Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹72,750Accepted-AOC | l1 | Accepted-AOC Accepted | |
| 2 | l2₹74,750+₹2,000 (2.75%)Rejected-Finance | l2 | Rejected-Finance Reject |
Tender Value
₹1 L
EMD Value
₹1,000
Closing Date
28 Oct 2024, 3:00 pmClosed
COMMISSIONER TAMBARAM CITY MUNICIPAL CORPORATION
COMMISSIONER TAMBARAM CITY MUNICIPAL CORPORATION
Providing and Laying of PVC Pipe line at Rajaji 2nd cross, in ward No.59 in zone 4 TCMC Corporation
2024_MAWS_496007_34
333/2024/E1 Z-4
Open Tender
Civil Works
Works
60 days
TAMBARAM CITY MUNICIPAL CORPORATION ZONE-4
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1,000
4 Feb 2025
24 Oct 2024
28 Oct 2024
24 Oct 2024
28 Oct 2024
24 Oct 2024
Earth work in all soils Hard stiff clay, stiff black cotton, hard red earth, shales, murram gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil.SS20B and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Supplying and filling the foundation and basement with stone dust in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification.
Supply and Delivery of PVC PIPES FOR POTABLE WATER SUPPLY AS PER IS 4985 /2000 including cost and conveyance of materials and all labour charges etc complete
110mm dia PVC 6KSC Pipe
Supply and Delivery of Following PVC Specials,inlet, outlet, scour and overflow etc, etc., complete as per Standard Specifications
110 PVC Elbow
110 PVC Coupler
110 PVC Bend
110 PVC tee
110 PVC End Cap
Lowering of PVC Pipes and Specials in the trenches and laying to proper grade and alignment and as directed by the TWAD Officers.
Supply and Delivery of Cost Iron Double Flanged sluice valve with cap/ wheel etc., complete and as directed by TWAD Board officers.
Labour Charges for Fixing Sluice valve including fixing labour charges and jointing materials as per complete standard specification
Construction of Valve Pit for Flow meter and sluice valve fixing including cost and conveyance of all materials and other labour charges
Refilling the Excavated earth including leveling and compacting and other labour charges complete
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .