| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.3 CrAdmitted-Finance PAC MUKAND VIHAR COLONY RAMGHAT ROAD ALIGARH U P 202001 | ALIGARH | UTTAR PRADESH | 202001 | L1 | Admitted-Finance |
Tender Value
₹2.3 Cr
EMD Value
₹13.4 L
Closing Date
12 Nov 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer Aligarh Circle PWD Aligarh
Office of The SE, Aligarh Circle, P.W.D., Aligarh
Construction of 04 Type-4 (G Plus 3) residences for Executive Engineers in the PWD Colony at Kelanagar, Aligarh district
2026_CEALG_1204483_1
6106/Cashier(C.D.-1 A.)-A.C./26-27 Date 29-10-2026
Open Tender
Civil Works - Buildings
Percentage
180 days
Aligarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹13.4 L
Yes
Office of The SE, Aligarh Circle, P.W.D., Aligarh
23 Nov 2026
2 Nov 2026
12 Nov 2026
2 Nov 2026
12 Nov 2026
2 Nov 2026
10 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegatations grass, bush, wood trees and saplings of girth upto 30cm. Measured at a height of 1 metre above ground level & removal of rubbish upto a distance of 50 metres outside the periphery of area cleared. as per direction of Engineer-in-charge. As per DSR 2023 S.I.-2.31 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) | 400 | Sqm | - | - |
| 2 | Earth work in exacavation in trenches for foundations and for pipes cables etc. in ordinary soil(loam clay or sand) including lift upto 1.5 m and dressing of sides and ramming of bottom sand disposal of surplus excavated earth as directed by the Engineer i/c with in a lead of 50m. as per direction of Engineer-in-charge. As per DSR 2023 S.I.-2.6.1 (A) In all kind of soil upto 1.5m depth (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) | 603.6 | Cum | - | - |
| 3 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. as per direction of Engineer-in-charge. As per D.S.R. Ch 2.25A (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) | 317 | Cum | - | - |
| 4 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.as per direction of Engineer-in-charge. AS Per DSR Ch.-2 SI No.-2.27 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) | 45.14 | Cum | - | - |
| 5 | 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources).as per direction of Engineer-in-charge. AS Per DSR Ch.-4 SI No.-4.1.8 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) | 74.89 | Cum | - | - |
| 6 | Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor With Chlorpyriphos/Lindane E.C. 20% with 1% concentration. as per direction of Engineer-in-charge. AS Per DSR Ch-2, S.I. No.-2.35.3.1. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) | 377.19 | Sqm | - | - |
| 7 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources.[R.C.C. WORK IN FOOTING ]. as per direction of Engineer-in-charge. AS Per DSR Ch-5, S.I. No.-5.1.2 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) | 136.8 | Cum | - | - |
| 8 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand). as per direction of Engineer-in-charge. AS Per DSR Ch-6, S.I. No.-6.1.2 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) | 99.93 | Cum | - | - |
| 9 | R.c.c. work with cement approved coarse sand and 2 cm. (3/4") guage approved stone ballast in the proportion 1:1.5:3,(1cement :1.5corse sand 3 grit) in Lintel excluding supply of reinforcement and its fixing and bending but including its fixing and binding the same necessary with 24 BWG binding wire and excluding necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. AS Per DSR Ch-5, S.I. No.-5.3.1 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) | 243.6 | Cum | - | - |
| 10 | As in item above but in R.C.C. columns in 1:1.5:3 having strength not less than M-20. AS Per DSR Ch-5, S.I. No.-5.2.2 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.) | 45.2 | Cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.55 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.27 MB
BOQ_2281365.xls
BOQ • 1.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .