| Sl No | Description | Qty | Unit | BINDHU ENTERPRISES L1 | STEBY ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for Strengthening of weak welding joints of step grills & platform grills from 0 Mtr to 52 Mtr elevation | 950 | Mtr. | 1,59,600 ₹1.9 L | 1,66,250 ₹2.0 L |
| 2.00 | Charges for providing temporary platforms at required elevation of non approaching area in boiler and dismantling after attending work. | 4 | No. | 10,472 ₹12,356.96 | 10,800 ₹12,744 |
| 3.00 | Charges for cutting and removal of corroded/damaged structural platforms, supports, etc and devolution to central stores. | 500 | Kg. | 6,335 ₹7,475.30 | 6,835 ₹8,065.30 |
| 4.00 | Charges for fabrication and erection of platforms at various locations of boiler with proper supports and hand rails with Iron & Steel materials, grills (or) modifying the existing approach platforms by cutting and re-erecting, for a safe movement of men and material. This work includes all required consumables (such as gas, welding electrodes, grinding stones & cotton waste etc.,) and T&P’s (such as welding machine, cutting set, grinding machine, ropes and slings etc.,) | 5,000 | Kg. | 2,10,000 ₹2.5 L | 2,50,000 ₹3.0 L |
| 5.00 | Charges for re-routing of 410NB Ash Slurry pipe, including all required consumables such as welding electrode, cutting gas, slings, ropes, gloves, helmet, etc & T&P’s such as cutting set, grinding machine, welding generator, etc. (410 OD Joint) | 15 | No. | 1,23,210 ₹1.5 L | 1,24,500 ₹1.5 L |
| 6.00 | Charges for Welding joint Upto 200 NB CS welding joint (150 NB) | 2 | No. | 4,980 ₹5,876.40 | 5,200 ₹6,136 |
Tender Value
Refer Docs
EMD Value
₹4,900
Closing Date
8 Dec 2025, 2:00 pmClosed
CE/ TTPS
Chief Engineer, Tuticorin Thermal Power Station, Tuticorin
TTPS Mech II BM Unit I Strengthening of weak welding joints of step grills platform grills renewal of damaged corroded structurals from 0 Mtr to 52 Mtr elevation and re routing of ash disposal pipe line of Unit I Boiler
2025_EB_625411_1
CE/TTPS/SE/M-II/No.301/2025-26
Open Tender
Miscellaneous Works
30 days
TTPS
As per BQR conditions in NIT
8 documents required · 8 mandatory
₹0
₹4,900
Yes
25 Mar 2026
21 Nov 2025
9 Dec 2025
21 Nov 2025
8 Dec 2025
21 Nov 2025
Charges for Strengthening of weak welding joints of step grills & platform grills from 0 Mtr to 52 Mtr elevation
Charges for providing temporary platforms at required elevation of non approaching area in boiler and dismantling after attending work.
Charges for cutting and removal of corroded/damaged structural platforms, supports, etc and devolution to central stores.
Charges for fabrication and erection of platforms at various locations of boiler with proper supports and hand rails with Iron & Steel materials, grills (or) modifying the existing approach platforms by cutting and re-erecting, for a safe movement of men and material. This work includes all required consumables (such as gas, welding electrodes, grinding stones & cotton waste etc.,) and T&P’s (such as welding machine, cutting set, grinding machine, ropes and slings etc.,)
Charges for re-routing of 410NB Ash Slurry pipe, including all required consumables such as welding electrode, cutting gas, slings, ropes, gloves, helmet, etc & T&P’s such as cutting set, grinding machine, welding generator, etc. (410 OD Joint)
Charges for Welding joint Upto 200 NB CS welding joint (150 NB)
STEBY ENTERPRISES (BID ID -1528856)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_747878.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid