Tender Value
₹46.8 Cr
EMD Value
₹56.8 L
Closing Date
20 Jul 2026, 3:00 pm
EXecutive Engineer
O/o the Executive Engineer, PWD Division West Road-2/M-112N, Road No. 43, Sainik Vihar, Delhi-110034
Remodeling of drain as per Master Plan of Delhi at Najafgarh Road from Moti Nagar to Raja Garden under Sub-Division WR-21, Division West Road-2 (M-112N), New Delhi during 2026-27
2026_PWD_294431_1
19/CE/North/PWD/2026-27 (10/EE/PWD/M-112N/2026-27)
Open Tender
Civil Works
150 days
Sub Division WR-21
Please refer Tender documents.
15 documents required · 15 mandatory
₹0
₹56.8 L
Chief Engineer, North Maint. Zone, PWD (GNCTD)
25 Jun 2026
25 Jun 2026
20 Jul 2026
25 Jun 2026
20 Jul 2026
25 Jun 2026
3 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and for all lift as directed by Engineer-in-Charge. | |||||
| 1.1 | All kinds of soil | 9,310 | cum | 177.5 | ₹16,52,525 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | 4,655 | cum | 196 | ₹9,12,380 |
| 3Providing and laying in position ready mixed or site batched design mix cement concrete for plain cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering and finishing as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the minimum specified cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth level : | |||||
| 3.1 | Concrete of M10 grade with minimum cement content of 220 Kg /Cum | 561 | cum | 8,835.15 | ₹49,56,519.15 |
| 4Centering and shuttering including strutting, propping etc. and removal of form for : | |||||
| 4.1 | Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 5,463 | sqm | 842.5 | ₹46,02,577.5 |
| 4.2 | Suspended floors, roofs, landings, balconies and access platform. | 1,444 | sqm | 927.25 | ₹13,38,949 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level.
Thermo-Mechanically Treated bars of grade Fe-500 D or more. | 3,34,000 | Kg | 107.85 | ₹3,60,21,900 |
| 6Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement All works up to plinth level. | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.55 MB
BOQ_391475.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid