Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 LAdmitted-Fee/PreQual/Technical/Finance | ₹10.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | R.S.S.ENTERPRISES L1 |
|---|---|---|---|---|
| 1.00Sweeping and mopping | ||||
| 1.01 | weeping and mopping of the office floors (Flooring with ceramic / marble / granite tiles) steps, staircases, handrails with scented cleaning agents including clearing and disposal of waste papers daily, Dusting and cleaning of files records in racks, furnitures for twice in a week, cleaning of the partition walls, ceilings [Brick, Wooden & Aluminum, Glazed] Staircase, hand rails, doors, windows, blinds, Name boards,Electrical fittings viz. Tubé Lights, fans, Electrical fixtures, switch boxes etc, removal of cobweb once in a month collecting and disposing all the waste to outside of the Office complex, with all general cleaning inside the office Floors etc... complete as directed by the Engineer at site induding the cost of all labour, labour uniforms, lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets, Swabs, Mops, Dungry cloth, Buckets, cost of all consumables etc. complete. | 8,13,556.12 | 1 m2 | 7,56,607.19 ₹8,92,796.48 Lowest |
| 1.02 | Sweeping and mopping of the office clear space, lobby such as Cash collection center, low roofed repair bay (Flooring with cement mortar)steps,staircases, handrails with scented cleaning agentsincluding clearing and disposal of waste papers and debris daily, cleaning of all partition walls, ceilings [Brick, Wooden & Aluminum,blinds, Name boards,Electrical fittings viz. Tube Lights, fans, Glazed], Staircase, hand rails, doors, windows, Electrical fixtures, switch boxes etc, removal of cobweb once in a month collecting and disposing all the waste to outside of the Office complex, with all general cleaning inside the office Floors etc… complete as directed by the Engineer at site including the cost of all labour, labour uniforms lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets, Swabs, Mops, Dungry cloth, Buckets and cost of all consumables etc. complete. | 17,693.4 | 1 m2 | 7,962.03 ₹9,395.2 Lowest |
| 1.03 | Sweeping of open areas around Office buildings, collection and removal of garbage and wastes from campus to outside office complex daily, all general outdoor cleaning with sprinkling of water, including removal of weeds and unwanted materials as directed by the Engineer at site including the cost of all labour, labour uniforms lead, lift, T&P, cost of all materials such as coconut brooms, Bamboo baskets,cost of all consumables etc. | 86,636.01 | 1 m2 | 17,327.2 ₹20,446.1 Lowest |
| 2.00Maintenance charges for cleaning the wash basins, water closets, urinals and floor and wall tiles by spraying of disinfectant and placing camphor balls and urinal scented screen in the urinals and wash basins, sweeping and cleaning the floor surface and side wall surface, gratings, neatly cleaning the sanitary duct, removing dirt/refuge and cobwebs and sweeping away the stagnated water at periodic intervals, including carrying out of other miscellaneous works during lean hours as directed by the Engineer incharge including materials for cleaning except phenyl. The toilet should always be clean, neat and tidy without any odur or foul smell (1 time in a day). | ||||
| 2.01 | Toilet floors ( includes cleaning of wall tiles & doors / ventilators, removal of cobweb) 113.10*12*25 | 33,930 | 1 m2 | 33,930 ₹40,037.4 Lowest |
| 2.02 | Water closets (IWC / EWC) (20*12*25) | 6,000 | Each | 10,200 ₹12,036 Lowest |
| 2.03 | Urinals cleaning & providing scented urinal screen, coloured naphthalene balls (7*12*25) | 2,100 | Each | 4,200 ₹4,956 Lowest |
| 2.04 | Washbasins (20*12*25) | 6,000 | Each | 12,000 ₹14,160 Lowest |
| 3.01 | Anti Termite Spraying using Chemical emulsion chloropyrifos 20% EC mixed with water will be sprayed at the ratio of 1:19 for 5 Litres mixed solution per 100 m2 once in 3 months to control Termite, Cockroaches, mites, Silver Fish, Cloth Moth, Spider, Ants etc., wooden portions will be mixed with concentrated chemicals or with Kerosene and as mixed with concentrated chamicals with Kerosene and, as directed by the engineer at site (4 operations per year) | 2,272.36 | 1 m2 | 1,136.18 ₹1,340.69 Lowest |
Tender Value
Refer Docs
EMD Value
₹12,500
Closing Date
10 Aug 2026, 3:00 pmClosed
SE/O/N/CNI
SE/Operation/North/Chennai, 230kV Korattur SS Campus, Chennai-80
Housekeeping of office floors and cleaning of toilets, open areas and allied maintenance works at 400/230-110kV KORATTUR GIS SS for a period of one year
2026_EB_688298_1
E01/2026-2027/SE/O/N/CNI
Open Tender
Maintenance Works
Works
365 days
400 kV Korattur GIS
Please refer the specification
4 documents required · 4 mandatory
₹0
₹12,500
Yes
19 Aug 2026
24 Jul 2026
11 Aug 2026
25 Jul 2026
10 Aug 2026
1 Aug 2026
25 Jul 2026 - 29 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Sweeping and mopping | |||||
| 1.01 | weeping and mopping of the office floors (Flooring with ceramic / marble / granite tiles) steps, staircases, handrails with scented cleaning agents including clearing and disposal of waste papers daily, Dusting and cleaning of files records in racks, furnitures for twice in a week, cleaning of the partition walls, ceilings [Brick, Wooden & Aluminum, Glazed] Staircase, hand rails, doors, windows, blinds, Name boards,Electrical fittings viz. Tubé Lights, fans, Electrical fixtures, switch boxes etc, removal of cobweb once in a month collecting and disposing all the waste to outside of the Office complex, with all general cleaning inside the office Floors etc... complete as directed by the Engineer at site induding the cost of all labour, labour uniforms, lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets, Swabs, Mops, Dungry cloth, Buckets, cost of all consumables etc. complete. | 8,13,556.12 | 1 m2 | - | - |
| 1.02 | Sweeping and mopping of the office clear space, lobby such as Cash collection center, low roofed repair bay (Flooring with cement mortar)steps,staircases, handrails with scented cleaning agentsincluding clearing and disposal of waste papers and debris daily, cleaning of all partition walls, ceilings [Brick, Wooden & Aluminum,blinds, Name boards,Electrical fittings viz. Tube Lights, fans, Glazed], Staircase, hand rails, doors, windows, Electrical fixtures, switch boxes etc, removal of cobweb once in a month collecting and disposing all the waste to outside of the Office complex, with all general cleaning inside the office Floors etc… complete as directed by the Engineer at site including the cost of all labour, labour uniforms lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets, Swabs, Mops, Dungry cloth, Buckets and cost of all consumables etc. complete. | 17,693.4 | 1 m2 | - | - |
| 1.03 | Sweeping of open areas around Office buildings, collection and removal of garbage and wastes from campus to outside office complex daily, all general outdoor cleaning with sprinkling of water, including removal of weeds and unwanted materials as directed by the Engineer at site including the cost of all labour, labour uniforms lead, lift, T&P, cost of all materials such as coconut brooms, Bamboo baskets,cost of all consumables etc. | 86,636.01 | 1 m2 | - | - |
| 2Maintenance charges for cleaning the wash basins, water closets, urinals and floor and wall tiles by spraying of disinfectant and placing camphor balls and urinal scented screen in the urinals and wash basins, sweeping and cleaning the floor surface and side wall surface, gratings, neatly cleaning the sanitary duct, removing dirt/refuge and cobwebs and sweeping away the stagnated water at periodic intervals, including carrying out of other miscellaneous works during lean hours as directed by the Engineer incharge including materials for cleaning except phenyl. The toilet should always be clean, neat and tidy without any odur or foul smell (1 time in a day). | |||||
| 2.01 | Toilet floors ( includes cleaning of wall tiles & doors / ventilators, removal of cobweb) 113.10*12*25 | 33,930 | 1 m2 | - | - |
| 2.02 | Water closets (IWC / EWC) (20*12*25) | 6,000 | Each | - | - |
| 2.03 | Urinals cleaning & providing scented urinal screen, coloured naphthalene balls (7*12*25) | 2,100 | Each | - | - |
| 2.04 | Washbasins (20*12*25) | 6,000 | Each | - | - |
| 3.01 | Anti Termite Spraying using Chemical emulsion chloropyrifos 20% EC mixed with water will be sprayed at the ratio of 1:19 for 5 Litres mixed solution per 100 m2 once in 3 months to control Termite, Cockroaches, mites, Silver Fish, Cloth Moth, Spider, Ants etc., wooden portions will be mixed with concentrated chemicals or with Kerosene and as mixed with concentrated chamicals with Kerosene and, as directed by the engineer at site (4 operations per year) | 2,272.36 | 1 m2 | - | - |
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
Tendernotice_2.pdf
PDF • 0.37 MB
Tendernotice_3.pdf
PDF • 0.11 MB
BOQ_827394.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].