| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC | ₹4.9 L | L1 | Accepted-AOC the rate was quoted below the estimate rate |
| 2 | L2₹4.9 LRejected-Finance | ₹4.9 L | L2 | Rejected-Finance the rate was quoted above the estimate rate |
| Sl No | Description | Qty | Unit | Varalakshmi L1 | Kalidass L2 |
|---|---|---|---|---|---|
| 1.00Construction of Co-Location Building at Keelaeral village and Panchayat | |||||
| 2.00 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 10.8 | Cum | 263.75 ₹2,848.5 Lowest | 264 ₹2,851.2 |
| 3.00 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 2.98 | Cum | 5,485.75 ₹16,347.54 Lowest | 5,486 ₹16,348.28 |
| 4.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 7.3 | Cum | 9,381.25 ₹68,483.13 Lowest | 9,382 ₹68,488.6 |
| 5.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.73 | Mt | 91,902.5 ₹67,088.83 Lowest | 91,903 ₹67,089.19 |
| 6.00 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) | 69.28 | Sqm | 1,095 ₹75,861.6 Lowest | 1,095 ₹75,861.6 Lowest |
| 7.00 | Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction. | 12.98 | Cum | 6,199 ₹80,463.02 Lowest | 6,200 ₹80,476 |
| 8.00 | Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 119.94 | Sqm | 286 ₹34,302.84 Lowest | 287 ₹34,422.78 |
| 9.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed
to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by 1 the Executive Engineer before use on work. | 15 | Sqm | 308.75 ₹4,631.25 Lowest | 309 ₹4,635 |
| 10.00 | Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers) | 15 | Sqm | 163.5 ₹2,452.5 Lowest | 164 ₹2,460 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
18 Nov 2025, 3:00 pmClosed
BDO(VP)
BDO(VP) Panchayat Union Office Kovilpatti
Construction of Co-Location Building at Kulasekarapuram village and Panchayat
2025_RDTN_623081_1
T1/2808/2025
Open Tender
Civil Works - Buildings
Item Rate
30 days
KOVILPATTI
As Per Schedule
3 documents required · 3 mandatory
₹0
₹5,000
7 Aug 2026
13 Nov 2025
18 Nov 2025
13 Nov 2025
18 Nov 2025
13 Nov 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
BOQ_745053.xls
BOQ • 0.24 MB
COLocationKulasekarapuram.pdf
Tender Documents • 1.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].