| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹57.2 LAccepted-AOC | ₹57.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹67.8 LRejected-Finance | ₹67.8 L | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical As Per Uploaded |
| 4 | Rejected-Technical | - | - | Rejected-Technical As Per Uploaded |
| Sl No | Description | Qty | Unit | santosh kumar pal L1 | M/S PRATAP NIRMAN SANSTHAN L2 |
|---|---|---|---|---|---|
| 1.00 | Dismentalling of brick work with cement mortar of parapet of both side including cost of all lead lift, labour and T&P etc.complete of work. | 2.12 | M3 | 400 ₹848 | 100 ₹212 |
| 2.00 | E/W In lip cutting for proper disposal,compaction and dressing i/c cost of all lead lift T &P material labour etc complete as per direction of engineer-in-charge.aising of slab by lifting divice including hiring charges with all carriage, expenditure, labour, T&P etc. for completion of work. | 191.27 | M3 | 70 ₹13,388.90 | 100 ₹19,127 |
| 3.00 | E/W in foundation for VRB and longitudinal & cross sleeper with proper dressing and manual compaction in all type of soil including of lead, lift T&P etc. complete as per direction of engineer-in-charge | 379.25 | M3 | 80 ₹30,340 | 125 ₹47,406.25 |
| 4.00 | E/W in filling in scouer section of bed by power transport lead up to 1km lift upto 1.50 m with manual compaction and dressing etc. complete of work. | 2,509.5 | M3 | 150 ₹3.8 L | 200 ₹5.0 L |
| 5.00 | Centering and Shuttering for foundation and sleeper including cost of all material labour T&P etc.complete as per direction of engineer-in-charge. | 455.75 | M3 | 150 ₹68,362.50 | 210 ₹95,707.50 |
| 6.00 | Laying C.C. 1:3:6 in foundation with crushed stone grit size 20 mm to 40 mm and coarse sand and including cost of all lead, lift, material, labour, T&P etc. completion of work. | 54.35 | M2 | 8,000 ₹4.3 L | 6,800 ₹3.7 L |
| 7.00 | Ist class B/W in 1:4 CM with C.sand and cement i/c cost of all material labour T&P etc complete of work. | 191.69 | M³ | 5,400 ₹10.4 L | 5,800 ₹11.1 L |
| 8.00 | Centering & shuttering for R.C.C. Slab & Bed Block including cost of all lead, lift, material, labour, T&P etc. complete. | 112.82 | M2 | 800 ₹90,256 | 900 ₹1.0 L |
| 9.00 | Cutting bending and binding of steel bar for reinforcement including cost of steel lead, lift, material, labour, T&P etc. complete. | 2.1 | MT | 5,500 ₹11,528 | 70,000 ₹1.5 L |
| 10.00 | Laying and fixing of joint filler board i/c cost of all material labour T&P etc complete. | 14.43 | M2 | 800 ₹11,544 | 100 ₹1,443 |
Tender Value
₹77.1 L
EMD Value
₹1.5 L
Closing Date
13 Feb 2026, 3:00 pmClosed
S.E, Irrigation Construction Circle, Basti
S.E, Irrigation Construction Circle, Basti
Repairing, Slab Rasing and Protection work of 12 Nos. Old Pucca structure and construction of 03 Nos. New VRB between Km. 10.000 To Km. 14.000 of Bhatpar Dy in Santkabirnagar District.
2026_UPIDC_1112432_3
09/S.E/2025-26
Open Tender
Civil Works
180 days
Khalilabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,910
₹1.5 L
8 May 2026
6 Feb 2026
13 Feb 2026
6 Feb 2026
13 Feb 2026
7 Feb 2026
Dismentalling of brick work with cement mortar of parapet of both side including cost of all lead lift, labour and T&P etc.complete of work.
E/W In lip cutting for proper disposal,compaction and dressing i/c cost of all lead lift T &P material labour etc complete as per direction of engineer-in-charge.aising of slab by lifting divice including hiring charges with all carriage, expenditure, labour, T&P etc. for completion of work.
E/W in foundation for VRB and longitudinal & cross sleeper with proper dressing and manual compaction in all type of soil including of lead, lift T&P etc. complete as per direction of engineer-in-charge
E/W in filling in scouer section of bed by power transport lead up to 1km lift upto 1.50 m with manual compaction and dressing etc. complete of work.
Centering and Shuttering for foundation and sleeper including cost of all material labour T&P etc.complete as per direction of engineer-in-charge.
Laying C.C. 1:3:6 in foundation with crushed stone grit size 20 mm to 40 mm and coarse sand and including cost of all lead, lift, material, labour, T&P etc. completion of work.
Ist class B/W in 1:4 CM with C.sand and cement i/c cost of all material labour T&P etc complete of work.
Centering & shuttering for R.C.C. Slab & Bed Block including cost of all lead, lift, material, labour, T&P etc. complete.
Cutting bending and binding of steel bar for reinforcement including cost of steel lead, lift, material, labour, T&P etc. complete.
Laying and fixing of joint filler board i/c cost of all material labour T&P etc complete.
Laying R.C.C. 1:1.5:3 in Bed Block & Slab with chopan coarse sand & dalla crushed stone grit size 10 mm to 20 mm including cost of all lead, lift, material, labour, T&P etc. completion of work.
Laying c.c. 1:1.5:3 with dala crushed stone grit 4.75mm-20.00mm size and chopan coarse sand and i/c cost of all, material labour t&p etc.
Struck deep cement pointing 1:2 C.M in brick work i/c cost of all material labour T&P etc. complete of work.
E/W in making of ramp for aproch of V.R.B. of both side including mannually compaction with all lead lift labour T&P etc. complete of work.
Ist class brick on edge soling including preparation of sub grade and filling joint local earth on ramp.
Preparation of sub grade for lining work including cost of all material labour T&P etc.complete as per direction of engineer-in-charge.
Laying local sand as filler material in bed and side slope with cost of material, labour etc. As per required for proper completion of work.complete as per direction of engineer-in-charge.
Supply and laying LDPE film 200 micron thick in bed and side slope over filler material including cost of all material, labour etc. required for proper completion of work.
Laying 75 mm thick CC 1:1.5:3 grade with dala crust stone grit size 4.75 to 20 mm and C-sand for lining by manual in bed and side slope including cost of all material, labour etc. required for proper completion of work. complete as per direction of engineer-in-charge.
Making construction joint , painting with sealing primer and filling with sealing compund i/c cost of all material labour T & P etc complete.
Making and Fixing of Wheel Guard in U/S & D/S of VRBs & DRBs with cost of all carriage, material, labour T&P etc. with comlete of work.
Painting on old surface of B/W two coat i/c cost of all materials labour T&P etc. required for proper completion of work.
Painting on New surface of B/W two coat i/c cost of all materials labour T&P etc. required for proper completion of work.
Writing letter above 80mm size on VRBs & DRBs of bhatpar dy including all material, labour, paint, brush and. T&P etc. complete of work.
12 mm thick cement plaster 1:3 c:m with coarse sand i/c cost of all materials labour T&P etc. required for proper completion of work.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.48 MB
Buklet.pdf
Tender Documents • 2.97 MB
BOQ_2057540.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid