| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 LAccepted-Finance 36 137 THANGAMAPURIPATTINAM METTUR DAM 636 402 | SALEM | TAMIL NADU | 636402 | ₹4.3 L | L1 | Accepted-Finance L1 |
| Sl No | Description | Qty | Unit | SRI V M A ENTERPRISES L1 |
|---|---|---|---|---|
| 1.00 | Charges for removing of H2 cooler inlet & outlet bends and providing Dummy plates. | 8 | Nos | 618 ₹4,944 Lowest |
| 2.00 | Charges for dismantling 1 No. H2 cooler from Generator and placing at convenient location. | 4 | Nos | 4,260 ₹17,040 Lowest |
| 3.00 | Charges for Dismantling of water boxes of the released coolers, removing of scales in tubes by brush and flushing of cooler tube with water, replacing the gaskets with new one, reassembling the water boxes, replacing the damaged HRR flaps. | 4 | Nos | 5,804 ₹23,216 Lowest |
| 4.00 | Charges for Complete Inspection of 1 No. Hydrogen cooler tunnels and cleaning the inner side of tunnels, inspection of Hydrogen diffusing system nozzles & pipes and cleaning of oil fumes inside the casing. | 4 | Nos | 7,751 ₹31,004 Lowest |
| 5.00 | Charges for checking the healthiness by conducting hydraulic test. | 4 | Nos | 4,018 ₹16,072 Lowest |
| 6.00 | Charges for assembling the 1 No. cooler in the Generator | 4 | Nos | 4,287 ₹17,148 Lowest |
| 7.00 | Charges for dismantling the dummy plates and assembling of inlet and outlet bends with new gaskets in H2 cooler. | 8 | Nos | 2,910 ₹23,280 Lowest |
| 8.00 | Charges for conducting Air Tightness Test and attending miner leaks of H2 gas system. | 1 | Nos | 5,822 ₹5,822 Lowest |
| 9.00 | SEAL LINER:
Charges for dismantling the seal oil pipe lines, seal body and seal liner, slope cutting of seal liner, replacing seal liner silicon rubber cords and seal body gasket, revisioning of dismantled parts, checking the clearance between seal body & seal liner, connecting the seal oil pipe lines and connecting the seal oil pipe lines conducting the Seal slide test. | 4 | Nos | 59,087 ₹2,36,348 Lowest |
| 10.00 | Charges for dismantling & reassembling of intermediate rings of seal body side & bearing side and bearing top cover. | 4 | Nos | 11,927 ₹47,708 Lowest |
Tender Value
Refer Docs
EMD Value
₹3,900
Closing Date
29 May 2026, 2:00 pmClosed
CHIEF ENGINEER/MTPS-I
CHIEF ENGINEER/MTPS-I
MTPS-I ES Circle EMI UnitI Releasing of Hydrogen cooler in any one generator casing cleaning of the cooler tubes, replacing the water boxes gaskets, conducting hydraulic test ,reassembling of the hydrogen cooler with turbo generator casing and dism
2026_EB_676831_1
CE-MTPSI-SE-ES-EMI-OT01-26-27
Open Tender
Electrical Works
Works
365 days
MTPS-I/METTURDAM
AS PER TENDER SPECIFICATION
4 documents required · 4 mandatory
₹0
₹3,900
Yes
17 Jul 2026
13 May 2026
30 May 2026
13 May 2026
29 May 2026
13 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for removing of H2 cooler inlet & outlet bends and providing Dummy plates. | 8 | Nos | - | - |
| 2 | Charges for dismantling 1 No. H2 cooler from Generator and placing at convenient location. | 4 | Nos | - | - |
| 3 | Charges for Dismantling of water boxes of the released coolers, removing of scales in tubes by brush and flushing of cooler tube with water, replacing the gaskets with new one, reassembling the water boxes, replacing the damaged HRR flaps. | 4 | Nos | - | - |
| 4 | Charges for Complete Inspection of 1 No. Hydrogen cooler tunnels and cleaning the inner side of tunnels, inspection of Hydrogen diffusing system nozzles & pipes and cleaning of oil fumes inside the casing. | 4 | Nos | - | - |
| 5 | Charges for checking the healthiness by conducting hydraulic test. | 4 | Nos | - | - |
| 6 | Charges for assembling the 1 No. cooler in the Generator | 4 | Nos | - | - |
| 7 | Charges for dismantling the dummy plates and assembling of inlet and outlet bends with new gaskets in H2 cooler. | 8 | Nos | - | - |
| 8 | Charges for conducting Air Tightness Test and attending miner leaks of H2 gas system. | 1 | Nos | - | - |
| 9 | SEAL LINER:
Charges for dismantling the seal oil pipe lines, seal body and seal liner, slope cutting of seal liner, replacing seal liner silicon rubber cords and seal body gasket, revisioning of dismantled parts, checking the clearance between seal body & seal liner, connecting the seal oil pipe lines and connecting the seal oil pipe lines conducting the Seal slide test. | 4 | Nos | - | - |
| 10 | Charges for dismantling & reassembling of intermediate rings of seal body side & bearing side and bearing top cover. | 4 | Nos | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
BOQ_813260.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].