| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance JAYANT NEAR JAI HIND SCHOOL LAXMI MARKET SINGRAULI 486890 MADHYA PRADESH INDIA | SINGRAULI | MADHYA PRADESH | 486890 | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.6 CrAdmitted-Finance C O VOLTAS LIMITED SPARE PARTS DEPOT OLD HUTMENT COLONY NCL NIGAHI SINGRAULI M P 486884 | SINGRAULI | SINGRAULI | MADHYA PRADESH | 486884 | ₹1.6 Cr | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SARWESHWARI ENTERPRISES L1 | Universal MEP Projects & Engineering Services Limited L2 |
|---|---|---|---|---|---|
| 1.00Scope of Work: Offloading of different Repair & Maintenance work and daily general checking and rectification work, Demounting and Mounting of Engine, Transmission and Torque Converter Assembly of 42 Nos. CAT 789D 190T dumpers for a period of 730 Days (2 years) at NWS Nigahi Project having scope of work as follows- 1. Period: 730 days (a) Repair and Maintenance work and daily general checking and rectification work as per checklist of 42 nos. CAT789D 190T Dumpers fleet for 730 days. (b) Manpower is required in General, First and Second shifts for performing repair and maintenance work and daily general checking and rectification work. (c) Work is to be performed as per periodic maintenance and preventive checklist of sub-assemblies of 42 nos. CAT 789D 190T dumpers. 2. Demounting and mounting of Engine and its related parts of 25 Nos CAT 789D 190T dumpers out of 42 Nos Dumpers as and when required within 730 days ( 02 Years), considering 15 Job s in a Ist year and 10 jobs in 2nd year. 3. Demounting and mounting of Transmission and its related parts of 25 Nos CAT 789D 190T dumpers out of 42 Nos Dumpers as and when required within 730 days ( 02 Years) considering 15 Job s in a Ist year and 10 jobs in 2nd year. 4. Demounting and mounting of Torque Converter and its related parts of 40 Nos CAT 789D 190T dumpers out of 42 Nos Dumpers as and when required within 730 days ( 02 Years) considering 25 Job s in a Ist year and 15 jobs in 2nd year. Note:-Note:-Manpower deployed for subjected job as per scope of work consisting of Highly Skilled ,Semi-skilled and Un- skilled manpower. Also, Highly Skilled ,Semi-skilled manpower should have ITI qualification and the same shall be verified. Maximum likely workman to be deployed per days : 30 nos. ( 04 Nos. Highly Skilled Supervisor, 18 Nos. Semi-skilled and 08 Nos. Unskilled manpower) | |||||
| 2.00Repair and Maintenance work and Daily General Checking and Rectification work as per checklists of CAT 789D 190T dumpers. Maximum likely manpower to be deployed: 08 per shift (01 No Highly Skilled supervisor, 03 Nos. Semi-skilled fitter ,01 No. Semi-Skilled Welder , 01 No. Semi-Skilled Electrician and 02 Nos. Unskilled) for First Shift , Second Shift and General shift ( Three shift) | |||||
| 2.01 | Cost/charges for Repair and Maintenance work and Daily General Checking and Rectification work in FIRST SHIFT as per checklists of CAT 789D 190T dumpers including labour charges , contractor profit ,etc. ( labour consisting of 01 No Highly Skilled supervisor, 03 Nos. Semi-skilled fitter ,01 No. Semi-Skilled Welder , 01 No. Semi-Skilled Electrician and 02 Nos. Unskilled) | 730 | days | 5,498 ₹40.1 L | 5,600 ₹40.9 L |
| 2.02 | Cost/charges for Repair and Maintenance work and Daily General Checking and Rectification work in GENERAL SHIFT as per checklists of CAT 789D 190T dumpers including labour charges , contractor profit ,etc. (labour consisting of 01 No Highly Skilled supervisor, 03 Nos. Semi-skilled fitter ,01 No. Semi-Skilled Welder , 01 No. Semi-Skilled Electrician and 02 Nos. Unskilled) | 730 | days | 5,498 ₹40.1 L | 5,600 ₹40.9 L |
| 2.03 | Cost/charges for Repair and Maintenance work and Daily General Checking and Rectification work in SECOND SHIFT as per checklists of CAT 789D 190T dumpers including labour charges , contractor profit ,etc. (labour consisting of 01 No Highly Skilled supervisor, 03 Nos. Semi-skilled fitter ,01 No. Semi-Skilled Welder , 01 No. Semi-Skilled Electrician and 02 Nos. Unskilled) | 730 | days | 5,498 ₹40.1 L | 5,600 ₹40.9 L |
| 2.04 | Cost/charges for 3 set Tools & Tackles per day for all the above jobs of Sl No. 2. | 730 | job | 300 ₹2.2 L | 280 ₹2.0 L |
| 3.00Demounting and Mounting of Engine and its related parts of 25 nos. CAT 789D 190T dumpers , Maximum likely manpower for each job to be deployed: 06 Nos. Manpower (01 No Highly Skilled Supervior , 02 Nos. Semi-skilled fitter ,01 No. Semi-Skilled Electrician and 02 Nos. Unskilled ) | |||||
| 3.01 | Cost/charges for demounting of Engine assy and its related parts for CAT 789D 190T dumper including labour charges , contractor profit ,etc. (labour consisting of Highly Skilled Supervisor, Semi-skilled fitter, Semi-Skilled Electrician and unskilled manpower) , Total 25 jobs | 25 | job | 24,638 ₹6.2 L | 25,000 ₹6.3 L |
| 3.02 | Cost / Charges for Tools and Tackles for all jobs at Sl no 3.01 | 25 | job | 300 ₹7,500 | 280 ₹7,000 |
| 3.03 | Cost/charges for mounting of Engine assy and its related parts for. CAT 789D 190T dumper for CAT 789D 190T dumper including labour charges , contractor profit ,etc. (labour consisting of Highly Skilled Supervisor, Semi-skilled fitter, Semi-Skilled Electrician and unskilled manpower) , Total 25 jobs | 25 | job | 24,638 ₹6.2 L | 25,000 ₹6.3 L |
Updated dates
Tender Value
₹1.9 Cr
EMD Value
₹2.4 L
Closing Date
9 Mar 2026, 11:00 amClosed
GM(EXCV)NCL, NIGAHI PROJECT
OFFICE OF GENERAL MANAGER (EXCV) NCL, NIGAHI PROJECT, PO-NIGAHI, DISTT-SINGRAULI (MP) - 486884
Offloading of different Repair , Maintenance work and daily general checking and rectification work, Demounting and Mounting of Engine, Transmission and Torque Converter Assembly of 42 Nos. CAT 789D 190T dumpers for a period of 730 Days (2 years) at
2026_NCL_353051_1
NGH/EXCV/TENDERS/25-26/092
Open Tender
Excavation Department Work
730 days
NCL NIGAHI PROJECT
AS PER NIT
5 documents required · 5 mandatory
₹2.4 L
6 May 2026
13 Feb 2026
10 Mar 2026
13 Feb 2026
9 Mar 2026
14 Feb 2026
13 Feb 2026 - 23 Feb 2026
Scope of Work: Offloading of different Repair & Maintenance work and daily general checking and rectification work, Demounting and Mounting of Engine, Transmission and Torque Converter Assembly of 42 Nos. CAT 789D 190T dumpers for a period of 730 Days (2 years) at NWS Nigahi Project having scope of work as follows- 1. Period: 730 days (a) Repair and Maintenance work and daily general checking and rectification work as per checklist of 42 nos. CAT789D 190T Dumpers fleet for 730 days. (b) Manpower is required in General, First and Second shifts for performing repair and maintenance work and daily general checking and rectification work. (c) Work is to be performed as per periodic maintenance and preventive checklist of sub-assemblies of 42 nos. CAT 789D 190T dumpers. 2. Demounting and mounting of Engine and its related parts of 25 Nos CAT 789D 190T dumpers out of 42 Nos Dumpers as and when required within 730 days ( 02 Years), considering 15 Job s in a Ist year and 10 jobs in 2nd year. 3. Demounting and mounting of Transmission and its related parts of 25 Nos CAT 789D 190T dumpers out of 42 Nos Dumpers as and when required within 730 days ( 02 Years) considering 15 Job s in a Ist year and 10 jobs in 2nd year. 4. Demounting and mounting of Torque Converter and its related parts of 40 Nos CAT 789D 190T dumpers out of 42 Nos Dumpers as and when required within 730 days ( 02 Years) considering 25 Job s in a Ist year and 15 jobs in 2nd year. Note:-Note:-Manpower deployed for subjected job as per scope of work consisting of Highly Skilled ,Semi-skilled and Un- skilled manpower. Also, Highly Skilled ,Semi-skilled manpower should have ITI qualification and the same shall be verified. Maximum likely workman to be deployed per days : 30 nos. ( 04 Nos. Highly Skilled Supervisor, 18 Nos. Semi-skilled and 08 Nos. Unskilled manpower)
Repair and Maintenance work and Daily General Checking and Rectification work as per checklists of CAT 789D 190T dumpers. Maximum likely manpower to be deployed: 08 per shift (01 No Highly Skilled supervisor, 03 Nos. Semi-skilled fitter ,01 No. Semi-Skilled Welder , 01 No. Semi-Skilled Electrician and 02 Nos. Unskilled) for First Shift , Second Shift and General shift ( Three shift)
Cost/charges for Repair and Maintenance work and Daily General Checking and Rectification work in FIRST SHIFT as per checklists of CAT 789D 190T dumpers including labour charges , contractor profit ,etc. ( labour consisting of 01 No Highly Skilled supervisor, 03 Nos. Semi-skilled fitter ,01 No. Semi-Skilled Welder , 01 No. Semi-Skilled Electrician and 02 Nos. Unskilled)
Cost/charges for Repair and Maintenance work and Daily General Checking and Rectification work in GENERAL SHIFT as per checklists of CAT 789D 190T dumpers including labour charges , contractor profit ,etc. (labour consisting of 01 No Highly Skilled supervisor, 03 Nos. Semi-skilled fitter ,01 No. Semi-Skilled Welder , 01 No. Semi-Skilled Electrician and 02 Nos. Unskilled)
Cost/charges for Repair and Maintenance work and Daily General Checking and Rectification work in SECOND SHIFT as per checklists of CAT 789D 190T dumpers including labour charges , contractor profit ,etc. (labour consisting of 01 No Highly Skilled supervisor, 03 Nos. Semi-skilled fitter ,01 No. Semi-Skilled Welder , 01 No. Semi-Skilled Electrician and 02 Nos. Unskilled)
Cost/charges for 3 set Tools & Tackles per day for all the above jobs of Sl No. 2.
Demounting and Mounting of Engine and its related parts of 25 nos. CAT 789D 190T dumpers , Maximum likely manpower for each job to be deployed: 06 Nos. Manpower (01 No Highly Skilled Supervior , 02 Nos. Semi-skilled fitter ,01 No. Semi-Skilled Electrician and 02 Nos. Unskilled )
Cost/charges for demounting of Engine assy and its related parts for CAT 789D 190T dumper including labour charges , contractor profit ,etc. (labour consisting of Highly Skilled Supervisor, Semi-skilled fitter, Semi-Skilled Electrician and unskilled manpower) , Total 25 jobs
Cost / Charges for Tools and Tackles for all jobs at Sl no 3.01
Cost/charges for mounting of Engine assy and its related parts for. CAT 789D 190T dumper for CAT 789D 190T dumper including labour charges , contractor profit ,etc. (labour consisting of Highly Skilled Supervisor, Semi-skilled fitter, Semi-Skilled Electrician and unskilled manpower) , Total 25 jobs
Cost / Charges for Tools and Tackles for all jobs at Sl no 3.03
Demounting and Mounting of Transmission and its related parts of 25 nos. CAT 789D 190T dumpers ,Maximum likely manpower for each job to be deployed: 06 Nos. Manpower (01 No Highly Skilled Supervior , 02 Nos. Semi-skilled fitter ,01 No. Semi-Skilled Electrician and 02 Nos. Unskilled )
Cost/charges for demounting of Transmission assy and its related parts for CAT 789D 190T dumper including labour charges , contractor profit ,etc. (labour consisting of Highly Skilled Supervisor, Semi-skilled fitter, Semi-Skilled Electrician and unskilled manpower) , Total 25 jobs
Cost / Charges for Tools and Tackles for all jobs at Sl no 4.01
Cost/charges for mounting of Transmission assy and its related parts for CAT 789D 190T dumper including labour charges , contractor profit ,etc. (labour consisting of Highly Skilled Supervisor, Semi-skilled fitter, Semi-Skilled Electrician and unskilled manpower) , Total 25 jobs
Cost / Charges for Tools and Tackles for all jobs at Sl no 4.03
Demounting and Mounting of Torque Converter and its related parts of 40 nos. CAT789D 190Tdumpers , Maximum likely manpower for each job to be deployed: 06 Nos. Manpower (01 No Highly Skilled Supervior , 02 Nos. Semi-skilled fitter ,01 No. Semi-Skilled Electrician and 02 Nos. Unskilled )
Cost/charges for demounting of Torque Converter assy and its related parts for CAT 789D 190T dumper including labour charges , contractor profit ,etc. (labour consisting of Highly Skilled Supervisor, Semi-skilled fitter, Semi-Skilled Electrician and unskilled manpower) , Total 40 jobs
Cost / Charges for Tools and Tackles for all jobs at Sl no 5.01
Cost/charges for mounting of Torque Converter assy and its related parts for CAT 789D 190T dumper including labour charges , contractor profit ,etc. (labour consisting of Highly Skilled Supervisor, Semi-skilled fitter, Semi-Skilled Electrician and unskilled manpower) , Total 40 jobs
Cost / Charges for Tools and Tackles for all jobs at Sl no 5.03
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 3.96 MB
ANNEXURESANDOTHERIMPORTENTDOCUMENT.pdf
Tender Documents • 0.27 MB
BOQ_365848.xls
BOQ • 0.24 MB
UNDERTAKINGASPERANNEXURE-II.pdf
Tender Documents • 0.08 MB
Download all tender documents and submit your bid