Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.4 LAdmitted-Fee/PreQual/Technical/Finance | -29.51% | ₹4.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹4.6 LAdmitted-Fee/PreQual/Technical/Finance | -26.30% | ₹4.6 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹4.7 LAdmitted-Fee/PreQual/Technical/Finance | -25.00% | ₹4.7 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹4.7 LAdmitted-Fee/PreQual/Technical/Finance | -24.99% | ₹4.7 L | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹6.5 LAdmitted-Fee/PreQual/Technical/Finance | +5.00% | ₹6.5 L | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹6.2 L
EMD Value
₹12,431
Closing Date
20 Aug 2026, 6:00 pmClosed
EE WR Division Karauli
EE WR Division Karauli
Watch and ward of Ateva Dam district karauli year 2026 27
2026_WRDAS_588530_2
NIT 04/2026-27
Open Tender
Civil Works
Percentage
90 days
under jurisdiction of EE Karauli Division
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
as per nit
₹12,431
Yes
21 Aug 2026
15 Aug 2026
21 Aug 2026
15 Aug 2026
20 Aug 2026
15 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Oiling, Greasing work of gate parts like Headstock, Headstock parts, Roller Assembly, Operating Rod, Sealing Frame, Guide Tee with all Labor tools and tackles etc. and Material for vertical lift sliding type/ fix wheel gates excluding cardium compund and gear oil For gates size up to 1.0 m x 1.0m | 4 | Each | 1,405.08 | ₹5,620.32 |
| 2 | Supply and fixing of sluice/regulator gates for canal using MS plates, channels, tees, angles, girders etc. of given size and design having suitable brass/gunmetal lining, rubber seals etc. and desired rod length, capstan head, clamps keys, hoisting plateform, ladders, supports, etc. complete (excluding civil works) including painting with zinc rich primer& epoxy paint & delivery at site. | 400 | kg | 122.88 | ₹49,152 |
| 3 | Labour charges for fixing sluice gate including rod clamps & headposts etc.complete for new & old tanks.Gate size up to 1 sqm | 4 | Each | 1,775.42 | ₹7,101.68 |
| 4 | Demolishing stone rubble masonry including stacking of usable material and disposal of unuseable material within 50 meters lead inclusive of de-watering wherever required.In cement mortar | 1.08 | Cum | 489 | ₹528.12 |
| 5 | Providing and laying cement concrete coping in (1:2:4) with maximum size of crusher broken aggregate upto 20 mm including shuttering etc. with all leads of material complete in all respect in thickness of: 50 mm | 5.4 | Sqm | 320 | ₹1,728 |
| 6 | Supplying of well stitched earth filled bags of capacity, weigh not less than 40 kg per bag at site etc. complete. Plastic bag | 5,838 | Each | 16 | ₹93,408 |
| 7 | Labour charges for making coffer dam/ring bund (under flowing / stagnate water pool) by loading transporting earth filled cement bags dropping at required locations in water including lead up to 3 km and lift up to 8 meter from NSL complete (excluding cost of earth filled cement bags). | 5,838 | bag | 26 | ₹1,51,788 |
| 8 | Providing, laying and fixing in position RCC spun or hume pipe with collars (ISI 458-2003) in required size packed in gasket for hume or spun yarn & neatly finished with rich grout of cement mortar 1:3 perfectly air tight including testing of joints. 600mm NP3 | 7.5 | RM | 3,098 | ₹23,235 |
| 9 | Providing, laying and fixing in position RCC spun or hume pipe with collars (ISI 458-2003) in required size packed in gasket for hume or spun yarn & neatly finished with rich grout of cement mortar 1:3 perfectly air tight including testing of joints. 600mm Labour Charges only | 7.5 | RM | 231 | ₹1,732.5 |
| 10 | Patrolling and Watch and ward of dam with Mobile phones (with recharges pack) for communicating with site incharge or control room including T and P | 168 | P.Km per day | 990 | ₹1,66,320 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
BOQ_1045108.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].