Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.9 LAdmitted-Finance | ₹13.9 L | L1 | Admitted-Finance |
| 2 | L2₹15.0 L+₹1.1 L (7.60%)Admitted-Finance | ₹15.0 L+₹1.1 L (7.60%) | L2 | Admitted-Finance |
| 3 | L3₹16.2 L+₹2.3 L (16.4%)Admitted-Finance | ₹16.2 L+₹2.3 L (16.4%) | L3 | Admitted-Finance |
| 4 | L4₹17.0 L+₹3.0 L (21.9%)Admitted-Finance | ₹17.0 L+₹3.0 L (21.9%) | L4 | Admitted-Finance |
| 5 | L5₹19.8 L+₹5.9 L (42.3%)Admitted-Finance | ₹19.8 L+₹5.9 L (42.3%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | IMRAN ELECTRICALS AND SUPPLIERS L4 | ITOO INFRASTRUCTURE L3 | M/S M.H Electricals L5 | M/S Basit Electrical L2 | F Z ELECTRICALS L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00Renovation and Maintenance of Distribution Substations within the jurisdiction of ED Kulgam | ||||||||
| 1.01 | Supply, Erection, testing & commissioning of S.T Pole 9mtr Long SP-33 with base plate & cap for HT. Strictly as per REC standards | 22 | Nos | 21,000 ₹4,62,000 | 17,000 ₹3,74,000 | 20,000 ₹4,40,000 | 17,000 ₹3,74,000 | 16,486 ₹3,62,692 Lowest |
| 1.02 | Supply , Erection, testing & commissioning of S.T Pole 8mtr Long SP-15 with base plate & cap for LT. Strictly as per REC standards | 2 | Nos | 16,000 ₹32,000 | 15,000 ₹30,000 | 19,000 ₹38,000 | 13,000 ₹26,000 | 11,111 ₹22,222 Lowest |
| 1.03 | Providing and fixing of GI Channels, clamps etc of sizes | 2,980 | Kgs | 100 ₹2,98,000 Lowest | 120 ₹3,57,600 | 150 ₹4,47,000 | 134 ₹3,99,320 | 126 ₹3,75,480 |
| 1.04 | Supplying and fixing of pole Earthing Complete by GI Pipe 40 mm 2.5 mtr long through GI Strip(25x3 mm) to each pole | 2 | Nos | 800 ₹1,600 | 1,000 ₹2,000 | 1,500 ₹3,000 | 500 ₹1,000 Lowest | 511 ₹1,022 |
| 1.05 | Painting of poles with one coat of red oxide and two coats of Aluminium paint as per Standards. This also includes numbering of ploes with paint, submission of Pre and Post Execution photographs duly anthenticated by AEE concrened. | 24 | Nos | 500 ₹12,000 | 300 ₹7,200 | 1,000 ₹24,000 | 148.7 ₹3,568.8 | 111 ₹2,664 Lowest |
| 1.06 | Supply,fixing, testing & commissioning of 11KV GO Set, AB Switch as per IS Standards | 13 | Set | 15,000 ₹1,95,000 | 11,000 ₹1,43,000 | 15,000 ₹1,95,000 | 11,000 ₹1,43,000 | 8,800 ₹1,14,400 Lowest |
| 1.07 | Supply,fixing, testing & commissioning of 11KV LA Set Gap less as per IS Standards | 13 | Set | 8,000 ₹1,04,000 | 8,000 ₹1,04,000 | 5,000 ₹65,000 | 4,000 ₹52,000 | 3,700 ₹48,100 Lowest |
| 1.08 | Supply,fixing, testing & commissioning of 11KV DO Fuse Set as per IS Standards | 13 | Set | 8,000 ₹1,04,000 | 9,000 ₹1,17,000 | 4,500 ₹58,500 | 3,800 ₹49,400 | 3,700 ₹48,100 Lowest |
| 1.09 | Supply,fixing, testing & commissioning of 11KV Pin Polymer Insulators with GI pins complete. | 39 | Nos | 200 ₹7,800 | 300 ₹11,700 | 300 ₹11,700 | 210 ₹8,190 | 190 ₹7,410 Lowest |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
14 Jul 2026, 1:00 pmClosed
EXECUTIVE ENGINEER ED KUGLAM
EXECUTIVE ENGINEER ED KUGLAM
R and M of Distribution Transformers under UT Capex 2026 27
2026_PDD_313644_1
EDK/e-tender/15 of 2025-26
Open Tender
Electrical Works
Turn-key
120 days
KULGAM
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
EXECUTIVE ENGINEER ED KUGLAM
₹40,000
Yes
15 Jul 2026
25 Jun 2026
15 Jul 2026
25 Jun 2026
14 Jul 2026
25 Jun 2026
25 Jun 2026 - 3 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Renovation and Maintenance of Distribution Substations within the jurisdiction of ED Kulgam | |||||
| - | Supply, Erection, testing & commissioning of S.T Pole 9mtr Long SP-33 with base plate & cap for HT. Strictly as per REC standards | - | Nos | 21,500 | - |
| 1.02 | Supply , Erection, testing & commissioning of S.T Pole 8mtr Long SP-15 with base plate & cap for LT. Strictly as per REC standards | - | Nos | 21,501 | - |
| 1.03 | Providing and fixing of GI Channels, clamps etc of sizes | - | Kgs | 21,502 | - |
| 1.04 | Supplying and fixing of pole Earthing Complete by GI Pipe 40 mm 2.5 mtr long through GI Strip(25x3 mm) to each pole | - | Nos | 21,503 | - |
| - | Painting of poles with one coat of red oxide and two coats of Aluminium paint as per Standards. This also includes numbering of ploes with paint, submission of Pre and Post Execution photographs duly anthenticated by AEE concrened. | - | Nos | 21,504 | - |
| - | Supply,fixing, testing & commissioning of 11KV GO Set, AB Switch as per IS Standards | - | Set | 21,505 | - |
| - | Supply,fixing, testing & commissioning of 11KV LA Set Gap less as per IS Standards | - | Set | 21,506 | - |
| - | Supply,fixing, testing & commissioning of 11KV DO Fuse Set as per IS Standards | - | Set | 21,507 | - |
| - | Supply,fixing, testing & commissioning of 11KV Pin Polymer Insulators with GI pins complete. | - | Nos | 21,508 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
SBD.pdf
Tender Documents • 1.01 MB
BOQ_1015290.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .