)
OHE work in connection with TRR(P)-17.219 TKM & TSR(P)-63.968 TKM on UPL & UPTH line, TRR(P)-7.429 TKM & TSR(P)-65.094 TKM on DNL, DNTH & STA line in Churchgate-Virar Section.
WR-MMCT0ESUBESOT-13-2025
WR-MMCT0ESUBESOT-13-2025
Open
Works - General
18 Months
Mumbai, Maharashtra
₹0
₹2.8 L
30 Apr 2025
3 Apr 2025
71 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 2,54,76,967 | ||
| — | 32.00 | — | — | ||
| Fabrication and supply of Galvanised steel OHE structures as per explanatory notes and technical specifications. | — | — | — | 42,67,584 | |
| — | 32.00 | — | — | ||
| Erection of Galvanised steel OHE structures as per explanatory notes and technical specifications. | — | — | — | 4,38,048 | |
| — | 10.00 | — | — | ||
| Supply of galvanised steel SPS as per explanatory notes and technical specifications. | — | — | — | 13,30,880 | |
| — | 10.00 | — | — | ||
| Erection of galvanised steel SPS as per explanatory notes and technical specifications. | — | — | — | 1,38,550 | |
| — | 180.00 | — | — | ||
| Casting of cement concrete foundation as per explanatory notes and technical specifications.. | — | — | — | 12,73,320 | |
| — | 6.00 | — | — | ||
| Supply guy rod assembly as per explanatory notes and technical specifications. | — | — | — | 62,322 | |
| — | 6.00 | — | — | ||
| Erection of guy rod assembly as per explanatory notes and technical specifications. | — | — | — | 12,618 | |
| — | 30.00 | — | — | ||
| Supply of structure bond as per explanatory notes and technical specifications. | — | — | — | 29,040 | |
| — | 30.00 | — | — | ||
| Erection of structure bond as per explanatory notes and technical specifications. | — | — | — | 9,480 | |
| — | 36.00 | — | — | ||
| Supply of retroreflective Km number plate as per explanatory notes and technical specifications. | — | — | — | 28,404 | |
| — | 1500.00 | — | — | ||
| Supply of 5mm dropper wire as per explanatory notes and technical specifications. | — | — | — | 11,62,500 | |
| — | 8000.00 | — | — | ||
| Supply of dropper clips for contact wire and catenary wire as per explanatory notes and technical specifications. | — | — | — | 38,96,000 | |
| — | 1.00 | — | — | ||
| Erection of complete OHE as per explanatory notes and technical specifications. | — | — | — | 3,65,263 | |
| — | 750.00 | — | — | ||
| Erection of dropper assembly and adjustment of OHE profile as per explanatory notes and technical specifications. | — | — | — | 23,58,750 | |
| — | 30.00 | — | — | ||
| Re-sagging of 242 Sq.mm catenary wire as per explanatory notes and technical specifications. | — | — | — | 22,20,000 | |
| — | 20.00 | — | — | ||
| Re-tensioning of contact wire as per explanatory notes and technical specifications. | — | — | — | 13,60,000 | |
| — | 80.00 | — | — | ||
| Supply of hybrid bracket assembly as per explanatory notes and technical specifications. | — | — | — | 16,17,200 | |
| — | 120.00 | — | — | ||
| Erection of hybrid bracket assembly and load transfer as per explanatory notes and technical specifications. | — | — | — | 9,81,840 | |
| — | 6.00 | — | — | ||
| Supply of termination assembly as per explanatory notes and technical specifications. | — | — | — | 84,786 | |
| — | 20.00 | — | — | ||
| Erection of termination assembly and load transfer as per explanatory notes and technical specifications. | — | — | — | 2,38,200 | |
| — | 6.00 | — | — | ||
| Supply of cut-in insulator as per explanatory notes and technical specifications. | — | — | — | 46,038 | |
| — | 6.00 | — | — | ||
| Erection of cut-in insulator as per explanatory notes and technical specifications. | — | — | — | 9,402 | |
| — | 6.00 | — | — | ||
| Supply of splice for 242/193 Sq.mm OHE as per explanatory notes and technical specifications. | — | — | — | 87,744 | |
| — | 6.00 | — | — | ||
| Erection of splice for 242/193 Sq.mm OHE as per explanatory notes and technical specifications. | — | — | — | 1,32,198 | |
| — | 300.00 | — | — | ||
| Adjustment of bracket assembly for improving OHE profile as per explanatory notes and technical specifications. | — | — | — | 6,84,600 | |
| — | 10.00 | — | — | ||
| Adjustment of OHE at overlap/crossover/turnout as per explanatory notes and technical specifications. | — | — | — | 2,14,560 | |
| — | 5000.00 | — | — | ||
| Supply and Erection of High density polyethylene (HDPE) monofilament netting type III,UV stabilized as per IS 16008(part-2)-2016/PVC virgin HDPE Net as per RDSO Maintenance Instruction No. TI/MI/0050-Rev.1 or latest & as per explanatory notes and technical specifications. | — | — | — | 9,60,000 | |
| — | 500.00 | — | — | ||
| Supply of Anti bird disc made up of poly carbonate material for stay arm, bracket and 9 tonne insulators as per RDSO maintenance instruction No.TI/MI/0059 with latest revision/amendment & as per explanatory notes and technical specifications. | — | — | — | 4,50,000 | |
| — | 500.00 | — | — | ||
| Erection of Anti bird disc made up of poly carbonate material for stay arm, bracket and 9 tonne insulators as per explanatory notes and technical specifications. | — | — | — | 80,500 | |
| — | 18.00 | — | — | ||
| Dismantling of single OHE mast as per explanatory notes and technical specifications. | — | — | — | 1,16,532 | |
| — | 20.00 | — | — | ||
| Dismantling of OHE portal as per explanatory notes and technical specifications. | — | — | — | 1,91,140 | |
| — | 2.00 | — | — | ||
| Dismantling of anchor portal structure as per explanatory notes and technical specifications. | — | — | — | 73,656 | |
| — | 100.00 | — | — | ||
| Dismantling of redundant foundation as per explanatory notes and technical specifications. | — | — | — | 2,61,100 | |
| — | 100.00 | — | — | ||
| Dismantling of cantilever/termination/cut-in insulator assembly as per explanatory notes and technical specifications. | — | — | — | 2,29,400 | |
| — | 16.00 | — | — | ||
| Repairing of platform roof after replacement of OHE structure as per explanatory notes and technical specifications. | — | — | — | 65,312 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TenderdocumentOHE.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .