Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAdmitted-Finance PLOT NO 46 SUGANDHA VIHAR NEAR NEW ERA PROGRASSIVE SCHOOL RAMPUR DIST KORBA 495677 | KORBA | CHHATTISGARH | 495677 | ₹1.8 L | L1 | Admitted-Finance |
| 2 | L2₹2.3 L+₹46,750 (26.2%)Admitted-Finance | ₹2.3 L+₹46,750 (26.2%) | L2 | Admitted-Finance |
| 3 | L3₹3.0 L+₹1.2 L (66.1%)Admitted-Finance BAZARPURA NOWROZABAD MADHYA PRADESH 484555 DIST UMARIA M P | NOWROZABAD | UMARIA | MADHYA PRADESH | 484555 | ₹3.0 L+₹1.2 L (66.1%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SURESH ELECTRICALS L3 | ADARSH ELECTRICAL WORK L2 | Pioneer Enterprises L1 |
|---|---|---|---|---|---|---|
| 1.00Rewinding and repairing of 04 MVA Transformer 33KV / 6.6KV / 3.3KV HT power transformer Sl. No. 1212440 make M&B Switchgear Ltd of Amlai OCM of Sohagpur area, SECL | ||||||
| 1.01 | Replacement of primary winding (one limb) with new 99.96 grade copper as per transformer design (less copper scrap material value of the same quantity) | 400 | Kg | 459 ₹1,83,600 | 300 ₹1,20,000 Lowest | 390 ₹1,56,000 |
| 1.02 | Re-insulation recoiling of damage of secondary winding with (11mm X 3.9mm) thick strip | 250 | Kg | 120 ₹30,000 | 160 ₹40,000 | 35 ₹8,750 Lowest |
| 1.03 | Other insulation material of coil formation overall insulation | 1 | Job | 50,000 ₹50,000 | 35,000 ₹35,000 | 5,500 ₹5,500 Lowest |
| 1.04 | Labour charge including radiator | 1 | Job | 32,500 ₹32,500 | 30,000 ₹30,000 | 8,000 ₹8,000 Lowest |
| 2.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
₹4.0 L
EMD Value
₹5,000
Closing Date
26 Jun 2026, 5:00 pmClosed
Staff Officer EnM SECL Sohagpur Area
EnM Dept GM Office SECL Sohagpur Area PO Dhanpuri Distt Shahdol MP 9424141331
Rewinding and repairing of 04 MVA Transformer 33 kV 6point6KV 3 Point 3 HT Power Transformer Sl No 1212440 make M and B Switchgear Ltd of AmlaI OCM of Sohagpur Area SECL
2026_SECL_361072_1
SECL/SGP/EnM/eT/2026-27/390 Date 13.06.2026
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Amlai OCM
As per NIT and Tender Documents
4 documents required · 4 mandatory
₹5,000
9 Jul 2026
15 Jun 2026
29 Jun 2026
15 Jun 2026
26 Jun 2026
16 Jun 2026
15 Jun 2026 - 19 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Rewinding and repairing of 04 MVA Transformer 33KV / 6.6KV / 3.3KV HT power transformer Sl. No. 1212440 make M&B Switchgear Ltd of Amlai OCM of Sohagpur area, SECL | |||||
| 1.01 | Replacement of primary winding (one limb) with new 99.96 grade copper as per transformer design (less copper scrap material value of the same quantity) | 400 | Kg | - | - |
| 1.02 | Re-insulation recoiling of damage of secondary winding with (11mm X 3.9mm) thick strip | 250 | Kg | - | - |
| 1.03 | Other insulation material of coil formation overall insulation | 1 | Job | - | - |
| 1.04 | Labour charge including radiator | 1 | Job | - | - |
| 2Total impact of GST for the purpose of CTC | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.83 MB
Tendernotice_2.pdf
PDF • 1.43 MB
Tendernotice_3.pdf
PDF • 0.91 MB
BOQ_373949.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .